Doswell Energy Center
10098 Old Ridge Road, Ashland, VA 23005Plant Summary Information
Doswell Energy Center is ranked #6 out of 233 power plants in Virginia in terms of total annual net electricity generation.
Doswell Energy Center is comprised of 9 generators and generated 1.7 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Doswell Energy Center |
|---|---|
| Utility Name | Doswell Ltd Partnership |
| Location | Hanover County, VA |
| Initial Operation Date | November 1991 |
| Last Update | Sep 2025 |
| Annual Generation | 5.6 TWh |
| Annual Consumption | 54.8 M MMBtu |
| Ranked #190 out of 12,539 Power Plants Nationwide | |
| Ranked #84 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #6 out of 233 Virginia Power Plants | |
| Ranked #4 out of 36 Virginia Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
Map of Doswell Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Doswell Energy Center.
Monthly Net Generation for Doswell Energy Center
Doswell Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Doswell Energy Center (52019) |
| Plant Address | 10098 Old Ridge Road, Ashland, VA 23005 |
| Utility | Doswell Ltd Partnership (5310) |
| Latitude, Longitude | 37.82081, -77.44625 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | November 1991 |
| Annual Generation | 5.6 TWh |
| Fuel Types | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 93-2-000; '01-10-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 230.00 kV / 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | VIRGINIA NAT GAS INC |
| Natural Gas Storage | No |
Generator GEN1 Details Operating November 1991
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | UNT5 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 71856749 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856749 |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 112.5 MW |
| Winter Capacity | 122 MW |
| Minimum Load | 73.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 1991 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 112.5 MW |
| Net Winter Capacity With Natural Gas | 122 MW |
| Net Summer Capacity With Oil | 112.5 MW |
| Net Winter Capacity With Oil | 122 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GEN2 Details Operating December 1991
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | UNT5 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 71856749 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856749 |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 112.5 MW |
| Winter Capacity | 122 MW |
| Minimum Load | 73.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1991 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 112.5 MW |
| Net Winter Capacity With Natural Gas | 122 MW |
| Net Summer Capacity With Oil | 112.5 MW |
| Net Winter Capacity With Oil | 122 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GEN3 Details Operating December 1991
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | UNT5 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | 71856749 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856749 |
| Nameplate Capacity | 132 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 123 MW |
| Winter Capacity | 132 MW |
| Minimum Load | 28.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1991 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating January 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | UNT6 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 71856755 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856755 |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 112.5 MW |
| Winter Capacity | 122 MW |
| Minimum Load | 73.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 112.5 MW |
| Net Winter Capacity With Natural Gas | 122 MW |
| Net Summer Capacity With Oil | 112.5 MW |
| Net Winter Capacity With Oil | 122 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GEN5 Details Operating January 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | UNT6 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 71856755 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856755 |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 112.5 MW |
| Winter Capacity | 122 MW |
| Minimum Load | 73.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 112.5 MW |
| Net Winter Capacity With Natural Gas | 122 MW |
| Net Summer Capacity With Oil | 112.5 MW |
| Net Winter Capacity With Oil | 122 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GEN6 Details Operating January 1992
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | UNT6 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | 71856755 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856755 |
| Nameplate Capacity | 132 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 123 MW |
| Winter Capacity | 132 MW |
| Minimum Load | 28.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1992 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating March 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 71856761 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 71856761 |
| Nameplate Capacity | 187 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 170 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 74.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 151 MW |
| Net Winter Capacity With Natural Gas | 188 MW |
| Net Summer Capacity With Oil | 170 MW |
| Net Winter Capacity With Oil | 188 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator GEN8 Details Operating March 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1379268472 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 1379268472 |
| Nameplate Capacity | 187 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 161.5 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN9 Details Operating April 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1379268471 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 1379268471 |
| Nameplate Capacity | 187 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 161.5 MW |
| Winter Capacity | 188 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Doswell Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #74 | Lake Road Generating Plant | Dayville, CT | 5.8 TWh |
| #75 | W S Lee | Williamston, SC | 5.8 TWh |
| #76 | Wolf Hollow II | Granbury, TX | 5.8 TWh |
| #77 | Santan | Gilbert, AZ | 5.8 TWh |
| #78 | Guadalupe Generating Station | Marion, TX | 5.7 TWh |
| #79 | St. Charles Power Station (LA) | La Place, LA | 5.7 TWh |
| #80 | Channelview Cogeneration Plant | Channelview, TX | 5.6 TWh |
| #81 | Kiamichi Energy Facility | Kiowa, OK | 5.6 TWh |
| #82 | Linden Cogen Plant | Linden, NJ | 5.7 TWh |
| #83 | Eagle Valley (IN) | Martinsville, IN | 5.5 TWh |
| #85 | Polk | Mulberry, FL | 5.5 TWh |
| #86 | Caledonia | Steens, MS | 5.5 TWh |
| #87 | Kendall County Generation Facility | Minooka, IL | 5.4 TWh |
| #88 | St Joseph Energy Center | New Carlisle, IN | 5.4 TWh |
| #89 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.5 TWh |
| #90 | Carroll County Energy | Carrollton, OH | 5.3 TWh |
| #91 | Batesville Generation Facility | Batesville, MS | 5.3 TWh |
| #92 | Cottonwood Energy Company LP | Deweyville, TX | 5.3 TWh |
| #93 | Hamilton Liberty | Towanda, PA | 5.2 TWh |
| #94 | Hays Energy Project | San Marcos, TX | 5.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Doswell Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apple Grove Solar, LLC | Mineral, VA | 30.1 GWh | 23.7 mi |
| Briel Solar Farm | Standston, VA | 38.8 GWh | 22.8 mi |
| Charles City | Providence Forge, VA | 47.9 GWh | 31.6 mi |
| Chesterfield | Chester, VA | 2.1 TWh | 30.5 mi |
| Chesterfield Landfill Gas | Chester, VA | 35.0 MWh | 32.5 mi |
| Darbytown | Richmond, VA | 144.6 GWh | 22.7 mi |
| Electric Avenue Facility | Culpeper, VA | 443.0 MWh | 32.7 mi |
| Energix Aditya, LLC | Mineral, VA | 20.4 GWh | 30.8 mi |
| Energix Hollyfield, LLC | Manquin, VA | 26.8 GWh | 18.3 mi |
| Henrico | Glen Allen, VA | 5.2 GWh | 11.8 mi |
| Hollyfield | Manquin, VA | 24.9 GWh | 18.2 mi |
| Ladysmith | Woodford, VA | 901.2 GWh | 17.7 mi |
| Martin Solar Center | Kents Store, VA | 9.2 GWh | 33.2 mi |
| Mechanicsville Solar | Mechanicsville, VA | 55.5 GWh | 16.9 mi |
| North Anna | Mineral, VA | 15.5 TWh | 25 mi |
| Richmond Energy | Henrico, VA | 33.4 GWh | 22.1 mi |
| Skipjack Solar Center | Wayside, VA | 307.8 GWh | 30.8 mi |
| Spruance Operating Services LLC | Richmond, VA | 61.9 GWh | 25.2 mi |
| Waste Management King George LFGTE | King George, VA | 79.6 GWh | 32.2 mi |
| Whitehouse Solar Farm | Louisa, VA | 34.3 GWh | 31.9 mi |