Otter Creek Solar
TBD, Chase City, VA 23924Plant Summary Information
Otter Creek Solar is ranked #32 out of 124 solar farms in Virginia in terms of total annual net electricity generation.
Otter Creek Solar generated 22.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Otter Creek Solar |
|---|---|
| Utility Name | Dominion Energy Inc. |
| Location | Mecklenburg County, VA |
| Initial Operation Date | October 2023 |
| Last Update | Mar 2026 |
| Annual Generation | 122.5 GWh |
| Annual Consumption | 459.9 k MMBtu |
| Ranked #3,201 out of 12,332 Power Plants Nationwide | |
| Ranked #766 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #67 out of 227 Virginia Power Plants | |
| Ranked #32 out of 124 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Otter Creek Solar LLC (2019 to 2019) Dominion Renewable Energy (2020 to 2020) Dominion Energy Inc (2021 to 2021) Dominion Energy Inc. (2022 to 2024) |
Map of Otter Creek Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Otter Creek Solar.
Monthly Net Generation for Otter Creek Solar
Monthly Plant Fuel Consumption for Otter Creek Solar
Otter Creek Solar Details
| Summary Information | |
|---|---|
| Plant Name | Otter Creek Solar (63909) |
| Plant Address | TBD, Chase City, VA 23924 |
| Utility | Dominion Energy Inc. (5248) |
| Latitude, Longitude | 36.80713, -78.50977 |
| Generation Dates on File | Jun 2024 to Mar 2026 |
| Initial Operation Date | October 2023 |
| Annual Generation | 122.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator OTTER Details Operating October 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 60 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 84 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Otter Creek Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #756 | Palmetto Plains | Bowman, SC | 125.9 GWh |
| #757 | Solar Star Oregon II | Prineville, OR | 125.6 GWh |
| #758 | Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 123.3 GWh |
| #759 | Coral Farms Solar Energy Center | Florahome, FL | 125.4 GWh |
| #760 | RE Camelot LLC | Mojave, CA | 125.1 GWh |
| #761 | Hawtree Solar | Warrenton, NC | 124.7 GWh |
| #762 | Meherrin Solar | Skippers, VA | 124.4 GWh |
| #763 | Laurel Oaks Solar | Plant City, FL | 124.1 GWh |
| #764 | Wheatsborough Solar | Bellevue, OH | 123.5 GWh |
| #765 | Macho Springs | Deming, NM | 122.7 GWh |
| #767 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #768 | Alafia Solar | Mulberry, FL | 121.9 GWh |
| #769 | Kayenta Solar Project | Kayenta, AZ | 121.7 GWh |
| #770 | Hecate Energy Beacon Solar 3 | Cantil, CA | 121.6 GWh |
| #771 | Grange Hall Solar | Wimauma, FL | 121.5 GWh |
| #772 | OE_GA3 | Camilla, GA | 121.3 GWh |
| #773 | Northern Preserve Solar | Glen St. Mary, FL | 121.3 GWh |
| #774 | Bonnybrooke PV | Florence, AZ | 121.2 GWh |
| #775 | Farmington Solar | Farmington, ME | 121.2 GWh |
| #776 | Jicarilla Solar 1 LLC | Dulce, NM | 116.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Otter Creek Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bluestone Solar | Chase City, VA | 80.4 GWh | 1.5 mi |
| Bullock Solar, LLC | Manson, NC | 99.9 GWh | 25.3 mi |
| Clover | Clover, VA | 1.6 TWh | 11.6 mi |
| Crystal Hill Solar | Crystal Hill, VA | 127.2 GWh | 23.8 mi |
| Foxhound | Clover, VA | 155.1 GWh | 13.7 mi |
| Granville Solar PV Power Project | Oxford, NC | 4.7 GWh | 27.7 mi |
| Grasshopper Solar | Chase City, VA | 120.1 GWh | 4.4 mi |
| Halifax (VA) | Halifax, VA | 1.4 GWh | 23 mi |
| Halifax County Biomass | South Boston, VA | 351.6 GWh | 21.4 mi |
| Halifax CSG LLC | South Boston, VA | 3.0 GWh | 25.4 mi |
| Hawtree Solar | Warrenton, NC | 124.7 GWh | 29.4 mi |
| John H Kerr | Boydton, VA | 462.9 GWh | 18.4 mi |
| Kelly Solar, LLC | Henderson, NC | 8.7 GWh | 28.9 mi |
| Mayo | Roxboro, NC | 1.5 TWh | 28.6 mi |
| Piney Creek Solar | Clover, VA | 150.6 GWh | 14.5 mi |
| Stagecoach Solar | Henderson, NC | 8.8 GWh | 27.3 mi |
| Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 88.1 GWh | 18.3 mi |
| Twittys Creek Solar, LLC | Keysville, VA | 24.0 GWh | 15.1 mi |
| Virginia Line Solar, LLC | Manson, NC | 78.7 GWh | 23.2 mi |
| Watlington Solar | Halifax, VA | 39.6 GWh | 22.6 mi |