Grasshopper Solar
29172 Highway 49, Chase City, VA 23924Plant Summary Information
Grasshopper Solar is ranked #32 out of 123 solar farms in Virginia in terms of total annual net electricity generation.
Grasshopper Solar generated 21.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Grasshopper Solar |
|---|---|
| Utility Name | Dominion Energy Inc. |
| Location | Mecklenburg County, VA |
| Initial Operation Date | September 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 122.5 GWh |
| Annual Consumption | 436.6 k MMBtu |
| Ranked #3,194 out of 12,613 Power Plants Nationwide | |
| Ranked #745 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #67 out of 234 Virginia Power Plants | |
| Ranked #32 out of 123 Virginia Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Dominion Energy Inc (2018 to 2021) Dominion Energy Inc. (2022 to 2024) |
Map of Grasshopper Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grasshopper Solar.
Monthly Net Generation for Grasshopper Solar
Monthly Plant Fuel Consumption for Grasshopper Solar
Grasshopper Solar Details
| Summary Information | |
|---|---|
| Plant Name | Grasshopper Solar (62813) |
| Plant Address | 29172 Highway 49, Chase City, VA 23924 |
| Utility | Dominion Energy Inc. (5248) |
| Latitude, Longitude | 36.85, -78.45 |
| Generation Dates on File | Sep 2020 to Dec 2025 |
| Initial Operation Date | September 2020 |
| Annual Generation | 122.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator GRHS Details Operating September 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 0.99 |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 103.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Grasshopper Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #735 | Solar Star Oregon II | Prineville, OR | 124.7 GWh |
| #736 | Farmington Solar | Farmington, ME | 124.1 GWh |
| #737 | Laurel Oaks Solar | Plant City, FL | 123.9 GWh |
| #738 | OE_GA3 | Camilla, GA | 123.8 GWh |
| #739 | Cotton Creek Solar Energy Center | McDavid, FL | 123.6 GWh |
| #740 | Caden Energix Axton LLC | Axton, VA | 123.1 GWh |
| #741 | Macho Springs | Deming, NM | 122.7 GWh |
| #742 | BT Cooke Solar, LLC | Gainsville, TX | 122.5 GWh |
| #743 | Twin Lakes | Interlachen, FL | 122.5 GWh |
| #744 | Oriana Solar LLC | Victoria, TX | 122.5 GWh |
| #746 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #747 | Hecate Energy Beacon Solar 3 | Cantil, CA | 122.1 GWh |
| #748 | Meherrin Solar | Skippers, VA | 122.0 GWh |
| #749 | Bonnybrooke PV | Florence, AZ | 121.2 GWh |
| #750 | Kayenta Solar Project | Kayenta, AZ | 121.0 GWh |
| #751 | Magnolia Springs Solar Center | Green Cove Springs, FL | 120.8 GWh |
| #752 | Lamesa II | Lamesa, TX | 120.7 GWh |
| #753 | Coral Farms Solar Energy Center | Florahome, FL | 119.6 GWh |
| #754 | Bedford Solar (Dominion) | Chesapeake, VA | 119.5 GWh |
| #755 | Grange Hall Solar | Wimauma, FL | 119.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grasshopper Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bluestone Solar | Chase City, VA | 82.1 GWh | 3.3 mi |
| Bullock Solar, LLC | Manson, NC | 101.2 GWh | 26.9 mi |
| Clover | Clover, VA | 1.6 TWh | 14.1 mi |
| Crystal Hill Solar | Crystal Hill, VA | 128.6 GWh | 27 mi |
| Foxhound | Clover, VA | 155.9 GWh | 16.2 mi |
| Granville Solar PV Power Project | Oxford, NC | 4.7 GWh | 31.3 mi |
| Halifax (VA) | Halifax, VA | 1.4 GWh | 26.6 mi |
| Halifax County Biomass | South Boston, VA | 351.6 GWh | 25.6 mi |
| Halifax CSG LLC | South Boston, VA | 3.0 GWh | 29.5 mi |
| Hawtree Solar | Warrenton, NC | 125.9 GWh | 29.1 mi |
| HCE Moran Solar, LLC | Rice, VA | 7.0 MWh | 28 mi |
| John H Kerr | Boydton, VA | 462.9 GWh | 19.2 mi |
| Otter Creek Solar | Chase City, VA | 127.6 GWh | 4.4 mi |
| Piney Creek Solar | Clover, VA | 153.5 GWh | 17.9 mi |
| Prince Edward CSG LLC | Pamplin, VA | 7.3 GWh | 29.1 mi |
| Stagecoach Solar | Henderson, NC | 8.8 GWh | 30.1 mi |
| Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 89.8 GWh | 21.8 mi |
| Twittys Creek Solar, LLC | Keysville, VA | 24.0 GWh | 13.7 mi |
| Virginia Line Solar, LLC | Manson, NC | 79.9 GWh | 24.3 mi |
| Watlington Solar | Halifax, VA | 39.6 GWh | 26.8 mi |