West of the Pecos Solar
TBD, TBD, TX 79772Plant Summary Information
West of the Pecos Solar is ranked #123 out of 245 solar farms in Texas in terms of total annual net electricity generation.
West of the Pecos Solar generated 58.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | West of the Pecos Solar |
|---|---|
| Utility Name | RWE Clean Energy |
| Location | Reeves County, TX |
| Initial Operation Date | December 2019 |
| Last Update | May 2026 |
| Annual Generation | 224.0 GWh |
| Annual Consumption | 855.6 k MMBtu |
| Ranked #2,393 out of 13,081 Power Plants Nationwide | |
| Ranked #418 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #452 out of 852 Texas Power Plants | |
| Ranked #123 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
E ON Climate Renewables N America LLC (2018 to 2018) RWE Renewables Americas LLC (2019 to 2019) West of the Pecos Solar (2020 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) RWE Clean Energy (2025 to 2025) |
Map of West of the Pecos Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West of the Pecos Solar.
Monthly Net Generation for West of the Pecos Solar
Monthly Plant Fuel Consumption for West of the Pecos Solar
West of the Pecos Solar Details
| Summary Information | |
|---|---|
| Plant Name | West of the Pecos Solar (62415) |
| Plant Address | TBD, TBD, TX 79772 |
| Utility | RWE Clean Energy (67192) |
| Latitude, Longitude | 31.4308, -103.7289 |
| Generation Dates on File | Dec 2019 to May 2026 |
| Initial Operation Date | December 2019 |
| Annual Generation | 224.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 19-160 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WOTP1 Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | W_PECOS_UNIT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | W_PECOS_UNIT1 |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 52 |
| DC Net Capacity | 130 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
West of the Pecos Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #408 | Three Peaks Power | Cedar City, UT | 228.7 GWh |
| #409 | Ivanpah 2 | Nipton, CA | 236.1 GWh |
| #410 | Sauk Solar Park | Union City, MI | 228.5 GWh |
| #411 | Felina | Fabens, TX | 228.2 GWh |
| #412 | Prairie Mist Solar | Montrose, AR | 228.2 GWh |
| #413 | Roadrunner Solar and BESS | Cochise, AZ | 219.3 GWh |
| #414 | Assembly Solar II LLC | Lennon, MI | 226.3 GWh |
| #415 | Albemarle Beach Solar | Roper, NC | 225.7 GWh |
| #416 | East Pecos Solar | McCamey, TX | 225.1 GWh |
| #417 | Prairie State Solar Project | Swanwick Township, IL | 224.3 GWh |
| #419 | Ross County Solar, LLC | Greenfield, OH | 223.2 GWh |
| #420 | Martin County Solar Project, LLC | Pilgrim, KY | 223.1 GWh |
| #421 | SR Arlington II | Blakely, GA | 223.1 GWh |
| #422 | Techren Solar I LLC | Boulder, NV | 222.9 GWh |
| #423 | Wagyu | Damon, TX | 222.7 GWh |
| #424 | Butler Solar Project 103 | Butler, GA | 221.7 GWh |
| #425 | Blevins Solar & Storage | Eddy, TX | 213.4 GWh |
| #426 | Fern Solar LLC | Battleboro, NC | 219.7 GWh |
| #427 | Willow Spring Solar, LLC | Rosamond, CA | 219.5 GWh |
| #428 | BPL Files Solar | Itasca, TX | 219.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West of the Pecos Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aragorn Solar Project | Van Horn, TX | 323.8 GWh | 46.5 mi |
| Barilla Solar | Fort Stockton, TX | 52.9 GWh | 39.5 mi |
| Greasewood II LLC | Girvin, TX | 846.6 GWh | 70 mi |
| Hayhurst New Mexico Solar | Malaga, NM | 56.6 GWh | 51 mi |
| Hayhurst Texas Solar | Orla, TX | 70.1 GWh | 33.9 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 220.4 GWh | 65.7 mi |
| Oberon IA | Odessa, TX | 262.9 GWh | 63.4 mi |
| Oberon IB | Odessa, TX | 47.8 GWh | 63.4 mi |
| Permian Basin | Monahans, TX | 669.5 GWh | 46.3 mi |
| Phoebe Solar | Kermit, TX | 515.5 GWh | 58.1 mi |
| RE Roserock | Fort Stockton, TX | 369.0 GWh | 41 mi |
| SolaireHolman Solar Project | Alpine, TX | 88.7 GWh | 69.1 mi |
| SPS1 Dollarhide | Jal, NM | 22.5 GWh | 59.3 mi |
| SPS2 Jal | Jal, NM | 21.8 GWh | 61.1 mi |
| SPS5 Hopi | Carlsbad, NM | 20.8 GWh | 69.8 mi |
| Swift Air Solar I | Goldsmith, TX | 398.2 GWh | 65.1 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 530.6 GWh | 40.1 mi |
| Taygete II Energy Project | Coyanosa, TX | 474.4 GWh | 39.3 mi |
| Titan Solar Project | Van Horn, TX | 550.8 GWh | 46.8 mi |
| WAL897 | Fort Stockton, TX | 83.0 MWh | 61 mi |