Sunnybrook Solar Project - Hybrid
Clays Mill Rd, Scottsburg, VA 24589Plant Summary Information
Sunnybrook Solar Project - Hybrid is ranked #37 out of 122 solar farms in Virginia in terms of total annual net electricity generation.
Sunnybrook Solar Project - Hybrid generated 26.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Sunnybrook Solar Project - Hybrid |
|---|---|
| Utility Name | Sunnybrook Farm Solar, LLC |
| Location | Halifax County, VA |
| Initial Operation Date | December 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 89.2 GWh |
| Annual Consumption | 326.1 k MMBtu |
| Ranked #3,512 out of 12,539 Power Plants Nationwide | |
| Ranked #842 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #74 out of 233 Virginia Power Plants | |
| Ranked #37 out of 122 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Sunnybrook Solar Project - Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sunnybrook Solar Project - Hybrid.
Monthly Net Generation for Sunnybrook Solar Project - Hybrid
Sunnybrook Solar Project - Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Sunnybrook Solar Project - Hybrid (65307) |
| Plant Address | Clays Mill Rd, Scottsburg, VA 24589 |
| Utility | Sunnybrook Farm Solar, LLC (64612) |
| Latitude, Longitude | 36.79872, -78.83961 |
| Generation Dates on File | Dec 2022 to Sep 2025 |
| Initial Operation Date | December 2022 |
| Annual Generation | 89.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator SUNS Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 51 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 51 MW |
| Winter Capacity | 51 MW |
| Minimum Load | 1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 57.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sunnybrook Solar Project - Hybrid Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #832 | Peace Creek Solar | Bartow, FL | 90.9 GWh |
| #833 | Highest Power Solar, LLC | Louisburg, NC | 90.8 GWh |
| #834 | Bird Dog Solar | Waynesboro, GA | 90.5 GWh |
| #835 | Vancourt Solar Interconnections | La Feria, TX | 90.5 GWh |
| #836 | Beacon Solar Plant Site 5 | Cantil, CA | 90.4 GWh |
| #837 | Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh |
| #838 | Lake Hancock Solar | Bartow, FL | 90.2 GWh |
| #839 | Hattiesburg Solar Farm | Hattiesburg, MS | 89.9 GWh |
| #840 | Monroe Solar Facility | Monroe, NC | 89.8 GWh |
| #841 | Brightside | Beeville, TX | 89.2 GWh |
| #843 | Nevada Solar One | Boulder City, NV | 89.8 GWh |
| #844 | Sumrall I Solar Farm | Sumrall, MS | 88.8 GWh |
| #845 | Edwards Sanborn S4 | Mojave, CA | 88.2 GWh |
| #846 | Sanford Solar | Sanford, ME | 88.0 GWh |
| #847 | Moody Air Force Base Solar | Valdosta, GA | 88.0 GWh |
| #848 | Wimauma Solar and Battery Storage | Wimauma, FL | 86.9 GWh |
| #849 | Edwards Sanborn S3 | Mojave, CA | 83.4 GWh |
| #850 | Gransolar Texas One, LLC | Thorndale, TX | 86.4 GWh |
| #851 | Red Rock | Red Rock, AZ | 82.7 GWh |
| #852 | Salt Creek Township Solar, LLC | Mason City, IL | 86.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sunnybrook Solar Project - Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alton Post Office Solar | Alton, VA | 116.4 GWh | 19.2 mi |
| Bluestone Solar | Chase City, VA | 82.8 GWh | 19.7 mi |
| Clover | Clover, VA | 1.3 TWh | 8.9 mi |
| Crystal Hill Solar | Crystal Hill, VA | 131.4 GWh | 6.2 mi |
| ESA Boston Solar, LLC | Roxboro, NC | 9.5 GWh | 22.1 mi |
| Foxhound | Clover, VA | 154.2 GWh | 7.6 mi |
| Grasshopper Solar | Chase City, VA | 123.5 GWh | 21.8 mi |
| Halifax (VA) | Halifax, VA | 1.4 GWh | 4.8 mi |
| Halifax County Biomass | South Boston, VA | 351.6 GWh | 7 mi |
| Halifax CSG LLC | South Boston, VA | 3.0 GWh | 9.9 mi |
| Mayo | Roxboro, NC | 1.2 TWh | 18.9 mi |
| Otter Creek Solar | Chase City, VA | 131.2 GWh | 18.3 mi |
| Piney Creek Solar | Clover, VA | 157.9 GWh | 4 mi |
| Powells Creek Solar - Hybrid | Alton, VA | 152.7 GWh | 19.8 mi |
| Roxboro Farm | Roxboro, NC | 8.7 GWh | 22.5 mi |
| Sycamore Solar | Gretna, VA | 85.5 GWh | 21.9 mi |
| Twittys Creek Solar, LLC | Keysville, VA | 24.0 GWh | 20.8 mi |
| Water Strider Solar | Nathalie, VA | 165.1 GWh | 18.3 mi |
| Watlington Solar | Halifax, VA | 39.6 GWh | 8.5 mi |
| Woodsdale Farm, LLC | Roxboro, NC | 3.4 GWh | 23.9 mi |