Sycamore Solar
Gretna, Gretna, VA 24557Plant Summary Information
Sycamore Solar is ranked #29 out of 99 solar farms in Virginia in terms of total annual net electricity generation.
Sycamore Solar generated 18.3 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Sycamore Solar |
---|---|
Utility Name | Dominion Energy Inc. |
Location | Pittsylvania County, VA |
Initial Operation Date | March 2023 |
Last Update | Mar 2025 |
Annual Generation | 86.2 GWh |
Annual Consumption | 321.1 k MMBtu |
Ranked #3,410 out of 11,623 Power Plants Nationwide | |
Ranked #724 out of 5,666 Solar Power Plants Nationwide | |
Ranked #66 out of 210 Virginia Power Plants | |
Ranked #29 out of 99 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Dominion Energy Inc (2020 to 2021) Dominion Energy Inc. (2022 to 2023) |
Map of Sycamore Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sycamore Solar.
Monthly Net Generation for Sycamore Solar
Sycamore Solar Details
Summary Information | |
---|---|
Plant Name | Sycamore Solar (64136) |
Plant Address | Gretna, Gretna, VA 24557 |
Utility | Dominion Energy Inc. (5248) |
Latitude, Longitude | 36.94263, -79.1928 |
Generation Dates on File | Mar 2023 to Mar 2025 |
Initial Operation Date | March 2023 |
Annual Generation | 86.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator SYSO Details Operating March 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 42 MW |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
DC Net Capacity | 59.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sycamore Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#714 | Albany Solar (WI) | Broadhead, WI | 89.5 GWh |
#715 | Live Oak Solar, LLC | Metter, GA | 89.3 GWh |
#716 | Sonny Solar LLC | Elberton, GA | 89.1 GWh |
#717 | Peace Creek Solar | Bartow, FL | 89.0 GWh |
#718 | Vancourt Solar Interconnections | La Feria, TX | 88.6 GWh |
#719 | OCI Alamo Solar I Hybrid | San Antonio, TX | 88.3 GWh |
#720 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 87.8 GWh |
#721 | Sanford Solar | Sanford, ME | 87.6 GWh |
#722 | OE_AZ1 | Salome, AZ | 87.5 GWh |
#723 | Little Bear Solar 1, LLC | Mendota, CA | 87.2 GWh |
#725 | Citrus Ridge Solar | Bay Lake, FL | 86.2 GWh |
#726 | Edwards Sanborn S3 | Mojave, CA | 81.5 GWh |
#727 | Hazlehurst III | Hazlehurst, GA | 85.9 GWh |
#728 | Scarlet II Hybrid | Cantua Creek, CA | 80.8 GWh |
#729 | Carvers Creek Solar | Gloucester, VA | 85.0 GWh |
#730 | Black Mesa Solar, LLC | King Hill, ID | 84.9 GWh |
#731 | Jicarilla Solar 1 LLC | Dulce, NM | 81.5 GWh |
#732 | Broad River Solar, LLC | Mooresboro, NC | 83.7 GWh |
#733 | Hazlehurst II | Hazlehurst, GA | 83.3 GWh |
#734 | Grazing Yak Solar | Calhan, CO | 83.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sycamore Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altavista Power Station | Altavista, VA | 283.2 GWh | 13 mi |
Altavista Solar | Lynch Station, VA | 162.9 GWh | 16.6 mi |
Crystal Hill Solar | Crystal Hill, VA | 130.6 GWh | 15.8 mi |
Danville | Danville, VA | 13.1 GWh | 20.4 mi |
Danville Farm, LLC | Ringgold, VA | 19.7 GWh | 25 mi |
Danville Kentuck Road Plant | Ringgold, VA | 15.7 MWh | 20.3 mi |
Danville New Design Plant | Danville, VA | 14.7 MWh | 24.3 mi |
Depot Solar Center, LLC | Rustburg, VA | 29.0 GWh | 23.4 mi |
Halifax | Halifax, VA | 1.1 GWh | 18.6 mi |
Halifax County Biomass | South Boston, VA | 298.4 GWh | 24.3 mi |
Leesville | Hurt, VA | 46.7 GWh | 15.6 mi |
Maplewood Solar | Climax, VA | 196.5 GWh | 7.9 mi |
Monroe Solar | Chatham, VA | 4.6 GWh | 16.5 mi |
Piney Creek Solar | Clover, VA | 92.8 GWh | 24.8 mi |
Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 87.8 GWh | 21.9 mi |
TPE Irish Road Solar, LLC | Chatham, VA | 11.1 GWh | 22.9 mi |
TPE Whitmell Solar, LLC | Chatham, VA | 11.1 GWh | 22.9 mi |
Water Strider Solar | Nathalie, VA | 167.8 GWh | 10.5 mi |
Watlington Solar | Halifax, VA | 34.6 GWh | 24.8 mi |
Whitehorn Solar | Gretna, VA | 77.9 GWh | 9.2 mi |