Meherrin Solar
1119 Pine Log Road, Skippers, VA 23879Plant Summary Information
Meherrin Solar is ranked #27 out of 122 solar farms in Virginia in terms of total annual net electricity generation.
Meherrin Solar generated 38.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Meherrin Solar |
|---|---|
| Utility Name | Dominion Renewable Energy |
| Location | Greensville County, VA |
| Initial Operation Date | September 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 124.3 GWh |
| Annual Consumption | 438.9 k MMBtu |
| Ranked #3,150 out of 12,539 Power Plants Nationwide | |
| Ranked #718 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #62 out of 233 Virginia Power Plants | |
| Ranked #27 out of 122 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Meherrin Solar LLC (2018 to 2019) Dominion Renewable Energy (2020 to 2024) |
Map of Meherrin Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Meherrin Solar.
Monthly Net Generation for Meherrin Solar
Meherrin Solar Details
| Summary Information | |
|---|---|
| Plant Name | Meherrin Solar (62758) |
| Plant Address | 1119 Pine Log Road, Skippers, VA 23879 |
| Utility | Dominion Renewable Energy (58468) |
| Latitude, Longitude | 36.59, -77.65 |
| Generation Dates on File | Jul 2022 to Sep 2025 |
| Initial Operation Date | September 2022 |
| Annual Generation | 124.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator MEHER Details Operating September 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 59.6 MW |
| Summer Capacity | 59.6 MW |
| Winter Capacity | 59.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 86.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Meherrin Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #708 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 125.4 GWh |
| #709 | Granite Mountain Solar West, LLC | Cedar City, UT | 125.1 GWh |
| #710 | Palmetto Plains | Bowman, SC | 125.1 GWh |
| #711 | RE Camelot LLC | Mojave, CA | 125.1 GWh |
| #712 | Jicarilla Solar 2 | Dulce, NM | 124.8 GWh |
| #713 | Hecate Energy Beacon Solar 3 | Cantil, CA | 124.8 GWh |
| #714 | Redlands | TBD, FL | 124.8 GWh |
| #715 | RE Gaskell West 2 LLC | Rosamond, CA | 124.7 GWh |
| #716 | Solar Star Oregon II | Prineville, OR | 124.6 GWh |
| #717 | BT Cooke Solar, LLC | Gainsville, TX | 124.4 GWh |
| #719 | Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 121.2 GWh |
| #720 | Caden Energix Axton LLC | Axton, VA | 124.0 GWh |
| #721 | Debary Solar Power Plant | DeBary, FL | 123.6 GWh |
| #722 | Grasshopper Solar | Chase City, VA | 123.5 GWh |
| #723 | Desper Solar | Louisa, VA | 123.4 GWh |
| #724 | Macho Springs | Deming, NM | 122.7 GWh |
| #725 | Laurel Oaks Solar | Plant City, FL | 122.4 GWh |
| #726 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #727 | Little Bear 5 | Mendota, CA | 121.7 GWh |
| #728 | Baldwin Solar BESS | Baldwin, IL | 121.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Meherrin Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cottonwood Solar, LLC | Garysburg, NC | 4.6 GWh | 6 mi |
| Emporia | Emporia, VA | 6.8 GWh | 8.9 mi |
| Floyd Road Solar Farm | Gaston, NC | 9.2 GWh | 6 mi |
| Fountain Creek Solar | Skippers, VA | 109.0 GWh | 1.1 mi |
| Garysburg Solar | Garysburg, NC | 7.0 GWh | 9 mi |
| Gaston | Roanoke Rapids, NC | 261.3 GWh | 10.9 mi |
| Gaston Solar | Gaston, NC | 9.1 GWh | 5.2 mi |
| Greensville County Power Station | Emporia, VA | 10.7 TWh | 8.9 mi |
| Greensville County Solar Project, LLC | Skippers, VA | 138.4 GWh | 5.6 mi |
| Gutenberg Solar | Garysburg, NC | 156.0 GWh | 9.6 mi |
| Halifax (NC) | Roanoke Rapids, NC | 24.2 GWh | 10.8 mi |
| Hemlock Solar | Garysburg, NC | 9.3 GWh | 8.8 mi |
| KapStone Kraft Paper Corp | Roanoke Rapids, NC | 179.4 GWh | 7.8 mi |
| Long Farm 46 Solar, LLC | Garysburg, NC | 8.2 GWh | 8.7 mi |
| Northern Cardinal Solar | Roanoke Rapids, NC | 3.0 GWh | 11.5 mi |
| Oak Solar | Gaston, NC | 259.8 GWh | 8.2 mi |
| Pleasant Hill PV1 | Pleasant Hill, NC | 22.9 GWh | 6.9 mi |
| Roanoke Rapids | Roanoke Rapids, NC | 271.7 GWh | 7.8 mi |
| Rosemary Power Station | Roanoke Rapids, NC | 15.5 GWh | 9.6 mi |
| Sadler Solar | Emporia, VA | 184.0 GWh | 8.4 mi |