Mechanicsville Solar
3259 Mechancsville Turnpike, Mechanicsville, VA 23111Plant Summary Information
Mechanicsville Solar is ranked #35 out of 116 solar farms in Virginia in terms of total annual net electricity generation.
Mechanicsville Solar generated 11.6 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Mechanicsville Solar |
---|---|
Utility Name | Mechanicsville Solar, LLC |
Location | Hanover County, VA |
Initial Operation Date | September 2020 |
Last Update | Mar 2025 |
Annual Generation | 52.9 GWh |
Annual Consumption | 197.2 k MMBtu |
Ranked #3,906 out of 12,288 Power Plants Nationwide | |
Ranked #852 out of 6,174 Solar Power Plants Nationwide | |
Ranked #77 out of 227 Virginia Power Plants | |
Ranked #35 out of 116 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Mechanicsville Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mechanicsville Solar.
Monthly Net Generation for Mechanicsville Solar
Mechanicsville Solar Details
Summary Information | |
---|---|
Plant Name | Mechanicsville Solar (64158) |
Plant Address | 3259 Mechancsville Turnpike, Mechanicsville, VA 23111 |
Utility | Mechanicsville Solar, LLC (63777) |
Latitude, Longitude | 37.66598, -77.20773 |
Generation Dates on File | Sep 2020 to Mar 2025 |
Initial Operation Date | September 2020 |
Annual Generation | 52.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-934-004 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator MECH Details Operating September 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | OLDCHRCH 20 KV MECHVLSP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | OLDCHRCH 20 KV MECHVLSP |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 35 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mechanicsville Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#842 | Mountain View Solar | North Las Vegas, NV | 55.2 GWh |
#843 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
#844 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
#845 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
#846 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
#847 | Eldorado Solar I | Eldorado, IL | 53.4 GWh |
#848 | Caden Energix Endless Caverns, LLC | New Market, VA | 53.3 GWh |
#849 | Edwards Sanborn E3 | Mojave, CA | 51.7 GWh |
#850 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
#851 | Marine Corps Logistics Base Solar | Albany, GA | 53.2 GWh |
#853 | Fort Benning Solar Facility | Fort Mitchell, AL | 52.9 GWh |
#854 | DWW Solar ll | Simsbury, CT | 52.8 GWh |
#855 | Catalina Solar 2, LLC | Rosamond, CA | 52.8 GWh |
#856 | Storey Bend Solar | Saint Cloud, FL | 52.8 GWh |
#857 | Gaskell West 1 Solar Facility | Lancaster, CA | 52.6 GWh |
#858 | East Nash PV2 | Spring Hope, NC | 52.5 GWh |
#859 | Norton Creek | TBD, FL | 52.4 GWh |
#860 | Mitchell Creek | TBD, FL | 52.3 GWh |
#861 | SR Ailey | Ailey, GA | 52.3 GWh |
#862 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mechanicsville Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Briel Solar Farm | Standston, VA | 41.8 GWh | 10.3 mi |
Charles City | Providence Forge, VA | 47.9 GWh | 16.3 mi |
Chesterfield | Chester, VA | 2.0 TWh | 21.8 mi |
Chesterfield Landfill Gas | Chester, VA | 24.3 GWh | 26.9 mi |
Correctional Solar LLC | Barhamsville, VA | 29.0 GWh | 24 mi |
Darbytown | Richmond, VA | 144.6 GWh | 14.6 mi |
Doswell Energy Center | Ashland, VA | 5.5 TWh | 16.9 mi |
Energix Hollyfield, LLC | Manquin, VA | 26.8 GWh | 2.1 mi |
Essex Solar Center | Dunnsville, VA | 36.8 GWh | 25.1 mi |
Henrico | Glen Allen, VA | 5.2 GWh | 19.7 mi |
Hollyfield | Manquin, VA | 24.9 GWh | 2.1 mi |
Hopewell Cogeneration | Hopewell, VA | 2.1 TWh | 26.2 mi |
Hopewell Mill | Hopewell, VA | 280.9 GWh | 26.2 mi |
Hopewell Power Station | Hopewell, VA | 311.2 GWh | 25.8 mi |
King & Queen | Little Plymouth, VA | 59.9 GWh | 24.5 mi |
Park 500 Philip Morris USA | Chester, VA | 12.0 GWh | 22.9 mi |
Richmond Energy | Henrico, VA | 33.4 GWh | 14.3 mi |
Skipjack Solar Center | Wayside, VA | 334.4 GWh | 16 mi |
Spruance Operating Services LLC | Richmond, VA | 59.1 GWh | 19 mi |
WestRock-West Point Mill | West Point, VA | 505.2 GWh | 23.7 mi |