Waverly Solar, LLC
29656 Sussex Drive, Waverly, VA 23890Plant Summary Information
Waverly Solar, LLC is ranked #17 out of 93 solar farms in Virginia in terms of total annual net electricity generation.
Waverly Solar, LLC generated 67.2 GWh during the 3-month period between April 2024 to July 2024.
Plant Name | Waverly Solar, LLC |
---|---|
Utility Name | Waverly Solar, LLC |
Location | Sussex County, VA |
Initial Operation Date | December 2023 |
Last Update | Jul 2024 |
Annual Generation | 116.7 GWh |
Annual Consumption | 398.1 k MMBtu |
Ranked #2,972 out of 11,825 Power Plants Nationwide | |
Ranked #506 out of 5,634 Solar Power Plants Nationwide | |
Ranked #53 out of 210 Virginia Power Plants | |
Ranked #17 out of 93 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Waverly Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waverly Solar, LLC.
Monthly Net Generation for Waverly Solar, LLC
Waverly Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Waverly Solar, LLC (65225) |
Plant Address | 29656 Sussex Drive, Waverly, VA 23890 |
Utility | Waverly Solar, LLC (64547) |
Latitude, Longitude | 37.02078, -77.12265 |
Generation Dates on File | Jan 2024 to Jul 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 116.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | QF21-1076 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 115.00 kV / 34.50 kV |
Energy Storage | No |
Generator ENX17 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 118 MW |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 149.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Waverly Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#496 | Bonnybrooke PV | Florence, AZ | 118.7 GWh |
#497 | CPV Maple Hill Solar | Portage, PA | 118.6 GWh |
#498 | Fort Drum Energy Center | Vero Beach, FL | 118.3 GWh |
#499 | FPL Flowers Creek Solar Energy Center | Altha, FL | 118.3 GWh |
#500 | Hooper Solar | Mosca, CO | 118.3 GWh |
#501 | Techren Solar V | Boulder, NV | 117.8 GWh |
#502 | RE Camelot LLC | Mojave, CA | 117.6 GWh |
#503 | Rocket Solar, LLC | Corinne, UT | 117.6 GWh |
#504 | Sweetbay Solar Center | North of Indiantown, FL | 117.5 GWh |
#505 | Little Bear 5 | Mendota, CA | 117.0 GWh |
#507 | Springfield Solar (WI) | Lomira, WI | 116.2 GWh |
#508 | TS Power Plant | Battle Mountain, NV | 1.3 TWh |
#509 | First City Solar Energy Center | McDavid, FL | 115.8 GWh |
#510 | Mesquite Solar 5, LLC | Tonopah, AZ | 106.7 GWh |
#511 | Macho Springs | Deming, NM | 115.5 GWh |
#512 | OE_GA3 | Camilla, GA | 115.4 GWh |
#513 | Moffett Solar Project | Ridgeland, SC | 115.2 GWh |
#514 | Crooked Lake Solar, LLC | Blytheville, AR | 115.2 GWh |
#515 | Appaloosa Solar I | Cedar City, UT | 115.0 GWh |
#516 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 114.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waverly Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boydton Plank Road Cogen Plant Hybrid | Petersburg, VA | 66.0 MWh | 22.4 mi |
Brasfield | Petersburg, VA | 6.8 GWh | 26.1 mi |
Caden Energix Rives Road LLC | Petersburg, VA | 28.0 GWh | 16.1 mi |
Cavalier Solar | Smithfield, VA | 63.0 GWh | 21.3 mi |
Colonial Trail West | Spring Grove, VA | 277.9 GWh | 14.6 mi |
Downtown | Franklin, VA | 232.0 MWh | 26 mi |
Fort Powhatan Solar | Disputanta, VA | 317.7 GWh | 16.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 25.6 mi |
Hopewell Cogeneration | Hopewell, VA | 1.5 TWh | 20.7 mi |
Hopewell Mill | Hopewell, VA | 284.8 GWh | 20.6 mi |
Hopewell Power Station | Hopewell, VA | 345.0 GWh | 21.1 mi |
International Paper Franklin Mill | Franklin, VA | 247.5 GWh | 26.2 mi |
Nottoway Diesel Generating Facility | Courtland, VA | 525.0 MWh | 22.4 mi |
Park 500 Philip Morris USA | Chester, VA | 13.8 GWh | 23.6 mi |
Philip Morris | Chester, VA | 2.2 GWh | 24 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 24.5 mi |
Southampton Power Station | Franklin, VA | 340.0 GWh | 26.4 mi |
Spring Grove I | Spring Grove, VA | 148.4 GWh | 15.4 mi |
Surry | Surry, VA | 13.8 TWh | 25.4 mi |
Sussex Drive, LLC | Stoney Creek, VA | 38.2 GWh | 17.2 mi |