Roscoe Wind Farm LLC
5722 County Rd. 466, Roscoe, TX 79545Plant Summary Information
Roscoe Wind Farm LLC is ranked #146 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Roscoe Wind Farm LLC generated 89.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Roscoe Wind Farm LLC |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Nolan County, TX |
| Initial Operation Date | February 2008 |
| Last Update | Dec 2025 |
| Annual Generation | 364.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,726 out of 12,613 Power Plants Nationwide | |
| Ranked #508 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #338 out of 816 Texas Power Plants | |
| Ranked #146 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Roscoe Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roscoe Wind Farm LLC.
Monthly Net Generation for Roscoe Wind Farm LLC
Monthly Plant Fuel Consumption for Roscoe Wind Farm LLC
Roscoe Wind Farm LLC Details
| Summary Information | |
|---|---|
| Plant Name | Roscoe Wind Farm LLC (56593) |
| Plant Address | 5722 County Rd. 466, Roscoe, TX 79545 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 32.4694, -100.6664 |
| Generation Dates on File | Feb 2008 to Dec 2025 |
| Initial Operation Date | February 2008 |
| Annual Generation | 364.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 07-78 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator RO1 Details Operating February 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | TKWSW_ROSCOE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TKWSW_ROSCOE |
| Nameplate Capacity | 209 MW |
| Summer Capacity | 209 MW |
| Winter Capacity | 209 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2008 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 209 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 209 |
|---|---|
| Predominant Turbine Manufacturer | Mitsubishi |
| Predominant Turbine Model Number | MWT-1000A |
| Design Wind Speed | 18.3 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 226.4 |
Roscoe Wind Farm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #498 | Hoopeston Wind LLC | Rossville, IL | 371.3 GWh |
| #499 | Los Vientos Wind 1B | Sebastian, TX | 370.3 GWh |
| #500 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 370.3 GWh |
| #501 | Goshen Phase II | Idaho Falls, ID | 369.2 GWh |
| #502 | Glacier Hills | Cambria, WI | 368.6 GWh |
| #503 | Dunlap | Medicine Bow, WY | 366.5 GWh |
| #504 | Tule Wind LLC | Boulevard, CA | 365.1 GWh |
| #505 | Majestic 1 Wind Farm | Panhandle, TX | 365.1 GWh |
| #506 | Tuscola Bay Wind | Reese, MI | 364.8 GWh |
| #507 | Alta Wind Energy Center II | Mojave, CA | 364.6 GWh |
| #509 | McAdoo Wind Energy LLC | McAdoo, TX | 363.6 GWh |
| #510 | Alta Wind Energy Center III | Mojave, CA | 363.2 GWh |
| #511 | Palmas Wind, LLC | Rio Hondo, TX | 362.5 GWh |
| #512 | Minco Wind III, LLC | Minco, OK | 362.5 GWh |
| #513 | White Rock West Wind Project | Anadarko, OK | 362.4 GWh |
| #514 | Breckinridge Wind Project LLC | Enid, OK | 362.2 GWh |
| #515 | Duran Mesa LLC | Duran, NM | 362.2 GWh |
| #516 | Crescent Wind Park | Hillsdale, MI | 362.1 GWh |
| #517 | Barton Windpower LLC | Kensett, IA | 360.9 GWh |
| #518 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 359.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roscoe Wind Farm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 22.8 mi |
| Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 5 mi |
| Coyote Wind LLC | Snyder, TX | 646.1 GWh | 28.7 mi |
| EG178 Facility | Snyder, TX | 713.1 GWh | 25.5 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 5.4 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 5.1 mi |
| Lumina II Solar Project | Snyder, TX | 700.2 GWh | 29 mi |
| Maryneal Windpower | Maryneal, TX | 545.0 GWh | 21.3 mi |
| Mesquite Star | Roscoe, TX | 1.2 TWh | 25 mi |
| Morgan Creek | Colorado City, TX | 23.5 GWh | 17.2 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 792.3 GWh | 8.2 mi |
| Scurry County Wind II | Snyder, TX | 164.9 GWh | 18.7 mi |
| Scurry County Wind LP | Snyder, TX | 205.4 GWh | 25.8 mi |
| Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 20.5 mi |
| Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 19.2 mi |
| Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 18.9 mi |
| Sweetwater Wind 4 LLC | Roscoe, TX | 633.4 GWh | 13.5 mi |
| Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 19.3 mi |
| Trent Wind Farm | Trent, TX | 515.0 GWh | 25.3 mi |
| WAL1272 | Snyder, TX | 176.0 MWh | 21.2 mi |