Greensville County Solar Project, LLC
1494 Rock Bridge Road, Skippers, VA 23879Plant Summary Information
Greensville County Solar Project, LLC is ranked #24 out of 123 solar farms in Virginia in terms of total annual net electricity generation.
Greensville County Solar Project, LLC generated 26.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Greensville County Solar Project, LLC |
|---|---|
| Utility Name | Dominion Energy Inc. |
| Location | Greensville County, VA |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 138.9 GWh |
| Annual Consumption | 497.0 k MMBtu |
| Ranked #3,019 out of 12,613 Power Plants Nationwide | |
| Ranked #671 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #59 out of 234 Virginia Power Plants | |
| Ranked #24 out of 123 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Dominion Energy Inc (2019 to 2021) Dominion Energy Inc. (2022 to 2024) |
Map of Greensville County Solar Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Greensville County Solar Project, LLC.
Monthly Net Generation for Greensville County Solar Project, LLC
Monthly Plant Fuel Consumption for Greensville County Solar Project, LLC
Greensville County Solar Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Greensville County Solar Project, LLC (63745) |
| Plant Address | 1494 Rock Bridge Road, Skippers, VA 23879 |
| Utility | Dominion Energy Inc. (5248) |
| Latitude, Longitude | 36.64, -77.57 |
| Generation Dates on File | Dec 2020 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 138.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-239-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator GVSO Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 0.96 |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 52 |
| DC Net Capacity | 104 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Greensville County Solar Project, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #661 | Resurgence Solar II | Boron, CA | 134.7 GWh |
| #662 | Palmer Solar | Fountain, CO | 140.2 GWh |
| #663 | NC 102 Project LLC | Midland, NC | 139.9 GWh |
| #664 | Balm Solar | Wimauma, FL | 139.9 GWh |
| #665 | Baldwin Solar BESS | Baldwin, IL | 139.6 GWh |
| #666 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 139.6 GWh |
| #667 | Discovery Solar Center | Merrit Island, FL | 139.5 GWh |
| #668 | White Oak Solar, LLC | Waynesboro, GA | 139.1 GWh |
| #669 | SR McKellar | Denmark, TN | 139.0 GWh |
| #670 | Jamison Solar (FL) | Mulberry, FL | 138.9 GWh |
| #672 | Moffett Solar Project | Ridgeland, SC | 138.5 GWh |
| #673 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 137.8 GWh |
| #674 | Indian River Solar Center | Vero Beach, FL | 137.9 GWh |
| #675 | Fort Drum Energy Center | Vero Beach, FL | 137.9 GWh |
| #676 | FPL Flowers Creek Solar Energy Center | Altha, FL | 137.9 GWh |
| #677 | Wheatridge Hybrid | Morrow, OR | 668.3 GWh |
| #678 | Golden Fields Solar I, LLC | Rosamond, CA | 137.7 GWh |
| #679 | Innovative Solar 37 LLC | Morven, NC | 137.5 GWh |
| #680 | Sunshine Gateway Solar Energy Center | Lake City, FL | 134.9 GWh |
| #681 | Crooked Run | Willard, NC | 137.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Greensville County Solar Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brunswick County Power Station | Freeman, VA | 9.7 TWh | 11.8 mi |
| Cottonwood Solar, LLC | Garysburg, NC | 4.6 GWh | 9.4 mi |
| Emporia | Emporia, VA | 6.8 GWh | 3.9 mi |
| Floyd Road Solar Farm | Gaston, NC | 9.2 GWh | 11 mi |
| Fountain Creek Solar | Skippers, VA | 131.7 GWh | 6.5 mi |
| Garysburg Solar | Garysburg, NC | 7.0 GWh | 11.9 mi |
| Gaston Solar | Gaston, NC | 9.1 GWh | 9.9 mi |
| Greensville County Power Station | Emporia, VA | 11.3 TWh | 7 mi |
| Gutenberg Solar | Garysburg, NC | 147.8 GWh | 10.8 mi |
| Hemlock Solar | Garysburg, NC | 9.3 GWh | 11.9 mi |
| KapStone Kraft Paper Corp | Roanoke Rapids, NC | 198.6 GWh | 11.9 mi |
| Long Farm 46 Solar, LLC | Garysburg, NC | 8.2 GWh | 12.2 mi |
| Meherrin Solar | Skippers, VA | 122.0 GWh | 5.6 mi |
| Oak Solar | Gaston, NC | 256.0 GWh | 13.8 mi |
| Pecan Solar | Pleasant Hill, NC | 152.8 GWh | 12 mi |
| Pleasant Hill PV1 | Pleasant Hill, NC | 22.9 GWh | 7.6 mi |
| Roanoke Rapids | Roanoke Rapids, NC | 271.7 GWh | 12.5 mi |
| Rosemary Power Station | Roanoke Rapids, NC | 15.5 GWh | 13.9 mi |
| Sadler Solar | Emporia, VA | 183.9 GWh | 3.3 mi |
| Seaboard Solar LLC | Seaboard, NC | 7.5 GWh | 12.6 mi |