46305 1/4 90th St West, Lancaster, CA 93536Plant Summary Information
Summer Solar D2 is ranked #726 out of 917 solar farms in California in terms of total annual net electricity generation.
Summer Solar D2 generated 459.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Summer Solar D2 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Los Angeles County, CA |
| Initial Operation Date | July 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 2.0 GWh |
| Annual Consumption | 7.2 k MMBtu |
| Ranked #10,952 out of 13,301 Power Plants Nationwide | |
| Ranked #5,807 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,407 out of 1,641 California Power Plants | |
| Ranked #726 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Silverado Power (2013 to 2014) Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2025) |
Map of Summer Solar D2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Summer Solar D2.
Monthly Net Generation for Summer Solar D2
Monthly Plant Fuel Consumption for Summer Solar D2
Summer Solar D2 Details
| Summary Information | |
|---|---|
| Plant Name | Summer Solar D2 (58756) |
| Plant Address | 46305 1/4 90th St West, Lancaster, CA 93536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 34.72306, -118.28972 |
| Generation Dates on File | Jul 2014 to Dec 2025 |
| Initial Operation Date | July 2014 |
| Annual Generation | 2.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator SSD2 Details Operating July 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 193 |
| Tilt Angle | 25 |
| DC Net Capacity | 1.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Summer Solar D2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5797 | SolarClub 23 LLC | La Crescent, MN | 2.1 GWh |
| #5798 | IGS VGT | North Las Vegas, NV | 2.1 GWh |
| #5799 | TPE MD HO93 | Clarksville, MD | 2.1 GWh |
| #5800 | IMPA Winamac Solar Park | Winamac, IN | 2.1 GWh |
| #5801 | Pipestone City Solar LLC CSG | Pipestone, MN | 2.1 GWh |
| #5802 | Mt. Hope DPC Solar | Mt. Hope, WI | 2.1 GWh |
| #5803 | Elk Street Solar | Buffalo, NY | 2.1 GWh |
| #5804 | Sheldon Solar | Sheldon Springs, VT | 2.1 GWh |
| #5805 | FastSun 8 CSG | Courtland, MN | 2.1 GWh |
| #5806 | AC Power | Delanco Township, NJ | 2.1 GWh |
| #5808 | MN Buffalo Lake 212-1 LLC (CSG) | Buffalo Lake, MN | 2.0 GWh |
| #5809 | Dubois Solar (Hybrid) | Pine Bush, NY | 2.0 GWh |
| #5810 | USS Foley Solar LLC | Foley, MN | 2.0 GWh |
| #5811 | Plato CSG1, LLC | Glencoe, MN | 2.0 GWh |
| #5812 | SCH County - (2B) 4982 Rynex Corners Rd | Pattersonville, NY | 2.0 GWh |
| #5813 | USS Jayhawk Solar LLC (CSG) | Mankato, MN | 2.0 GWh |
| #5814 | E&B Resources | Bakersfield, CA | 2.0 GWh |
| #5815 | Medusa NY 1 | Medusa, NY | 2.0 GWh |
| #5816 | MN CSG 2019-16 LLC | Mankato, MN | 2.0 GWh |
| #5817 | Lily Garden | Waseca, MN | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Summer Solar D2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 3 | Lancaster, CA | 55.1 GWh | 1.3 mi |
| Antelope Expansion 1B | Lancaster, CA | 46.6 GWh | 1.8 mi |
| Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.0 GWh | 1.4 mi |
| Central Antelope Dry Ranch C | Lancaster, CA | 38.9 GWh | 0.6 mi |
| Elevation Solar C | Lancaster, CA | 105.0 GWh | 1 mi |
| Horn | Lancaster, CA | 3.7 GWh | 1.3 mi |
| Lancaster Dry Farm Ranch B | Lancaster, CA | 10.0 GWh | 0.4 mi |
| North Lancaster Ranch | Lancaster, CA | 38.6 GWh | 1.3 mi |
| Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh | 0.6 mi |
| Portal Ridge Solar C, LLC | Lancaster, CA | 28.6 GWh | 1.1 mi |
| Rodeo Solar C2 | Lancaster, CA | 3.6 GWh | 0.7 mi |
| Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 0.7 mi |
| San Pablo Raceway | Lancaster, CA | 192.5 GWh | 0.5 mi |
| Summer North Solar | Lancaster, CA | 13.1 GWh | 0 mi |
| Summer Solar A2 | Lancaster, CA | 2.7 GWh | 0 mi |
| Summer Solar B2 | Lancaster, CA | 3.1 GWh | 0 mi |
| Summer Solar C2 | Lancaster, CA | 3.3 GWh | 0 mi |
| Summer Solar LLC | Lancaster, CA | 55.9 GWh | 1.3 mi |
| TA-High Desert LLC | Lancaster, CA | 57.9 GWh | 1.3 mi |
| Western Antelope Blue Sky B | Lancaster, CA | 52.2 GWh | 1.5 mi |