Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Sayreville | Sayreville Power, LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 525.0 MWh | Feb 1972 | Dec 2025 | Natural Gas : 63.7% Distillate Fuel Oil : 36.3% |
| Suntex Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Riley, OR | Bonneville Power Administration (BPAT) | 24.7 GWh | Jun 2020 | Dec 2025 | Solar |
| West Hines Solar I, LLC | SC Oregon 2 Lessor Parent, LLC | Hines, OR | Bonneville Power Administration (BPAT) | 23.6 GWh | May 2020 | Dec 2025 | Solar |
| Alkali Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Silver Lake, OR | Bonneville Power Administration (BPAT) | 25.8 GWh | May 2020 | Dec 2025 | Solar |
| Rock Garden Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Fort Rock, OR | Bonneville Power Administration (BPAT) | 24.7 GWh | May 2020 | Dec 2025 | Solar |
| Gaskill Rd Community Solar Farm CSG | Scale Sustainable I, LLC | Owego, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Villa Roma Rd #3 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Villa Roma Rd #4 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Dryden Rd #2 Community Solar Farm CSG | Scale Sustainable I, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Turner Rd Community Solar Project | Scale Sustainable I, LLC | Baldwin, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2019 | Dec 2025 | Solar |
| Sacket Lake Rd #2 Community Solar Farm | Scale Sustainable I, LLC | Thompson, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Hospital Rd Community Solar Farm CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Woodoak Drive Community Solar Farm CSG | Scale Sustainable I, LLC | Tusten, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Baer Road CSG | Scale Sustainable I, LLC | New York, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Dec 2017 | Dec 2025 | Solar |
| Rosemond Solar Community Solar | Scale Sustainable I, LLC | Fallsburg, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Dec 2020 | Dec 2025 | Solar |
| Maple North 1 | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 7.0 GWh | May 2024 | Dec 2025 | Solar |
| Maple North 2 | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 6.3 GWh | May 2024 | Dec 2025 | Solar |
| Maple West | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 9.8 GWh | May 2024 | Dec 2025 | Solar |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2009 | Dec 2025 | Solar |
| CSU Pueblo | Scale Sustainable I, LLC | Pueblo, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.7 GWh | Nov 2008 | Dec 2025 | Solar |
| FedEx Woodbridge | Scale Sustainable I, LLC | Keasbey, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2009 | Dec 2025 | Solar |
| Neuse River Solar Farm | Scale Sustainable I, LLC | Raleigh, NC | Duke Energy Carolinas (DUK) | 1.3 GWh | Nov 2011 | Dec 2025 | Solar |
| Scandia Community Solar Garden | Scandia CSG LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jun 2018 | Dec 2025 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 14.2 GWh | Sep 2017 | Dec 2025 | Solar |
| Scenic Hill Solar III | Scenic Hill Solar III LLC | Clarksville, AR | Southwestern Power Administration (SPA) | 9.7 GWh | Nov 2017 | Dec 2025 | Solar |
| School Sisters CSG | School Sisters CSG LLC | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Apr 2018 | Dec 2025 | Solar |
| Schueler Community Solar | Schueler Community Solar LLC | Annandale, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jul 2020 | Dec 2025 | Solar |
| Schull CSG | Schull CSG LLC | Mapleton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Oct 2021 | Dec 2025 | Solar |
| Schulte 2 Community Solar | Schulte 2 Community Solar | Lacon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2020 | Dec 2025 | Solar |
| St Nicholas Cogen Project | Schuylkill Energy Resource Inc | Shenandoah, PA | PJM Interconnection, LLC (PJM) | 657.9 GWh | Aug 1990 | Aug 2026 | Waste/Other Coal : 99.6% |
| Schwinghamer Project CSG | Schwinghamer Community Solar LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Scituate Wind | Scituate Wind LLC | Scituate, MA | ISO New England (ISNE) | 2.5 GWh | Feb 2012 | Dec 2025 | Wind |
| Cawelo Water District Solar | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 6.9 GWh | Sep 2023 | Dec 2025 | Solar |
| IRE Solar I, LLC | Scotch Settlement | Gouverneur, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Heart of Texas Wind Project | Scout Clean Energy LLC | Brady, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 644.4 GWh | Apr 2020 | Aug 2026 | Wind |
| Scrubgrass Reclamation CO. LP. | Scrubgrass Reclamation CO. LP. | Kennerdell, PA | PJM Interconnection, LLC (PJM) | 438.9 GWh | May 1993 | Dec 2025 | Waste/Other Coal : 99.7% |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| Aragorn Solar Project | SE Aragorn, LLC | Van Horn, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 349.3 GWh | Nov 2021 | Aug 2026 | Solar |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.5 GWh | May 2022 | Aug 2026 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 509.8 GWh | Nov 2021 | Aug 2026 | Solar |
| Juno Solar Project | SE Juno, LLC | Lamesa, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 751.8 GWh | May 2021 | Aug 2026 | Solar |
| Titan Solar Project | SE Titan, LLC | Van Horn, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 572.5 GWh | Nov 2021 | Aug 2026 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2018 | Dec 2025 | Solar |
| Seadrift Coke LP | Seadrift Coke L P | Port Lavaca, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 35.5 GWh | Oct 1983 | Aug 2026 | Petroleum Coke : 69.4% Other Gas : 27.2% Natural Gas : 3.3% |
| Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 7.3 GWh | Apr 2022 | Dec 2025 | Solar |
| Searcy Solar Hybrid | Searcy Solar, LLC | Searcy, AR | Midcontinent Independent System Operator, Inc. (MISO) | 170.6 GWh | Dec 2021 | Aug 2026 | Solar |
| Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 134.6 GWh | Nov 1947 | Aug 2026 | Bituminous Coal : 63.8% Natural Gas : 36.2% |
| Sebree Solar I | Sebree Solar, LLC | Robards, KY | Midcontinent Independent System Operator, Inc. (MISO) | 482.6 GWh | Aug 2025 | Aug 2026 | Solar |
| Sebree Solar II | Sebree Solar, LLC | Robards, KY | Midcontinent Independent System Operator, Inc. (MISO) | 28.1 GWh | - | Aug 2026 | Solar |
| Tompkins Cortland Community College | SEC LHNY Solar One, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Apr 2015 | Sep 2025 | Solar |
| Segunda II (CSG) | Segunda Solar II, LLC | Streator, IL | PJM Interconnection, LLC (PJM) | 4.8 GWh | Oct 2021 | Dec 2025 | Solar |
| Selkirk Cogen | Selkirk Cogen Partners LP | Selkirk, NY | New York Independent System Operator (NYIS) | 346.4 GWh | Mar 1992 | Oct 2025 | Natural Gas |
| Selmer I | Selmer North Solar I, LLC | Selmer, TN | Tennessee Valley Authority (TVA) | 29.7 GWh | Nov 2016 | Aug 2026 | Solar |
| Selmer II | Selmer North Solar II, LLC | Selmer, TN | Tennessee Valley Authority (TVA) | 14.6 GWh | Nov 2016 | Aug 2026 | Solar |
| SEMASS Resource Recovery | SEMASS Partnership | West Wareham, MA | ISO New England (ISNE) | 537.3 GWh | Jun 1988 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.8% Biogenic Municipal Solid Waste : 44.0% Natural Gas : 2.0% |
| Midulla Generating Station | Seminole Electric Cooperative Inc | Bowling Green, FL | Seminole Electric Cooperative (SEC) | 3.3 TWh | Dec 2001 | Aug 2026 | Natural Gas : 99.9% |
| Seminole (FL) | Seminole Electric Cooperative Inc | Palatka, FL | Seminole Electric Cooperative (SEC) | 9.8 TWh | Jan 1984 | Aug 2026 | Natural Gas : 63.0% Bituminous Coal : 36.9% |
| Sendero | Sendero Wind Energy, LLC | Hebbronville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 274.3 GWh | Nov 2015 | Dec 2025 | Wind |
| Seneca Energy | Seneca Energy II | Seneca Falls, NY | New York Independent System Operator (NYIS) | 25.6 GWh | Feb 1996 | Jul 2026 | Landfill Gas |
| Ontario LFGTE | Seneca Energy II | Stanley, NY | New York Independent System Operator (NYIS) | 77.7 GWh | Oct 2003 | Dec 2025 | Landfill Gas |
| Seneca Nation Cattaraugus Wind Turbine | Seneca Nation | Irving, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2017 | Dec 2025 | Wind |
| Batavia Power Plant | Seneca Power Partners LP | Batavia, NY | New York Independent System Operator (NYIS) | 17.6 GWh | Aug 1992 | Dec 2025 | Natural Gas |
| Seneca Sustainable Energy LLC | Seneca Sustainable Energy LLC | Eugene, OR | Bonneville Power Administration (BPAT) | 120.7 GWh | Mar 2011 | Dec 2025 | Wood/Wood Waste Solids |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 189.3 GWh | Apr 2013 | Aug 2026 | Natural Gas |
| Dome Project | Sentinel Peak Resources California, LLC | Fellows, CA | California Independent System Operator (CISO) | 48.4 GWh | Jul 1988 | Dec 2025 | Natural Gas |
| Welport Lease Project | Sentinel Peak Resources California, LLC | McKittrick, CA | California Independent System Operator (CISO) | 33.7 GWh | Feb 1990 | Dec 2025 | Natural Gas |
| Mid-Georgia Cogeneration Facility | SEPG MGA, LLC | Kathleen, GA | Southern Company Services, Inc. - Trans (SOCO) | 176.5 GWh | Sep 1997 | Aug 2026 | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2023 | Dec 2025 | Solar |
| SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2020 | Dec 2025 | Solar |
| Mill Run Windpower LLC | Sequitur Renewables, LLC | Mill Run, PA | PJM Interconnection, LLC (PJM) | 16.2 GWh | Nov 2001 | Aug 2026 | Wind |
| Somerset Windpower LLC | Sequitur Renewables, LLC | Ohiopyle, PA | PJM Interconnection, LLC (PJM) | 6.6 GWh | Nov 2001 | Aug 2026 | Wind |
| Waymart Wind | Sequitur Renewables, LLC | Forest City, PA | PJM Interconnection, LLC (PJM) | 100.7 GWh | Sep 2003 | Aug 2026 | Wind |
| Mountaineer Wind Energy Center | Sequitur Renewables, LLC | Thomas, WV | PJM Interconnection, LLC (PJM) | 111.7 GWh | Nov 2002 | Aug 2026 | Wind |
| Meyersdale Windpower, LLC | Sequitur Renewables, LLC | Meyersdale, PA | PJM Interconnection, LLC (PJM) | 48.5 GWh | Nov 2003 | Aug 2026 | Wind |
| Diablo Winds LLC | Sequitur Renewables, LLC | Livermore, CA | California Independent System Operator (CISO) | 30.5 GWh | Nov 2004 | Dec 2025 | Wind |
| Sequoia 1 | Sequoia 1 Solar Project | Cisco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 703.0 GWh | Nov 2025 | Aug 2026 | Solar |
| Serrano | Serrano Solar, LLC | Marana, AZ | Arizona Public Service Company (AZPS) | 408.4 GWh | Mar 2025 | Aug 2026 | Solar |
| Sesqui-C Solar (CSG) | Sesqui-C Solar, LLC | Yamhill, OR | Portland General Electric Company (PGE) | 4.2 GWh | Nov 2022 | Dec 2025 | Solar |
| Settlers Solar | Settlers Solar, LLC | Lunenberg, MA | ISO New England (ISNE) | 7.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Seven Cowboy Wind Project, LLC | Seven Cowboy Wind Project, LLC | Rocky, OK | Southwest Power Pool (SWPP) | 1.3 TWh | Feb 2023 | Aug 2026 | Wind |
| Severson Garden | Severson HoldCo LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Sep 2020 | Dec 2025 | Solar |
| Seward (PA) | Seward Generating LLC | New Florence, PA | PJM Interconnection, LLC (PJM) | 3.1 TWh | Oct 2004 | Aug 2026 | Waste/Other Coal : 99.8% |
| Seward Wind Farm | Seward Wind LLC | Seward, NE | Southwest Power Pool (SWPP) | 6.3 GWh | Nov 2017 | Dec 2025 | Wind |
| Milton Hydro | SFR Hydro Cor | Milton, NH | ISO New England (ISNE) | 4.6 GWh | Dec 1913 | Dec 2025 | Water |
| Berry Placerita Cogen | Shadow Wolf Energy | Santa Clarita, CA | California Independent System Operator (CISO) | 4.8 GWh | Feb 1990 | Aug 2026 | Natural Gas |
| Shady Hills Generating Station | Shady Hills Power Co LLC | Shady Hills, FL | Duke Energy Florida, Inc. (FPC) | 356.6 GWh | Dec 2001 | Aug 2026 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 305.8 GWh | Sep 2023 | Aug 2026 | Wind |
| Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 41.2 GWh | Apr 2015 | Dec 2025 | Solar |
| Shallow Basket | Shallow Basket Energy, LLC | Dulce, NM | Public Service Company of New Mexico (PNM) | 381.6 GWh | Jul 2025 | Aug 2026 | Solar |
| Shamrock Wind | Shamrock Wind LLC | TBD, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 859.1 GWh | Nov 2023 | Aug 2026 | Wind |
| Shane's Wind Machine | Shane's Wind Machine LLC | Ruthton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Jun 2006 | Jan 2025 | Wind |
| Shankle Solar Center LLC | Shankle Solar Center LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | Dec 2014 | Dec 2025 | Solar |
| Shaokatan Hills LLC | Shaokatan Hills, LLC (Longroad) | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.0 GWh | Jul 1999 | Dec 2025 | Wind |
| White Plains RFP Shapham Place | Shapham Place Solar Project 2020 LLC | White Plains, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Apr 2022 | Dec 2025 | Solar |
| Grossmont Hospital | Sharp Grossmont Hospital | La Mesa, CA | California Independent System Operator (CISO) | 29.2 GWh | Jul 1983 | Dec 2025 | Natural Gas |
| Roaring Creek Water Power | Shasta Hydroelectric Inc | Montgomery Creek, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 1986 | Dec 2025 | Water |
| Wheelabrator Shasta | Shasta Sustainable Resource Management, Inc. | Anderson, CA | California Independent System Operator (CISO) | 289.9 GWh | Sep 1987 | Aug 2026 | Wood/Wood Waste Solids |
| Shavano Falls Hydro | Shavano Falls Hydro LLC | Montrose, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 10.8 GWh | May 2015 | Oct 2025 | Water |
| Shavano Falls Hydro Drop 4 | Shavano Falls Hydro LLC - Drop 4 Project | Montrose, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 21.1 GWh | May 2015 | Oct 2025 | Water |
| Shaw Creek Solar, LLC | Shaw Creek Solar | Aiken, SC | Dominion Energy South Carolina, Inc. (SCEG) | 164.2 GWh | Sep 2019 | Aug 2026 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |