Cavalier Solar A2
10045 Mill Swamp Road, Smithfield, VA 23430Plant Summary Information
Cavalier Solar A2 is ranked #50 out of 243 power plants in Virginia in terms of total annual net electricity generation.
Cavalier Solar A2 generated 50.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Cavalier Solar A2 |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Isle of Wight County, VA |
| Initial Operation Date | December 2024 |
| Last Update | May 2026 |
| Annual Generation | 162.6 GWh |
| Annual Consumption | 599.7 k MMBtu |
| Ranked #2,839 out of 13,081 Power Plants Nationwide | |
| Ranked #612 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #50 out of 243 Virginia Power Plants | |
| Ranked #16 out of 138 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of Cavalier Solar A2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cavalier Solar A2.
Monthly Net Generation for Cavalier Solar A2
Monthly Plant Fuel Consumption for Cavalier Solar A2
Cavalier Solar A2 Details
| Summary Information | |
|---|---|
| Plant Name | Cavalier Solar A2 (67421) |
| Plant Address | 10045 Mill Swamp Road, Smithfield, VA 23430 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 37.018, -76.7358 |
| Generation Dates on File | Dec 2024 to May 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 162.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 23-236-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator CAVA2 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 84.4 MW |
| Summer Capacity | 84.4 MW |
| Winter Capacity | 84.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 101.69 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cavalier Solar A2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #602 | Turnpike | Vero Beach, FL | 164.3 GWh |
| #603 | Pecan Tree | Defuniak Springs, FL | 163.8 GWh |
| #604 | LaFayette Solar Farm | LaFayette, AL | 163.8 GWh |
| #605 | Trenton Solar Power Plant | Trenton, FL | 163.6 GWh |
| #606 | Longbow Solar, LLC | Liverpool, TX | 163.4 GWh |
| #607 | Hobnail Solar | Hephzibah, GA | 163.4 GWh |
| #608 | Ellis Solar LLC | Midlothian, TX | 163.4 GWh |
| #609 | Shaw Creek Solar, LLC | Aiken, SC | 163.1 GWh |
| #610 | SR Terrell | Dawson, GA | 163.0 GWh |
| #611 | Orchard | Ft. Pierce, FL | 162.9 GWh |
| #613 | Foxhound | Clover, VA | 162.6 GWh |
| #614 | Sundance Renewable Energy Center | Lee, FL | 162.4 GWh |
| #615 | High Springs Solar Power Plant | High Springs, FL | 162.4 GWh |
| #616 | Eastern Shore Solar, LLC | Oak Hall, VA | 161.9 GWh |
| #617 | Cove Mountain Solar | Beryl, UT | 161.8 GWh |
| #618 | Big Juniper Solar | TBD, FL | 161.5 GWh |
| #619 | Altavista Solar | Lynch Station, VA | 161.3 GWh |
| #620 | Redlands | TBD, FL | 161.3 GWh |
| #621 | Bullfrog Creek Solar | Wimauma, FL | 161.2 GWh |
| #622 | Cabin Creek Solar, LLC | Biscoe, NC | 161.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cavalier Solar A2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cavalier Solar | Smithfield, VA | 292.9 GWh | 0 mi |
| Colonial Trail West | Spring Grove, VA | 302.7 GWh | 12.4 mi |
| Fort Powhatan Solar | Disputanta, VA | 306.9 GWh | 25.3 mi |
| Gravel Neck | Surry, VA | 120.0 GWh | 9.9 mi |
| International Paper Franklin Mill | Franklin, VA | 281.2 GWh | 25.3 mi |
| Norge Solar Farm | Williamsburg, VA | 35.3 GWh | 24.1 mi |
| Nuby Run Solar, LLC | Windsor, VA | 1.7 GWh | 9.6 mi |
| Pleasant Hill Solar | Suffolk, VA | 42.0 GWh | 24.1 mi |
| Prairie Solar (VA) | Windsor, VA | 3.0 MWh | 11.8 mi |
| Rochambeau Solar | Williamsburg, VA | 31.8 GWh | 23 mi |
| Solidago Solar | Windsor, VA | 34.6 GWh | 9 mi |
| Spring Grove I | Spring Grove, VA | 196.3 GWh | 14.8 mi |
| Spring Grove Solar 2 | Spring Grove, VA | 107.8 GWh | 14.6 mi |
| Suffolk CSG, LLC | Suffolk, VA | 7.1 GWh | 23 mi |
| Surry | Surry, VA | 12.2 TWh | 10.4 mi |
| TWE Myrtle Solar Farm, LLC | Suffolk, VA | 28.3 GWh | 16.2 mi |
| Waste Management Bethel LFGTE | Hampton, VA | 37.3 GWh | 16.6 mi |
| Waverly Solar, LLC | Waverly, VA | 208.4 GWh | 21.3 mi |
| Western Branch High School | Chesapeake, VA | 921.0 MWh | 21.6 mi |
| Woodland Solar Farm | Smithfield, VA | 32.9 GWh | 11.2 mi |