Pleinmont Solar 2
TBD, Spotsylvania, VA 22551Plant Summary Information
Pleinmont Solar 2 is ranked #23 out of 234 power plants in Virginia in terms of total annual net electricity generation.
Pleinmont Solar 2 generated 66.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Pleinmont Solar 2 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Spotsylvania County, VA |
| Initial Operation Date | August 2021 |
| Last Update | Feb 2026 |
| Annual Generation | 436.6 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,506 out of 12,637 Power Plants Nationwide | |
| Ranked #146 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #23 out of 234 Virginia Power Plants | |
| Ranked #1 out of 123 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pleinmont Solar 2 LLC (2018 to 2019) AES Distributed Energy (2020 to 2024) |
Map of Pleinmont Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pleinmont Solar 2.
Monthly Net Generation for Pleinmont Solar 2
Monthly Plant Fuel Consumption for Pleinmont Solar 2
Pleinmont Solar 2 Details
| Summary Information | |
|---|---|
| Plant Name | Pleinmont Solar 2 (62013) |
| Plant Address | TBD, Spotsylvania, VA 22551 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 38.24712, -77.78622 |
| Generation Dates on File | Sep 2021 to Feb 2026 |
| Initial Operation Date | August 2021 |
| Annual Generation | 436.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator PLNM2 Details Operating August 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 240 MW |
| Summer Capacity | 240 MW |
| Winter Capacity | 240 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 294 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Pleinmont Solar 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #136 | Orion I Solar Project | Burlington, TX | 449.7 GWh |
| #137 | Blue Jay Solar I, LLC | Iola, TX | 442.0 GWh |
| #138 | Tres Bahias | Port Lavaca, TX | 446.6 GWh |
| #139 | Pike Solar Hybrid | Fountain, CO | 445.6 GWh |
| #140 | White Wing Solar | Yuma, AZ | 445.1 GWh |
| #141 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 444.9 GWh |
| #142 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #143 | Mesquite Solar 3, LLC | Tonopah, AZ | 441.5 GWh |
| #144 | Cutlass Solar II | Richmond, TX | 437.1 GWh |
| #145 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 432.6 GWh |
| #147 | Brazoria County Solar Project (Danciger) | Damon, TX | 435.0 GWh |
| #148 | AP Sunray LLC | Knippa, TX | 433.5 GWh |
| #149 | Long Lake Solar, LLC | West Helena, AR | 433.1 GWh |
| #150 | Greasewood Solar | Fort Stockton, TX | 432.9 GWh |
| #151 | Hickory Park Solar Hybrid | Camilla, GA | 428.3 GWh |
| #152 | Ray Ranch Solar | Pettus, TX | 430.2 GWh |
| #153 | Brazoria West | Damon, TX | 429.4 GWh |
| #154 | Big Cypress Solar, LLC | Crawfordsville, AR | 428.8 GWh |
| #155 | TS Power Plant | Battle Mountain, NV | 1.7 TWh |
| #156 | Muscle Shoals | Cherokee, AL | 425.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pleinmont Solar 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Stafford | Stafford, VA | 1.7 GWh | 22.3 mi |
| Apple Grove Solar, LLC | Mineral, VA | 30.1 GWh | 23 mi |
| Desper Solar | Louisa, VA | 127.9 GWh | 21.2 mi |
| Electric Avenue Facility | Culpeper, VA | 443.0 MWh | 10.9 mi |
| Energix Aditya, LLC | Mineral, VA | 20.4 GWh | 18.3 mi |
| Gordonsville Energy LP | Gordonsville, VA | 1.4 TWh | 24.2 mi |
| Highlander Solar Energy Station 1 | Spotsylvania, VA | 286.7 GWh | 0 mi |
| Ladysmith | Woodford, VA | 989.0 GWh | 19.1 mi |
| Louisa Generation Facility | Gordonsville, VA | 520.8 GWh | 24.9 mi |
| Madison Solar (VA) | Locust Grove, VA | 120.3 GWh | 4.1 mi |
| Marsh Run Generation Facility | Remington, VA | 390.8 GWh | 19.5 mi |
| Martin Solar Center | Kents Store, VA | 7.2 GWh | 29.1 mi |
| North Anna | Mineral, VA | 15.0 TWh | 12.9 mi |
| North Stafford HS | Stafford, VA | 412.0 MWh | 23.5 mi |
| Pleinmont Solar 1 | Spotsylvania, VA | 141.2 GWh | 0 mi |
| Remington | Remington, VA | 862.4 GWh | 20.5 mi |
| Remington Solar Facility | Remington, VA | 32.8 GWh | 20.8 mi |
| Richmond Spider Solar | Spotsylvania, VA | 37.3 GWh | 0 mi |
| Waste Management King George LFGTE | King George, VA | 77.1 GWh | 26 mi |
| Whitehouse Solar Farm | Louisa, VA | 34.3 GWh | 18.5 mi |