Foxglove Solar
948 Clark Road, Middletown, VA 22645Plant Summary Information
Foxglove Solar is ranked #32 out of 122 solar farms in Virginia in terms of total annual net electricity generation.
Foxglove Solar generated 37.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Foxglove Solar |
|---|---|
| Utility Name | Urban Grid Solar |
| Location | Frederick County, VA |
| Initial Operation Date | October 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 119.4 GWh |
| Annual Consumption | 407.5 k MMBtu |
| Ranked #3,201 out of 12,539 Power Plants Nationwide | |
| Ranked #736 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #67 out of 233 Virginia Power Plants | |
| Ranked #32 out of 122 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Foxglove Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foxglove Solar.
Monthly Net Generation for Foxglove Solar
Foxglove Solar Details
| Summary Information | |
|---|---|
| Plant Name | Foxglove Solar (66841) |
| Plant Address | 948 Clark Road, Middletown, VA 22645 |
| Utility | Urban Grid Solar (65777) |
| Latitude, Longitude | 39.07383, -78.28012 |
| Generation Dates on File | Oct 2024 to Sep 2025 |
| Initial Operation Date | October 2024 |
| Annual Generation | 119.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator FOXG1 Details Operating October 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 01MDWBRK |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 01MDWBRK |
| Nameplate Capacity | 75 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 75 MW |
|---|---|
| Winter Capacity | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 96.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Foxglove Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #726 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #727 | Little Bear 5 | Mendota, CA | 121.7 GWh |
| #728 | Baldwin Solar BESS | Baldwin, IL | 121.4 GWh |
| #729 | Rice Creek | Putnam, FL | 121.6 GWh |
| #730 | Bonnybrooke PV | Florence, AZ | 121.2 GWh |
| #731 | Bedford Solar (Dominion) | Chesapeake, VA | 121.2 GWh |
| #732 | Borden Solar Farm | Madera, CA | 121.0 GWh |
| #733 | Skysol | Merrill, OR | 120.4 GWh |
| #734 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 120.3 GWh |
| #735 | Meridian III | Meridian, MS | 119.9 GWh |
| #737 | Alpine Solar | Lancaster, CA | 118.8 GWh |
| #738 | Lamesa II | Lamesa, TX | 118.8 GWh |
| #739 | Magnolia Springs Solar Center | Green Cove Springs, FL | 118.6 GWh |
| #740 | Hooper Solar | Mosca, CO | 118.3 GWh |
| #741 | Twin Lakes | Interlachen, FL | 117.8 GWh |
| #742 | Kayenta Solar Project | Kayenta, AZ | 117.2 GWh |
| #743 | Sandstone Solar | Florence, AZ | 117.2 GWh |
| #744 | Madison Solar (VA) | Locust Grove, VA | 117.2 GWh |
| #745 | Hecate Energy Beacon Solar 4 | Cantil, CA | 117.2 GWh |
| #746 | Maiden Creek Solar Power Plant | Maiden, NC | 116.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foxglove Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartonsville Energy Facility, LLC | Stephens, VA | 186.7 GWh | 2.4 mi |
| Big Spring Solar (CSG) | Clear Spring, MD | 264.0 MWh | 43.2 mi |
| Blake Solar Plant | Charles Town, WV | 160.2 GWh | 27.3 mi |
| Caden Energix Endless Caverns, LLC | New Market, VA | 54.5 GWh | 38.3 mi |
| Capon Bridge Solar LLC | Augusta, WV | 12.0 GWh | 24.4 mi |
| Dam No. 4 Hydro Station | Shepherdstown, WV | 8.8 GWh | 37.8 mi |
| Dam No. 5 Hydro Station | Hedgesville, WV | 4.1 GWh | 41.4 mi |
| DG AMP Solar Front Royal | Front Royal, VA | 4.0 GWh | 11.4 mi |
| Frederick County LFGTE Facility | Winchester, VA | 13.0 GWh | 10.8 mi |
| Hecate Energy Clarke County LLC | White Post, VA | 15.2 GWh | 7.6 mi |
| HP Hood CT | Winchester, VA | 110.1 GWh | 6.4 mi |
| Luray Hydro Station | Luray, VA | 2.6 GWh | 29.9 mi |
| Millville Hydro Station | Millville, WV | 8.6 GWh | 29.9 mi |
| Mt. Jackson Solar | Mt. Jackson, VA | 33.0 GWh | 30.8 mi |
| Newport Hydro Station | Newport, VA | 3.1 GWh | 38.6 mi |
| Potomac Energy Center, LLC | Leesburg, VA | 4.6 TWh | 39.5 mi |
| Randolf Solar | Mount Jackson, VA | 6.3 GWh | 31.1 mi |
| The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.2 GWh | 9.5 mi |
| Warren County | Front Royal, VA | 9.3 TWh | 9 mi |
| Water Treatment Plant Generators | Gainesville, VA | 2.0 MWh | 41.5 mi |