Cavalier Solar
10045 Mill Swamp Road, Smithfield, VA 23430Plant Summary Information
Cavalier Solar is ranked #26 out of 233 power plants in Virginia in terms of total annual net electricity generation.
Cavalier Solar generated 82.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Cavalier Solar |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Isle of Wight County, VA |
| Initial Operation Date | June 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 319.6 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,887 out of 12,539 Power Plants Nationwide | |
| Ranked #230 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #26 out of 233 Virginia Power Plants | |
| Ranked #2 out of 122 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Cavalier Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cavalier Solar.
Monthly Net Generation for Cavalier Solar
Cavalier Solar Details
| Summary Information | |
|---|---|
| Plant Name | Cavalier Solar (67420) |
| Plant Address | 10045 Mill Swamp Road, Smithfield, VA 23430 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 37.018, -76.7358 |
| Generation Dates on File | Jun 2024 to Sep 2025 |
| Initial Operation Date | June 2024 |
| Annual Generation | 319.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 23-102-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator CAVPV Details Operating June 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 155.6 MW |
| Summer Capacity | 155.6 MW |
| Winter Capacity | 155.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 197.87 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cavalier Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #220 | Markum Solar Farm | Valley Mills, TX | 332.8 GWh |
| #221 | Vikings Energy Farm | Holtville, CA | 310.4 GWh |
| #222 | South Cheyenne Solar | South Greeley, WY | 330.1 GWh |
| #223 | Golden Triangle II | St.Artesia, MS | 322.3 GWh |
| #224 | Sun Streams 2 | Hassayampa, AZ | 327.6 GWh |
| #225 | Washington County Solar | Sandersville, GA | 322.6 GWh |
| #226 | Big River Solar | Norris City, IL | 322.1 GWh |
| #227 | Edwards Sanborn E4 | Mojave, CA | 316.3 GWh |
| #228 | Umbriel Solar | Livington, TX | 321.1 GWh |
| #229 | Cove Mountain Solar 2 | Beryl, UT | 320.3 GWh |
| #231 | Elora Solar | Elora, TN | 318.4 GWh |
| #232 | Quitman Solar | Quitman, GA | 317.1 GWh |
| #233 | Quitman II Solar | Quitman, GA | 315.1 GWh |
| #234 | West Memphis Solar Station | Crawfordsville, AR | 314.9 GWh |
| #235 | Edwards Sanborn E2 | Mojave, CA | 299.6 GWh |
| #236 | Lily Solar Hybrid | Scurry, TX | 310.4 GWh |
| #237 | Storey Solar and Storage | Coolidge, AZ | 298.7 GWh |
| #238 | Fort Powhatan Solar | Disputanta, VA | 312.1 GWh |
| #239 | SR DeSoto I, LLC | DeSoto, GA | 311.4 GWh |
| #240 | Drew Solar LLC | Calexico, CA | 309.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cavalier Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cavalier Solar A2 | Smithfield, VA | 135.0 GWh | 0 mi |
| Colonial Trail West | Spring Grove, VA | 277.7 GWh | 12.4 mi |
| Downtown | Franklin, VA | 384.0 MWh | 25.5 mi |
| Fort Powhatan Solar | Disputanta, VA | 312.1 GWh | 25.3 mi |
| Gravel Neck | Surry, VA | 115.4 GWh | 9.9 mi |
| International Paper Franklin Mill | Franklin, VA | 259.8 GWh | 25.3 mi |
| Norge Solar Farm | Williamsburg, VA | 38.8 GWh | 24.1 mi |
| Pleasant Hill Solar | Suffolk, VA | 40.2 GWh | 24.1 mi |
| Rochambeau Solar | Williamsburg, VA | 37.6 GWh | 23 mi |
| Solidago Solar | Windsor, VA | 38.3 GWh | 9 mi |
| Spring Grove I | Spring Grove, VA | 178.8 GWh | 14.8 mi |
| Stratford Solar Center, LLC | Suffolk, VA | 32.1 GWh | 26.5 mi |
| Suffolk CSG, LLC | Suffolk, VA | 5.1 GWh | 23 mi |
| Surry | Surry, VA | 14.0 TWh | 10.4 mi |
| TWE Myrtle Solar Farm, LLC | Suffolk, VA | 24.7 GWh | 16.2 mi |
| Waste Management Bethel LFGTE | Hampton, VA | 36.5 GWh | 16.6 mi |
| Waverly Solar, LLC | Waverly, VA | 208.6 GWh | 21.3 mi |
| Western Branch High School | Chesapeake, VA | 921.0 MWh | 21.6 mi |
| Winterberry Solar | Gloucester, VA | 41.1 GWh | 26.2 mi |
| Woodland Solar Farm | Smithfield, VA | 32.2 GWh | 11.2 mi |