Alton Post Office Solar
3058 Alton Post Office Road, Alton, VA 24520Plant Summary Information
Alton Post Office Solar is ranked #27 out of 124 solar farms in Virginia in terms of total annual net electricity generation.
Alton Post Office Solar generated 24.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Alton Post Office Solar |
|---|---|
| Utility Name | Urban Grid Solar |
| Location | Halifax County, VA |
| Initial Operation Date | December 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 135.6 GWh |
| Annual Consumption | 506.0 k MMBtu |
| Ranked #3,072 out of 12,332 Power Plants Nationwide | |
| Ranked #711 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #62 out of 227 Virginia Power Plants | |
| Ranked #27 out of 124 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Alton Post Office Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alton Post Office Solar.
Monthly Net Generation for Alton Post Office Solar
Monthly Plant Fuel Consumption for Alton Post Office Solar
Alton Post Office Solar Details
| Summary Information | |
|---|---|
| Plant Name | Alton Post Office Solar (66837) |
| Plant Address | 3058 Alton Post Office Road, Alton, VA 24520 |
| Utility | Urban Grid Solar (65777) |
| Latitude, Longitude | 36.56892, -79.03292 |
| Generation Dates on File | Dec 2024 to Mar 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 135.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator ALPT1 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 3WELCO |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 3WELCO |
| Nameplate Capacity | 75 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 91.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Alton Post Office Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #701 | Gutenberg Solar | Garysburg, NC | 137.7 GWh |
| #702 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 137.3 GWh |
| #703 | NC 102 Project LLC | Midland, NC | 137.3 GWh |
| #704 | Lake Mabel Solar and Battery Storage | Lake Wales, FL | 133.0 GWh |
| #705 | SR DeSoto III | DeSoto, GA | 136.2 GWh |
| #706 | Miami Dade Solar Energy Center | Miami, FL | 135.9 GWh |
| #707 | Bookers Mill Solar | Farnham, VA | 135.8 GWh |
| #708 | Trailside Solar Center | Elkton, FL | 135.7 GWh |
| #709 | Platteview Solar LLC | Ashland, NE | 135.7 GWh |
| #710 | Crooked Run | Willard, NC | 135.6 GWh |
| #712 | Ibis | Palm Bay, FL | 135.2 GWh |
| #713 | Sunshine Gateway Solar Energy Center | Lake City, FL | 132.6 GWh |
| #714 | Colgreen North Shore Solar Farm | Mecca, CA | 134.5 GWh |
| #715 | Moffett Solar Project | Ridgeland, SC | 134.4 GWh |
| #716 | Trent River Solar, LLC | Pollocksville, NC | 134.3 GWh |
| #717 | Titan Solar 1 (CA) | Borrego Springs, CA | 134.1 GWh |
| #718 | SR McKellar | Denmark, TN | 134.1 GWh |
| #719 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 133.9 GWh |
| #720 | Norton Solar Farm | Bronte, TX | 134.0 GWh |
| #721 | Great Bay Solar 1 | Princess Anne, MD | 133.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alton Post Office Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Crystal Hill Solar | Crystal Hill, VA | 127.2 GWh | 19.4 mi |
| Danville | Danville, VA | 12.5 GWh | 16.1 mi |
| Danville Farm, LLC | Ringgold, VA | 20.0 GWh | 15 mi |
| Danville Kentuck Road Plant | Ringgold, VA | 64.7 MWh | 16.1 mi |
| ESA Boston Solar, LLC | Roxboro, NC | 9.5 GWh | 8.4 mi |
| Halifax (VA) | Halifax, VA | 1.4 GWh | 15.9 mi |
| Halifax County Biomass | South Boston, VA | 351.6 GWh | 12.7 mi |
| Halifax CSG LLC | South Boston, VA | 3.0 GWh | 9.2 mi |
| Mayo | Roxboro, NC | 1.5 TWh | 8.3 mi |
| PCIP Solar | Timberlake, NC | 1.6 GWh | 18.1 mi |
| Perkins Solar, LLC | Roxboro, NC | 3.8 GWh | 9.7 mi |
| Powells Creek Solar - Hybrid | Alton, VA | 150.3 GWh | 1 mi |
| Roxboro | Semora, NC | 6.6 TWh | 6.3 mi |
| Roxboro Farm | Roxboro, NC | 8.7 GWh | 8.9 mi |
| Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 88.1 GWh | 19.2 mi |
| Wagstaff Farm 1 | Roxboro, NC | 8.5 GWh | 8.7 mi |
| Watlington Solar | Halifax, VA | 39.6 GWh | 11.3 mi |
| Woodsdale Farm, LLC | Roxboro, NC | 3.4 GWh | 8.6 mi |
| Yanceyville Farm | Blanch, NC | 8.3 GWh | 16.3 mi |
| Yanceyville Farm 2 LLC | Blanch, NC | 9.3 GWh | 19.1 mi |