Cavalier Solar
10045 Mill Swamp Road, Smithfield, VA 23430Plant Summary Information
Cavalier Solar is ranked #29 out of 228 power plants in Virginia in terms of total annual net electricity generation.
Cavalier Solar generated 87.0 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Cavalier Solar |
---|---|
Utility Name | AES Clean Energy |
Location | Isle of Wight County, VA |
Initial Operation Date | June 2024 |
Last Update | May 2025 |
Annual Generation | 312.2 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,872 out of 12,312 Power Plants Nationwide | |
Ranked #196 out of 6,191 Solar Power Plants Nationwide | |
Ranked #29 out of 228 Virginia Power Plants | |
Ranked #4 out of 117 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Cavalier Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cavalier Solar.
Monthly Net Generation for Cavalier Solar
Cavalier Solar Details
Summary Information | |
---|---|
Plant Name | Cavalier Solar (67420) |
Plant Address | 10045 Mill Swamp Road, Smithfield, VA 23430 |
Utility | AES Clean Energy (64904) |
Latitude, Longitude | 37.018, -76.7358 |
Generation Dates on File | Jun 2024 to May 2025 |
Initial Operation Date | June 2024 |
Annual Generation | 312.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 23-102-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator CAVPV Details Operating June 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 155.6 MW |
Summer Capacity | 155.6 MW |
Winter Capacity | 155.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 197.87 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cavalier Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#186 | Golden Triangle II | St.Artesia, MS | 316.6 GWh |
#187 | Edwards Sanborn E4 | Mojave, CA | 311.0 GWh |
#188 | Lily Solar Hybrid | Scurry, TX | 316.2 GWh |
#189 | Dunns Bridge II Solar | San Pierre, IN | 314.2 GWh |
#190 | Quitman Solar | Quitman, GA | 317.5 GWh |
#191 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 293.4 GWh |
#192 | Drew Solar LLC | Calexico, CA | 316.5 GWh |
#193 | Impact Solar 1 | Deport, TX | 313.6 GWh |
#194 | Cove Mountain Solar 2 | Beryl, UT | 313.2 GWh |
#195 | Fort Powhatan Solar | Disputanta, VA | 313.2 GWh |
#197 | Rancho Seco Solar II, LLC | Twin Cities, CA | 310.8 GWh |
#198 | Elora Solar | Elora, TN | 310.5 GWh |
#199 | AP Sunray LLC | Knippa, TX | 309.2 GWh |
#200 | Brittlebush Solar | Coolidge, AZ | 308.9 GWh |
#201 | Porter Solar, LLC (TX) | Krum, TX | 307.2 GWh |
#202 | SR DeSoto I, LLC | DeSoto, GA | 306.8 GWh |
#203 | Quitman II Solar | Quitman, GA | 306.6 GWh |
#204 | Edwards Sanborn E2 | Mojave, CA | 292.0 GWh |
#205 | Storey Solar and Storage | Coolidge, AZ | 292.9 GWh |
#206 | Hornet Solar (TX) | Tulia, TX | 305.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cavalier Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cavalier Solar A2 | Smithfield, VA | 72.1 GWh | 0 mi |
Colonial Trail West | Spring Grove, VA | 272.8 GWh | 12.4 mi |
Downtown | Franklin, VA | 384.0 MWh | 25.5 mi |
Fort Powhatan Solar | Disputanta, VA | 313.2 GWh | 25.3 mi |
Gravel Neck | Surry, VA | 115.4 GWh | 9.9 mi |
International Paper Franklin Mill | Franklin, VA | 260.8 GWh | 25.3 mi |
Norge Solar Farm | Williamsburg, VA | 38.8 GWh | 24.1 mi |
Pleasant Hill Solar | Suffolk, VA | 40.2 GWh | 24.1 mi |
Rochambeau Solar | Williamsburg, VA | 37.6 GWh | 23 mi |
Solidago Solar | Windsor, VA | 38.3 GWh | 9 mi |
Spring Grove I | Spring Grove, VA | 165.7 GWh | 14.8 mi |
Stratford Solar Center, LLC | Suffolk, VA | 32.1 GWh | 26.5 mi |
Suffolk CSG, LLC | Suffolk, VA | 5.1 GWh | 23 mi |
Surry | Surry, VA | 14.0 TWh | 10.4 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 24.7 GWh | 16.2 mi |
Waste Management Bethel LFGTE | Hampton, VA | 36.5 GWh | 16.6 mi |
Waverly Solar, LLC | Waverly, VA | 213.2 GWh | 21.3 mi |
Western Branch High School | Chesapeake, VA | 921.0 MWh | 21.6 mi |
Winterberry Solar | Gloucester, VA | 41.1 GWh | 26.2 mi |
Woodland Solar Farm | Smithfield, VA | 32.2 GWh | 11.2 mi |