Hickory Park Solar Hybrid
5157 Hwy 112, Camilla, GA 31730Plant Summary Information
Hickory Park Solar Hybrid is ranked #24 out of 244 power plants in Georgia in terms of total annual net electricity generation.
Hickory Park Solar Hybrid generated 86.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Hickory Park Solar Hybrid |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Mitchell County, GA |
| Initial Operation Date | June 2022 |
| Last Update | Mar 2026 |
| Annual Generation | 429.8 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,531 out of 12,332 Power Plants Nationwide | |
| Ranked #151 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #24 out of 244 Georgia Power Plants | |
| Ranked #5 out of 150 Georgia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Hickory Park Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hickory Park Solar Hybrid.
Monthly Net Generation for Hickory Park Solar Hybrid
Monthly Plant Fuel Consumption for Hickory Park Solar Hybrid
Hickory Park Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Hickory Park Solar Hybrid (63522) |
| Plant Address | 5157 Hwy 112, Camilla, GA 31730 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 31.26968, -84.17632 |
| Generation Dates on File | Jun 2022 to Mar 2026 |
| Initial Operation Date | June 2022 |
| Annual Generation | 429.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator HPBAT Details Operating June 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 40 MW |
| Summer Capacity | 40 MW |
| Winter Capacity | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 80 |
|---|---|
| Maximum Charge Rate | 42 MW |
| Maximum Discharge Rate | 40 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 240 |
| Storage Enclosure Type | OT |
| Co Located Renewable Firming | P |
| Excess Wind And Solar Generation | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 63522 |
| Direct Support Gen Id | HPRK |
| Support T D Asset | Yes |
Generator HPRK Details Operating June 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 195.5 MW |
| Summer Capacity | 195.5 MW |
| Winter Capacity | 195.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 268.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hickory Park Solar Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #141 | Mesquite Solar 3, LLC | Tonopah, AZ | 445.1 GWh |
| #142 | Pike Solar Hybrid | Fountain, CO | 443.7 GWh |
| #143 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #144 | White Wing Solar | Yuma, AZ | 443.3 GWh |
| #145 | Blue Jay Solar I, LLC | Iola, TX | 437.0 GWh |
| #146 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #147 | Cutlass Solar II | Richmond, TX | 438.9 GWh |
| #148 | Brazoria County Solar Project (Danciger) | Damon, TX | 438.1 GWh |
| #149 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 437.2 GWh |
| #150 | Brazoria West | Damon, TX | 436.4 GWh |
| #152 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 430.0 GWh |
| #153 | Greasewood Solar | Fort Stockton, TX | 433.4 GWh |
| #154 | Pleinmont Solar 2 | Spotsylvania, VA | 432.3 GWh |
| #155 | Sandrini Solar 200 | Mettler, CA | 432.2 GWh |
| #156 | Serrano | Marana, AZ | 408.1 GWh |
| #157 | Big Cypress Solar, LLC | Crawfordsville, AR | 429.0 GWh |
| #158 | Pearl River Solar Park LLC | Morton, MS | 424.2 GWh |
| #159 | AP Sunray LLC | Knippa, TX | 422.1 GWh |
| #160 | Muscle Shoals | Cherokee, AL | 419.1 GWh |
| #161 | Harquahala Sun Solar Project | Tonopah, AZ | 417.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hickory Park Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albany Green Energy | Albany, GA | 106.6 GWh | 20.2 mi |
| Baconton Power Plant | Baconton, GA | 74.0 GWh | 9.9 mi |
| Bainbridge Solar | Bainbridge, GA | 1.9 GWh | 33.8 mi |
| BE Solar LLC | Atlanta, GA | 5.8 GWh | 33.2 mi |
| Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh | 25 mi |
| Camilla Solar Energy Project | Camilla, GA | 363.8 GWh | 3.1 mi |
| Camilla Solar Plant | Pelham, GA | 26.2 GWh | 6.5 mi |
| Decatur County Solar Project | Bainbridge, GA | 42.2 GWh | 33.9 mi |
| Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh | 33.2 mi |
| Decatur Solar | Climax, GA | 482.6 GWh | 32.8 mi |
| Denver Braswell PV | Moultrie, GA | 614.0 MWh | 22.3 mi |
| Dougherty County Solar, LLC | Albany, GA | 268.8 GWh | 18.5 mi |
| Flint River | Albany, GA | 34.7 GWh | 23.1 mi |
| Marine Corps Logistics Base Solar | Albany, GA | 56.0 GWh | 20.7 mi |
| OE_GA3 | Camilla, GA | 121.3 GWh | 5.4 mi |
| Oil Dri 2 Solar | Ochlocknee, GA | 2.9 GWh | 20.3 mi |
| Sowega Power | Baconton, GA | 53.4 GWh | 9.9 mi |
| SR Odom | Moultrie, GA | 44.7 GWh | 37 mi |
| Tift Bowen | Tifton, GA | 4.6 GWh | 38.7 mi |
| Walton Bainbridge Power Facility | Bainbridge, GA | 64.0 MWh | 33.1 mi |