Maplewood Solar
1271 Toshes Road, Climax, VA 24531Plant Summary Information
Maplewood Solar is ranked #41 out of 228 power plants in Virginia in terms of total annual net electricity generation.
Maplewood Solar generated 50.6 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Maplewood Solar |
---|---|
Utility Name | Dominion Renewable Energy |
Location | Pittsylvania County, VA |
Initial Operation Date | December 2022 |
Last Update | May 2025 |
Annual Generation | 195.7 GWh |
Annual Consumption | 733.0 k MMBtu |
Ranked #2,429 out of 12,312 Power Plants Nationwide | |
Ranked #351 out of 6,191 Solar Power Plants Nationwide | |
Ranked #41 out of 228 Virginia Power Plants | |
Ranked #10 out of 117 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Maplewood Solar (2021 to 2021) Dominion Renewable Energy (2022 to 2024) |
Map of Maplewood Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maplewood Solar.
Monthly Net Generation for Maplewood Solar
Maplewood Solar Details
Summary Information | |
---|---|
Plant Name | Maplewood Solar (65319) |
Plant Address | 1271 Toshes Road, Climax, VA 24531 |
Utility | Dominion Renewable Energy (58468) |
Latitude, Longitude | 36.89, -79.32 |
Generation Dates on File | Dec 2022 to May 2025 |
Initial Operation Date | December 2022 |
Annual Generation | 195.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator MAPL Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 120 MW |
Summer Capacity | 120 MW |
Winter Capacity | 120 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 144.7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Maplewood Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#341 | Springfield Solar (WI) | Lomira, WI | 202.1 GWh |
#342 | BPL Sol Solar LLC | Chilton, TX | 201.6 GWh |
#343 | Badger Hollow II | Cobb, WI | 201.4 GWh |
#344 | Cereal City Solar, LLC | Battle Creek, MI | 200.9 GWh |
#345 | Sigurd Solar LLC | Sigurd, UT | 200.4 GWh |
#346 | Badger Hollow I | Montfort, WI | 199.4 GWh |
#347 | Two Creeks Solar | Two Rivers, WI | 198.4 GWh |
#348 | Wildflower Solar, LLC (MS) | DeSoto, MS | 196.9 GWh |
#349 | 7V Solar Ranch | Muldoon, TX | 196.2 GWh |
#350 | Lockhart Solar PV II | Hinkley, CA | 195.8 GWh |
#352 | Fern Solar LLC | Battleboro, NC | 194.6 GWh |
#353 | Snipesville | Denton, GA | 194.3 GWh |
#354 | Bell Ridge Solar | Trenton, FL | 194.1 GWh |
#355 | Pioneer Solar (CO), LLC | Bennett, CO | 194.1 GWh |
#356 | Red Mesa Solar Project | Red Mesa, UT | 193.3 GWh |
#357 | Vikings Energy Farm | Holtville, CA | 180.6 GWh |
#358 | Sherco Solar I | Clear Lake, MN | 192.9 GWh |
#359 | Graphite Solar I | Wellington, UT | 192.5 GWh |
#360 | McFarland B Solar and Storage | Dateland, AZ | 187.9 GWh |
#361 | Steel Solar LLC | Plymouth, UT | 192.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maplewood Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altavista Power Station | Altavista, VA | 268.7 GWh | 16 mi |
Altavista Solar | Lynch Station, VA | 158.2 GWh | 17.9 mi |
Alton Post Office Solar | Alton, VA | 57.8 GWh | 27.3 mi |
Crystal Hill Solar | Crystal Hill, VA | 133.0 GWh | 21.4 mi |
Danville | Danville, VA | 12.5 GWh | 15.9 mi |
Danville Farm, LLC | Ringgold, VA | 19.7 GWh | 20.7 mi |
Danville Kentuck Road Plant | Ringgold, VA | 64.7 MWh | 15.9 mi |
Danville New Design Plant | Danville, VA | 53.8 MWh | 18.4 mi |
Energix Leatherwood, LLC | Axton, VA | 42.3 GWh | 25.7 mi |
Halifax | Halifax, VA | 1.4 GWh | 23.2 mi |
Halifax CSG LLC | South Boston, VA | 3.0 GWh | 25.6 mi |
Leesville | Hurt, VA | 48.4 GWh | 14.8 mi |
Monroe Solar | Chatham, VA | 4.7 GWh | 8.7 mi |
Schoolfield Dam | Danville, VA | 12.9 GWh | 22.5 mi |
Sycamore Solar | Gretna, VA | 85.4 GWh | 7.9 mi |
TPE Irish Road Solar, LLC | Chatham, VA | 11.1 GWh | 15.3 mi |
TPE Whitmell Solar, LLC | Chatham, VA | 11.1 GWh | 15.3 mi |
Water Strider Solar | Nathalie, VA | 166.2 GWh | 18.4 mi |
Whitehorn Solar | Gretna, VA | 75.0 GWh | 3.6 mi |
Zuma Solar, LLC | Providence, NC | 6.5 GWh | 27 mi |