Waverly Solar, LLC
29656 Sussex Drive, Waverly, VA 23890Plant Summary Information
Waverly Solar, LLC is ranked #41 out of 243 power plants in Virginia in terms of total annual net electricity generation.
Waverly Solar, LLC generated 62.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Waverly Solar, LLC |
|---|---|
| Utility Name | Waverly Solar, LLC |
| Location | Sussex County, VA |
| Initial Operation Date | December 2023 |
| Last Update | May 2026 |
| Annual Generation | 208.4 GWh |
| Annual Consumption | 780.6 k MMBtu |
| Ranked #2,481 out of 13,081 Power Plants Nationwide | |
| Ranked #453 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #41 out of 243 Virginia Power Plants | |
| Ranked #10 out of 138 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Waverly Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Waverly Solar, LLC.
Monthly Net Generation for Waverly Solar, LLC
Monthly Plant Fuel Consumption for Waverly Solar, LLC
Waverly Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Waverly Solar, LLC (65225) |
| Plant Address | 29656 Sussex Drive, Waverly, VA 23890 |
| Utility | Waverly Solar, LLC (64547) |
| Latitude, Longitude | 37.02078, -77.12265 |
| Generation Dates on File | Jan 2024 to May 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 208.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | QF21-1076 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV / 34.50 kV |
| Energy Storage | No |
Generator ENX17 Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 118 MW |
| Summer Capacity | 118 MW |
| Winter Capacity | 118 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 149.2 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Waverly Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #443 | BPL Crown Solar LLC | Chilton, TX | 212.7 GWh |
| #444 | Rocket Solar, LLC | Corinne, UT | 212.7 GWh |
| #445 | Granite Mountain Solar East, LLC | Cedar City, UT | 212.5 GWh |
| #446 | Lockhart Solar PV II | Hinkley, CA | 207.7 GWh |
| #447 | Black Bear Solar 1 | Montgomery, AL | 212.1 GWh |
| #448 | Alamo 6 | Fort Stockton, TX | 211.6 GWh |
| #449 | Coniglio Solar | Wolfe City, TX | 211.1 GWh |
| #450 | Sigurd Solar LLC | Sigurd, UT | 210.4 GWh |
| #451 | Yuma Solar + Storage | Fortuna Foothills, AZ | 201.3 GWh |
| #452 | BPL Sol Solar LLC | Chilton, TX | 208.9 GWh |
| #454 | Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh |
| #455 | Amite Solar, LLC | Roseland, LA | 207.8 GWh |
| #456 | Crossett Solar | Crossett, AR | 207.0 GWh |
| #457 | Springfield Solar (WI) | Lomira, WI | 206.2 GWh |
| #458 | Edwards Sanborn 1C | Mojave, CA | 205.9 GWh |
| #459 | Walnut Bend Solar Station PV | Moro, AR | 205.5 GWh |
| #460 | Holliday Creek Solar | Fort Dodge, IA | 204.8 GWh |
| #461 | Ivanpah 3 | Nipton, CA | 211.3 GWh |
| #462 | Maplewood Solar | Climax, VA | 203.0 GWh |
| #463 | Solverde 1 | Lancaster, CA | 202.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Waverly Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Caden Energix Rives Road LLC | Petersburg, VA | 29.0 GWh | 16.1 mi |
| Cavalier Solar | Smithfield, VA | 292.9 GWh | 21.3 mi |
| Cavalier Solar A2 | Smithfield, VA | 162.6 GWh | 21.3 mi |
| Colonial Trail West | Spring Grove, VA | 302.7 GWh | 14.6 mi |
| Downtown | Franklin, VA | 132.0 MWh | 26 mi |
| Fort Powhatan Solar | Disputanta, VA | 306.9 GWh | 16.7 mi |
| Gravel Neck | Surry, VA | 120.0 GWh | 25.6 mi |
| HCE Reams Solar, LLC | Dinwiddie, VA | 9.1 GWh | 20.5 mi |
| Hopewell Cogeneration | Hopewell, VA | 1.9 TWh | 20.7 mi |
| Hopewell Mill | Hopewell, VA | 282.7 GWh | 20.6 mi |
| Hopewell Power Station | Hopewell, VA | 316.6 GWh | 21.1 mi |
| Nottoway Diesel Generating Facility | Courtland, VA | 953.0 MWh | 22.4 mi |
| Nuby Run Solar, LLC | Windsor, VA | 1.7 GWh | 25.6 mi |
| Park 500 Philip Morris USA | Chester, VA | 13.4 GWh | 23.6 mi |
| Sebera Solar | Prince George, VA | 22.9 GWh | 17.3 mi |
| Solidago Solar | Windsor, VA | 34.6 GWh | 24.5 mi |
| Spring Grove I | Spring Grove, VA | 196.3 GWh | 15.4 mi |
| Spring Grove Solar 2 | Spring Grove, VA | 107.8 GWh | 14.9 mi |
| Surry | Surry, VA | 12.2 TWh | 25.4 mi |
| Sussex Drive, LLC | Stoney Creek, VA | 39.2 GWh | 17.2 mi |