Mechanicsville Solar
3259 Mechancsville Turnpike, Mechanicsville, VA 23111Plant Summary Information
Mechanicsville Solar is ranked #42 out of 123 solar farms in Virginia in terms of total annual net electricity generation.
Mechanicsville Solar generated 10.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Mechanicsville Solar |
|---|---|
| Utility Name | Mechanicsville Solar, LLC |
| Location | Hanover County, VA |
| Initial Operation Date | September 2020 |
| Last Update | Feb 2026 |
| Annual Generation | 56.5 GWh |
| Annual Consumption | 204.1 k MMBtu |
| Ranked #4,012 out of 12,637 Power Plants Nationwide | |
| Ranked #1,000 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #83 out of 234 Virginia Power Plants | |
| Ranked #42 out of 123 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Mechanicsville Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mechanicsville Solar.
Monthly Net Generation for Mechanicsville Solar
Monthly Plant Fuel Consumption for Mechanicsville Solar
Mechanicsville Solar Details
| Summary Information | |
|---|---|
| Plant Name | Mechanicsville Solar (64158) |
| Plant Address | 3259 Mechancsville Turnpike, Mechanicsville, VA 23111 |
| Utility | Mechanicsville Solar, LLC (63777) |
| Latitude, Longitude | 37.66598, -77.20773 |
| Generation Dates on File | Sep 2020 to Feb 2026 |
| Initial Operation Date | September 2020 |
| Annual Generation | 56.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-934-004 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator MECH Details Operating September 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | OLDCHRCH 20 KV MECHVLSP |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | OLDCHRCH 20 KV MECHVLSP |
| Nameplate Capacity | 25 MW |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 35 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Mechanicsville Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #990 | Edwards Sanborn E3 | Mojave, CA | 56.6 GWh |
| #991 | EE Waianae Solar Project | Waianae, HI | 57.8 GWh |
| #992 | Sunray 2 | Daggett, CA | 57.7 GWh |
| #993 | Antelope DSR 3 | Lancaster, CA | 57.7 GWh |
| #994 | American Beech Solar LLC | Scotland Neck, NC | 57.2 GWh |
| #995 | Caprock Solar 1 LLC | San Jon, NM | 57.0 GWh |
| #996 | TA-High Desert LLC | Lancaster, CA | 56.8 GWh |
| #997 | Baxley | Baxley, GA | 56.8 GWh |
| #998 | Caden Energix Hickory LLC | Chesapeake, VA | 56.8 GWh |
| #999 | Oberon IB | Odessa, TX | 56.7 GWh |
| #1001 | Hazlehurst II | Hazlehurst, GA | 56.3 GWh |
| #1002 | Webberville Solar Project | Manor, TX | 56.3 GWh |
| #1003 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
| #1004 | Marine Corps Logistics Base Solar | Albany, GA | 55.7 GWh |
| #1005 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.6 GWh |
| #1006 | Apache Solar I | Cochise, AZ | 55.5 GWh |
| #1007 | SR McNeal | McNeal, AZ | 52.9 GWh |
| #1008 | Caden Energix Endless Caverns, LLC | New Market, VA | 54.7 GWh |
| #1009 | Swift Air Solar III | Odessa, TX | 54.6 GWh |
| #1010 | Dolores Canyon Solar | Cahone, CO | 54.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mechanicsville Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Briel Solar Farm | Standston, VA | 38.8 GWh | 10.3 mi |
| Charles City | Providence Forge, VA | 47.9 GWh | 16.3 mi |
| Chesterfield | Chester, VA | 2.1 TWh | 21.8 mi |
| Chesterfield Landfill Gas | Chester, VA | 35.0 MWh | 26.9 mi |
| Correctional Solar LLC | Barhamsville, VA | 29.0 GWh | 24 mi |
| Darbytown | Richmond, VA | 144.6 GWh | 14.6 mi |
| Doswell Energy Center | Ashland, VA | 5.5 TWh | 16.9 mi |
| Energix Hollyfield, LLC | Manquin, VA | 26.8 GWh | 2.1 mi |
| Essex Solar Center | Dunnsville, VA | 39.3 GWh | 25.1 mi |
| Henrico | Glen Allen, VA | 5.2 GWh | 19.7 mi |
| Hollyfield | Manquin, VA | 24.9 GWh | 2.1 mi |
| Hopewell Cogeneration | Hopewell, VA | 1.8 TWh | 26.2 mi |
| Hopewell Mill | Hopewell, VA | 276.5 GWh | 26.2 mi |
| Hopewell Power Station | Hopewell, VA | 311.2 GWh | 25.8 mi |
| King & Queen | Little Plymouth, VA | 59.9 GWh | 24.5 mi |
| Park 500 Philip Morris USA | Chester, VA | 12.0 GWh | 22.9 mi |
| Richmond Energy | Henrico, VA | 33.4 GWh | 14.3 mi |
| Skipjack Solar Center | Wayside, VA | 294.5 GWh | 16 mi |
| Spruance Operating Services LLC | Richmond, VA | 65.7 GWh | 19 mi |
| WestRock-West Point Mill | West Point, VA | 550.4 GWh | 23.7 mi |