Highlander Solar Energy Station 1
TBD, Spotsylvania, VA 22551Plant Summary Information
Highlander Solar Energy Station 1 is ranked #31 out of 245 power plants in Virginia in terms of total annual net electricity generation.
Highlander Solar Energy Station 1 generated 102.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Highlander Solar Energy Station 1 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Spotsylvania County, VA |
| Initial Operation Date | December 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 296.9 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #2,075 out of 13,301 Power Plants Nationwide | |
| Ranked #333 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #31 out of 245 Virginia Power Plants | |
| Ranked #5 out of 139 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Highlander Solar Station 1 LLC (2018 to 2019) AES Distributed Energy (2020 to 2025) |
Map of Highlander Solar Energy Station 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Highlander Solar Energy Station 1.
Monthly Net Generation for Highlander Solar Energy Station 1
Monthly Plant Fuel Consumption for Highlander Solar Energy Station 1
Highlander Solar Energy Station 1 Details
| Summary Information | |
|---|---|
| Plant Name | Highlander Solar Energy Station 1 (62014) |
| Plant Address | TBD, Spotsylvania, VA 22551 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 38.24712, -77.78622 |
| Generation Dates on File | Dec 2020 to Aug 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 296.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator HLND1 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 165 MW |
| Summer Capacity | 165 MW |
| Winter Capacity | 165 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 200.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Highlander Solar Energy Station 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #323 | Drew Solar LLC | Calexico, CA | 304.4 GWh |
| #324 | Optimist | West Point, MS | 300.6 GWh |
| #325 | Nebula Solar | La Feria, TX | 304.0 GWh |
| #326 | Hardin Solar Energy LLC | Alger, OH | 303.8 GWh |
| #327 | Swift Air Solar II | Odessa, TX | 303.1 GWh |
| #328 | Skipjack Solar Center | Wayside, VA | 302.5 GWh |
| #329 | Cass County Renewable Energy Center | Beardstown, IL | 302.5 GWh |
| #330 | Samson Solar Energy III LLC | Cunningham, TX | 300.5 GWh |
| #331 | Baldy Mesa Solar & Storage | Adelanto, CA | 293.1 GWh |
| #332 | Harry Allen Solar Energy LLC | Apex, NV | 297.7 GWh |
| #334 | Axial Basin Solar | Meeker, CO | 296.9 GWh |
| #335 | Boomtown Renewable Energy Center | Carmi, IL | 295.7 GWh |
| #336 | Morris Ridge Solar | Mount Morris, NY | 295.6 GWh |
| #337 | Hudson - High Desert Hybrid | Victorville, CA | 286.3 GWh |
| #338 | Quartz Solar, LLC | Wynne, AR | 293.7 GWh |
| #339 | Blythe Solar 110, LLC | Blythe, CA | 283.6 GWh |
| #340 | Pleasantville Solar Park | Ipava, IL | 292.8 GWh |
| #341 | Clearview Solar 1 | Quincy, OH | 292.8 GWh |
| #342 | Campo Verde Solar | El Centro, CA | 292.7 GWh |
| #343 | Maverick Solar 4, LLC | Desert Center, CA | 292.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Highlander Solar Energy Station 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Stafford | Stafford, VA | 1.7 GWh | 22.3 mi |
| Apple Grove Solar, LLC | Mineral, VA | 29.8 GWh | 23 mi |
| Desper Solar | Louisa, VA | 160.8 GWh | 21.2 mi |
| Electric Avenue Facility | Culpeper, VA | 659.0 MWh | 10.9 mi |
| Energix Aditya, LLC | Mineral, VA | 19.9 GWh | 18.3 mi |
| Gordonsville Energy LP | Gordonsville, VA | 1.4 TWh | 24.2 mi |
| Ladysmith | Woodford, VA | 748.0 GWh | 19.1 mi |
| Louisa Generation Facility | Gordonsville, VA | 646.1 GWh | 24.9 mi |
| Madison Solar (VA) | Locust Grove, VA | 125.3 GWh | 4.1 mi |
| Marsh Run Generation Facility | Remington, VA | 687.4 GWh | 19.5 mi |
| Martin Solar Center | Kents Store, VA | 7.5 GWh | 29.1 mi |
| North Anna | Mineral, VA | 15.8 TWh | 12.9 mi |
| North Stafford HS | Stafford, VA | 2.1 GWh | 23.5 mi |
| Pleinmont Solar 1 | Spotsylvania, VA | 143.6 GWh | 0 mi |
| Pleinmont Solar 2 | Spotsylvania, VA | 444.7 GWh | 0 mi |
| Remington | Remington, VA | 1.3 TWh | 20.5 mi |
| Remington Solar Facility | Remington, VA | 35.4 GWh | 20.8 mi |
| Richmond Spider Solar | Spotsylvania, VA | 36.2 GWh | 0 mi |
| Waste Management King George LFGTE | King George, VA | 72.2 GWh | 26 mi |
| Whitehouse Solar Farm | Louisa, VA | 33.3 GWh | 18.5 mi |