Directory of Power Plants in Virginia
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Pleinmont Solar 2 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 435.7 GWh | Jul 2021 | Jul 2025 | Solar |
| Fountain Creek Solar | Dominion Energy Inc. | Skippers, VA | PJM Interconnection, LLC (PJM) | 82.0 GWh | Nov 2024 | Jul 2025 | Solar |
| Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 244.8 GWh | Aug 1958 | Jul 2025 | Natural Gas |
| Pleinmont Solar 1 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 137.0 GWh | Sep 2020 | Jul 2025 | Solar |
| Highlander Solar Energy Station 1 | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 291.6 GWh | Nov 2020 | Jul 2025 | Solar |
| Spring Grove I | Dominion Energy Inc. | Spring Grove, VA | PJM Interconnection, LLC (PJM) | 172.5 GWh | Oct 2020 | Jul 2025 | Solar |
| Colonial Trail West | Dominion Energy Inc. | Spring Grove, VA | PJM Interconnection, LLC (PJM) | 275.3 GWh | Nov 2019 | Jul 2025 | Solar |
| Skipjack Solar Center | AES Distributed Energy | Wayside, VA | PJM Interconnection, LLC (PJM) | 322.5 GWh | Apr 2022 | Jul 2025 | Solar |
| Chesterfield | Virginia Electric & Power Co | Chester, VA | PJM Interconnection, LLC (PJM) | 2.1 TWh | Nov 1952 | Jul 2025 | Natural Gas : 98.5% Distillate Fuel Oil : 1.5% |
| Martin Solar Center | Arevon Energy, Inc. | Kents Store, VA | PJM Interconnection, LLC (PJM) | 9.5 GWh | Nov 2017 | Jul 2025 | Solar |
| Palmer Solar Center | Arevon Energy, Inc. | Troy, VA | PJM Interconnection, LLC (PJM) | 9.9 GWh | Nov 2017 | Jul 2025 | Solar |
| Cavalier Solar A2 | AES Clean Energy | Smithfield, VA | PJM Interconnection, LLC (PJM) | 108.1 GWh | Nov 2024 | Jul 2025 | Solar |
| Possum Point | Virginia Electric & Power Co | Dumfries, VA | PJM Interconnection, LLC (PJM) | 2.5 TWh | May 1955 | Jul 2025 | Natural Gas : 99.7% |
| Surry | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 14.1 TWh | Nov 1972 | Jul 2025 | Nuclear |
| Cavalier Solar | AES Clean Energy | Smithfield, VA | PJM Interconnection, LLC (PJM) | 315.6 GWh | May 2024 | Jul 2025 | Solar |
| Southampton Solar, LLC | Dominion Renewable Energy | Newsoms, VA | PJM Interconnection, LLC (PJM) | 180.7 GWh | Oct 2017 | Jul 2025 | Solar |
| Essex Solar Center | Arevon Energy, Inc. | Dunnsville, VA | PJM Interconnection, LLC (PJM) | 37.9 GWh | Nov 2017 | Jul 2025 | Solar |
| Carvers Creek Solar | Carvers Creek, LLC | Gloucester, VA | PJM Interconnection, LLC (PJM) | 179.7 GWh | Jul 2024 | Jul 2025 | Solar |
| North Anna | Virginia Electric & Power Co | Mineral, VA | PJM Interconnection, LLC (PJM) | 16.1 TWh | May 1978 | Jul 2025 | Nuclear |
| Desper Solar | Dominion Renewable Energy | Louisa, VA | PJM Interconnection, LLC (PJM) | 122.8 GWh | Nov 2021 | Jul 2025 | Solar |
| Meherrin Solar | Dominion Renewable Energy | Skippers, VA | PJM Interconnection, LLC (PJM) | 117.5 GWh | Aug 2022 | Jul 2025 | Solar |
| Piney Creek Solar | Dominion Energy Inc. | Clover, VA | PJM Interconnection, LLC (PJM) | 149.2 GWh | Jul 2023 | Jul 2025 | Solar |
| Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 1.2 TWh | Sep 1995 | Jul 2025 | Bituminous Coal : 99.7% |
| Foxhound | Foxhound Solar, LLC | Clover, VA | PJM Interconnection, LLC (PJM) | 151.8 GWh | Mar 2024 | Jul 2025 | Solar |
| Grasshopper Solar | Dominion Energy Inc. | Chase City, VA | PJM Interconnection, LLC (PJM) | 124.8 GWh | Aug 2020 | Jul 2025 | Solar |
| Sadler Solar | Dominion Energy Inc. | Emporia, VA | PJM Interconnection, LLC (PJM) | 185.1 GWh | Jun 2021 | Jul 2025 | Solar |
| Bluestone Solar | Bluestone Farm Solar, LLC | Chase City, VA | PJM Interconnection, LLC (PJM) | 80.2 GWh | Apr 2021 | Jul 2025 | Solar |
| Whitehorn Solar | Whitehorn Solar, LLC | Gretna, VA | PJM Interconnection, LLC (PJM) | 71.7 GWh | Sep 2021 | Jul 2025 | Solar |
| Foxglove Solar | Urban Grid Solar | Middletown, VA | PJM Interconnection, LLC (PJM) | 99.3 GWh | Sep 2024 | Jul 2025 | Solar |
| Ladysmith | Virginia Electric & Power Co | Woodford, VA | PJM Interconnection, LLC (PJM) | 871.7 GWh | Apr 2001 | Jul 2025 | Natural Gas : 86.0% Distillate Fuel Oil : 14.0% |
| Crystal Hill Solar | Urban Grid Solar | Crystal Hill, VA | PJM Interconnection, LLC (PJM) | 133.1 GWh | Nov 2023 | Jul 2025 | Solar |
| Alton Post Office Solar | Urban Grid Solar | Alton, VA | PJM Interconnection, LLC (PJM) | 92.7 GWh | Nov 2024 | Jul 2025 | Solar |
| WestRock-West Point Mill | WestRock-West Point Mill | West Point, VA | PJM Interconnection, LLC (PJM) | 501.2 GWh | Dec 1953 | Jul 2025 | Black Liquor : 43.0% Natural Gas : 37.2% Wood/Wood Waste Solids : 15.9% Bituminous Coal : 2.6% Sludge Waste : 1.1% |
| Caden Energix Axton LLC | Caden Energix Axton LLC | Axton, VA | PJM Interconnection, LLC (PJM) | 124.4 GWh | Nov 2023 | Jul 2025 | Solar |
| Hopewell Cogeneration | Luminant Generation Company LLC | Hopewell, VA | PJM Interconnection, LLC (PJM) | 1.9 TWh | Dec 1989 | Jul 2025 | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
| Chesapeake Solar Project | Chesapeake Solar Project, LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 252.5 GWh | Nov 2023 | Jul 2025 | Solar |
| Madison Solar (VA) | AES Clean Energy | Locust Grove, VA | PJM Interconnection, LLC (PJM) | 96.8 GWh | Aug 2024 | Jul 2025 | Solar |
| Bookers Mill Solar | Dominion Energy Inc. | Farnham, VA | PJM Interconnection, LLC (PJM) | 147.4 GWh | Nov 2024 | Jul 2025 | Solar |
| Bartonsville Energy Facility, LLC | Bartonsville Energy Facility, LLC | Stephens, VA | PJM Interconnection, LLC (PJM) | 136.5 GWh | Nov 2024 | Jul 2025 | Solar |
| Caden Energix Hickory LLC | Caden Energix Hickory LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 58.6 GWh | Jul 2020 | Jul 2025 | Solar |
| Georgia-Pacific Big Island | GP Big Island LLC | Big Island, VA | PJM Interconnection, LLC (PJM) | 51.0 GWh | May 1920 | Jul 2025 | Natural Gas : 64.0% Wood/Wood Waste Solids : 24.7% Black Liquor : 8.3% Other Biomass Solids : 2.9% |
| Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | PJM Interconnection, LLC (PJM) | 629.7 GWh | Feb 1990 | Jul 2025 | Non-biogenic Municipal Solid Waste : 54.0% Biogenic Municipal Solid Waste : 44.1% Natural Gas : 1.9% |
| Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | PJM Interconnection, LLC (PJM) | 145.1 GWh | Sep 1987 | Jul 2025 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Hopewell Mill | RockTenn-Hopewell | Hopewell, VA | PJM Interconnection, LLC (PJM) | 286.0 GWh | Nov 1980 | Jul 2025 | Black Liquor : 44.5% Wood/Wood Waste Solids : 34.9% Natural Gas : 19.9% Bituminous Coal : 0.6% |
| Covington Facility | WestRock Corp | Covington, VA | PJM Interconnection, LLC (PJM) | 739.9 GWh | Dec 1950 | Jul 2025 | Black Liquor : 43.6% Natural Gas : 25.6% Wood/Wood Waste Solids : 17.0% Bituminous Coal : 13.4% |
| Doswell Energy Center | Doswell Ltd Partnership | Ashland, VA | PJM Interconnection, LLC (PJM) | 5.5 TWh | Oct 1991 | Jul 2025 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Celanese Acetate LLC | Celanese Acetate LLC | Narrows, VA | PJM Interconnection, LLC (PJM) | 164.2 GWh | Dec 1941 | Jul 2025 | Natural Gas |
| Water Strider Solar | Consolidated Edison Development Inc. | Nathalie, VA | PJM Interconnection, LLC (PJM) | 166.0 GWh | Feb 2021 | Jul 2025 | Solar |
| International Paper Franklin Mill | International Paper | Franklin, VA | PJM Interconnection, LLC (PJM) | 259.1 GWh | Oct 1977 | Jul 2025 | Black Liquor : 83.2% Natural Gas : 16.8% |
| Spruance Operating Services LLC | Veolia Energy Operating Service | Richmond, VA | PJM Interconnection, LLC (PJM) | 60.0 GWh | Apr 1992 | Jul 2025 | Natural Gas |
| Schoolfield Dam | Eagle Creek Renewable Energy, LLC | Danville, VA | PJM Interconnection, LLC (PJM) | 13.1 GWh | Sep 1990 | Jul 2025 | Water |
| Bedford Solar (Dominion) | Dominion Renewable Energy | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 121.9 GWh | Oct 2021 | Jul 2025 | Solar |
| Fort Powhatan Solar | Dominion Renewable Energy | Disputanta, VA | PJM Interconnection, LLC (PJM) | 311.7 GWh | Dec 2021 | Jul 2025 | Solar |
| Greensville County Solar Project, LLC | Dominion Energy Inc. | Skippers, VA | PJM Interconnection, LLC (PJM) | 139.1 GWh | Nov 2020 | Jul 2025 | Solar |
| Maplewood Solar | Dominion Renewable Energy | Climax, VA | PJM Interconnection, LLC (PJM) | 196.4 GWh | Nov 2022 | Jul 2025 | Solar |
| Commonwealth Chesapeake | Commonwealth Chesapeake Co LLC | New Church, VA | PJM Interconnection, LLC (PJM) | 39.0 GWh | Jul 2000 | Jul 2025 | Distillate Fuel Oil |
| Tenaska Virginia Generating Station | Tenaska Virginia Partners LP | Scottsville, VA | PJM Interconnection, LLC (PJM) | 5.2 TWh | Mar 2004 | Jul 2025 | Natural Gas : 99.7% |
| Warren County | Virginia Electric & Power Co | Front Royal, VA | PJM Interconnection, LLC (PJM) | 9.3 TWh | Nov 2014 | Jul 2025 | Natural Gas |
| Eastern Shore Solar, LLC | Dominion Renewable Energy | Oak Hall, VA | PJM Interconnection, LLC (PJM) | 152.6 GWh | Sep 2016 | Jul 2025 | Solar |
| Greensville County Power Station | Virginia Electric & Power Co | Emporia, VA | PJM Interconnection, LLC (PJM) | 11.2 TWh | Nov 2018 | Jul 2025 | Natural Gas |
| Sunnybrook Solar Project - Hybrid | Sunnybrook Farm Solar, LLC | Scottsburg, VA | PJM Interconnection, LLC (PJM) | 87.7 GWh | Nov 2022 | Jul 2025 | Solar |
| Powells Creek Solar - Hybrid | Powells Creek Farm Solar, LLC | Alton, VA | PJM Interconnection, LLC (PJM) | 156.5 GWh | Jul 2023 | Jul 2025 | Solar |
| Salem Water Plant | City of Salem - (VA) | Salem, VA | PJM Interconnection, LLC (PJM) | 131.0 MWh | Jul 2003 | Jul 2025 | Distillate Fuel Oil |
| Salem Street Dept | City of Salem - (VA) | Salem, VA | PJM Interconnection, LLC (PJM) | 130.0 MWh | Jun 2005 | Jul 2025 | Distillate Fuel Oil |
| Waverly Solar, LLC | Waverly Solar, LLC | Waverly, VA | PJM Interconnection, LLC (PJM) | 211.8 GWh | Nov 2023 | Jul 2025 | Solar |
| HP Hood CT | HP Hood LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 106.9 GWh | May 2015 | Jul 2025 | Natural Gas |
| Caden Energix Endless Caverns, LLC | Caden Energix Endless Caverns, LLC | New Market, VA | PJM Interconnection, LLC (PJM) | 53.4 GWh | Nov 2023 | Jul 2025 | Solar |
| Coastal Virginia Offshore Wind (CVOW) Pi | Virginia Electric & Power Co | Virginia Beach, VA | PJM Interconnection, LLC (PJM) | 48.9 GWh | Dec 2020 | Jul 2025 | Wind |
| Otter Creek Solar | Dominion Energy Inc. | Chase City, VA | PJM Interconnection, LLC (PJM) | 130.3 GWh | Sep 2023 | Jul 2025 | Solar |
| Wythe County Solar | Consolidated Edison Development Inc. | Wythe County, VA | PJM Interconnection, LLC (PJM) | 66.9 GWh | - | Jul 2025 | Solar |
| Mechanicsville Solar | Mechanicsville Solar, LLC | Mechanicsville, VA | PJM Interconnection, LLC (PJM) | 48.1 GWh | Aug 2020 | Jul 2025 | Solar |
| Sycamore Solar | Dominion Energy Inc. | Gretna, VA | PJM Interconnection, LLC (PJM) | 85.2 GWh | Feb 2023 | Jul 2025 | Solar |
| Potomac Energy Center, LLC | Potomac Energy Center LLC | Leesburg, VA | PJM Interconnection, LLC (PJM) | 4.8 TWh | Mar 2017 | Jul 2025 | Natural Gas |
| Virginia Tech Power Plant | Virginia Polytechnic Inst and State Unv | Blacksburg, VA | PJM Interconnection, LLC (PJM) | 17.5 GWh | Feb 1976 | Jul 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Bear Garden | Virginia Electric & Power Co | New Canton, VA | PJM Interconnection, LLC (PJM) | 3.2 TWh | Apr 2011 | Jul 2025 | Natural Gas |
| Virginia City Hybrid Energy Center | Virginia Electric & Power Co | St. Paul, VA | PJM Interconnection, LLC (PJM) | 1.5 TWh | Jun 2012 | Jul 2025 | Bituminous Coal : 91.1% Wood/Wood Waste Solids : 8.8% |
| Brunswick County Power Station | Virginia Electric & Power Co | Freeman, VA | PJM Interconnection, LLC (PJM) | 10.0 TWh | Mar 2016 | Jul 2025 | Natural Gas |
| Waste Management King George LFGTE | WM Renewable Energy LLC | King George, VA | PJM Interconnection, LLC (PJM) | 77.3 GWh | Apr 2010 | Jul 2025 | Landfill Gas |
| Altavista Solar | Altavista Solar, LLC | Lynch Station, VA | PJM Interconnection, LLC (PJM) | 159.7 GWh | May 2021 | Jul 2025 | Solar |
| Molson Coors Shenandoah Brewery | Molson Coors Shenandoah Brewery | Elkton, VA | PJM Interconnection, LLC (PJM) | 7.5 GWh | May 2012 | Jul 2025 | Other Biomass Gas |
| Martinsville LFG Generator | City of Martinsville - (VA) | Martinsville, VA | PJM Interconnection, LLC (PJM) | 277.0 MWh | Feb 2012 | Jul 2025 | Natural Gas |
| Western Branch High School | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 921.0 MWh | Mar 2016 | Apr 2025 | Solar |
| Springfield Solar | Dominion Renewable Energy | Montross, VA | PJM Interconnection, LLC (PJM) | 2.1 GWh | Jun 2024 | Dec 2024 | Solar |
| Puller Solar | Dominion Energy Inc. | Topping, VA | PJM Interconnection, LLC (PJM) | 26.1 GWh | Sep 2018 | Dec 2024 | Solar |
| IKEA Norfolk Rooftop PV System | IKEA Property Inc | Norfolk, VA | PJM Interconnection, LLC (PJM) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
| Rappahannock Solar, LLC | Rappahannock Solar, LLC | White Stone, VA | PJM Interconnection, LLC (PJM) | 2.9 GWh | Oct 2021 | Dec 2024 | Solar |
| NASA Wallops Flight Facility Solar | Ameresco Federal Solutions | Wallops Island, VA | PJM Interconnection, LLC (PJM) | 5.8 GWh | Feb 2020 | Dec 2024 | Solar |
| Gloucester Solar | Dominion Energy Inc. | Gloucester, VA | PJM Interconnection, LLC (PJM) | 37.9 GWh | Mar 2019 | Dec 2024 | Solar |
| Twittys Creek Solar, LLC | Cardinal Renewables | Keysville, VA | PJM Interconnection, LLC (PJM) | 24.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Caden Energix Pamplin LLC | Caden Energix Pamplin LLC | Appomattox, VA | PJM Interconnection, LLC (PJM) | 31.2 GWh | Jun 2020 | Dec 2024 | Solar |
| Caden Energix Rives Road LLC | Caden Energix Rives Road LLC | Petersburg, VA | PJM Interconnection, LLC (PJM) | 29.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Orange Street G1 | Town of Bedford - (VA) | Bedford, VA | PJM Interconnection, LLC (PJM) | 168.0 MWh | Jun 2005 | Dec 2024 | Distillate Fuel Oil |
| Westmoreland County Solar Project | Westmoreland County Solar Project, LLC | WARSAW, VA | PJM Interconnection, LLC (PJM) | 44.4 GWh | Sep 2021 | Dec 2024 | Solar |
| TWE Myrtle Solar Farm, LLC | Dominion Energy Inc. | Suffolk, VA | PJM Interconnection, LLC (PJM) | 24.7 GWh | May 2020 | Dec 2024 | Solar |
| Danville Farm, LLC | Thor Solar 1 CEI, LLC | Ringgold, VA | PJM Interconnection, LLC (PJM) | 20.0 GWh | Oct 2020 | Dec 2024 | Solar |
| Energix Hollyfield, LLC | Energix Hollyfield, LLC | Manquin, VA | PJM Interconnection, LLC (PJM) | 26.8 GWh | Jun 2021 | Dec 2024 | Solar |
| Cunningham Solar LLC | Arevon Energy, Inc. | Palmyra, VA | PJM Interconnection, LLC (PJM) | 8.2 GWh | Apr 2023 | Dec 2024 | Solar |
| Prince Edward CSG LLC | Dimension Energy LLC | Pamplin, VA | PJM Interconnection, LLC (PJM) | 7.3 GWh | Jan 2024 | Dec 2024 | Solar |
| Amherst Solar Facility (VA) | Appalachian Power Co | Amherst, VA | PJM Interconnection, LLC (PJM) | 9.4 GWh | Sep 2023 | Dec 2024 | Solar |
| White Stone Ocran Solar LLC Community So | Dimension Energy LLC | White Stone, VA | PJM Interconnection, LLC (PJM) | 9.4 GWh | Jan 2024 | Dec 2024 | Solar |