Chesapeake Solar Project
1400 Shillelagh Road, Chesapeake, VA 23323Plant Summary Information
Chesapeake Solar Project is ranked #35 out of 210 power plants in Virginia in terms of total annual net electricity generation.
Chesapeake Solar Project generated 52.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Chesapeake Solar Project |
---|---|
Utility Name | Chesapeake Solar Project, LLC |
Location | Chesapeake city, VA |
Initial Operation Date | December 2023 |
Last Update | Mar 2025 |
Annual Generation | 237.2 GWh |
Annual Consumption | 843.5 k MMBtu |
Ranked #2,149 out of 11,623 Power Plants Nationwide | |
Ranked #259 out of 5,666 Solar Power Plants Nationwide | |
Ranked #35 out of 210 Virginia Power Plants | |
Ranked #7 out of 99 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Chesapeake Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Chesapeake Solar Project.
Monthly Net Generation for Chesapeake Solar Project
Chesapeake Solar Project Details
Summary Information | |
---|---|
Plant Name | Chesapeake Solar Project (66541) |
Plant Address | 1400 Shillelagh Road, Chesapeake, VA 23323 |
Utility | Chesapeake Solar Project, LLC (65507) |
Latitude, Longitude | 36.6851, -76.29661 |
Generation Dates on File | Dec 2023 to Mar 2025 |
Initial Operation Date | December 2023 |
Annual Generation | 237.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator CHSP Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 132 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 153.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Chesapeake Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#249 | Alamo 6 | Fort Stockton, TX | 243.6 GWh |
#250 | Elara Solar | Pearsall, TX | 243.2 GWh |
#251 | SR Snipesville II | Denton, GA | 242.6 GWh |
#252 | West of the Pecos Solar | TBD, TX | 242.0 GWh |
#253 | East Pecos Solar | McCamey, TX | 241.5 GWh |
#254 | Maverick Solar 4, LLC | Desert Center, CA | 240.9 GWh |
#255 | SR Snipesville III | Denton, GA | 240.5 GWh |
#256 | Willow Spring Solar, LLC | Rosamond, CA | 239.4 GWh |
#257 | Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh |
#258 | Desert Quartzite | Blythe, CA | 231.9 GWh |
#260 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#261 | CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh |
#262 | Prairie State Solar Project | Swanwick Township, IL | 233.2 GWh |
#263 | Comanche Solar | Pueblo, CO | 233.1 GWh |
#264 | Three Peaks Power | Cedar City, UT | 231.6 GWh |
#265 | SR Lumpkin | Lumpkin, GA | 230.0 GWh |
#266 | Assembly Solar II LLC | Lennon, MI | 229.9 GWh |
#267 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
#268 | Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh |
#269 | Orion II Solar Project | Rosebud, TX | 228.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Chesapeake Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bedford Solar | Chesapeake, VA | 121.5 GWh | 7.4 mi |
Caden Energix Hickory LLC | Chesapeake, VA | 57.8 GWh | 7.1 mi |
Chesapeake | Chesapeake, VA | 178.0 MWh | 5.9 mi |
Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh | 6.2 mi |
Grassfield Solar | Chesapeake, VA | 41.0 GWh | 3.8 mi |
IKEA Norfolk Rooftop PV System | Norfolk, VA | 1.5 GWh | 14.2 mi |
Morgan's Corner | Elizabeth City, NC | 28.3 GWh | 18.6 mi |
Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh | 13.8 mi |
Oceana Solar | Virginia Beach, VA | 29.0 GWh | 15.4 mi |
Pleasant Hill Solar | Suffolk, VA | 20.7 GWh | 15.6 mi |
Ranchland Solar, LLC | Moyock, NC | 107.6 GWh | 16.7 mi |
Shawboro PV1 | Shawboro, NC | 35.8 GWh | 20.9 mi |
SoINCPower6, LLC | Sunbury, NC | 10.5 GWh | 23 mi |
Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh | 14.7 mi |
Summit Farms Solar | Moyock, NC | 79.4 GWh | 16.9 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 21.9 mi |
Virginia Beach | Virginia Beach, VA | 4.2 GWh | 8.7 mi |
Western Branch High School | Chesapeake, VA | 979.0 MWh | 12.8 mi |
Wheelabrator Portsmouth | Portsmouth, VA | 35.6 GWh | 8.5 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 22.4 mi |