Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| HCE Roark Mill Solar, LLC | Standard Solar | Hurt, VA | PJM Interconnection, LLC (PJM) | 2.8 GWh | Jul 2024 | Dec 2024 | Solar |
| Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 1.8 GWh | Feb 2022 | Dec 2024 | Solar |
| HCE Amelia Solar I, LLC | Standard Solar | Amelia Court House, VA | PJM Interconnection, LLC (PJM) | 7.5 GWh | Nov 2023 | Dec 2024 | Solar |
| HCE Amelia Solar II, LLC | Standard Solar | Amelia, VA | PJM Interconnection, LLC (PJM) | 5.6 GWh | Nov 2023 | Dec 2024 | Solar |
| SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2020 | Dec 2024 | Solar |
| HCE Moran Solar, LLC | Standard Solar | Rice, VA | PJM Interconnection, LLC (PJM) | 7.0 MWh | Nov 2024 | Dec 2024 | Solar |
| HCE Powhatan Solar, LLC | Standard Solar | Powhatan, VA | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2023 | Dec 2024 | Solar |
| HCE Reams Solar, LLC | Standard Solar | Dinwiddie, VA | PJM Interconnection, LLC (PJM) | 2.9 GWh | Jul 2024 | Dec 2024 | Solar |
| Mtn. Solar 4 (CSG) | Standard Solar | Lakewood, CO | Public Service Company of Colorado (PSCO) | 3.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Shepherds Mill CSG | Standard Solar | Union Bridge, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Aug 2021 | Dec 2024 | Solar |
| OER Monarch CSG | Standard Solar | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
| OER Patuxent CSG | Standard Solar | Lothian, MD | PJM Interconnection, LLC (PJM) | 4.3 GWh | Oct 2022 | Dec 2024 | Solar |
| Yamhill Solar LLC | Standard Solar | Amity, OR | Portland General Electric Company (PGE) | 881.0 MWh | Sep 2011 | Dec 2024 | Solar |
| Stanly Solar, LLC | Stanly Solar, LLC | Albemarle, NC | Duke Energy Carolinas (DUK) | 89.2 GWh | Jul 2022 | Feb 2026 | Solar |
| Curtis H Stanton Energy Center | Stanton Clean Energy LLC | Orlando, FL | Duke Energy Florida, Inc. (FPC) | 3.6 TWh | Sep 2003 | Feb 2026 | Natural Gas |
| Star Garden | Star Garden LLC | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
| Star Peak Geothermal Plant | Star Peak Geothermal LLC. | Imlay, NV | Nevada Power Company (NEVP) | 39.6 GWh | Jul 2022 | Dec 2024 | Geothermal |
| Star Solar | Star Solar LLC | Durham, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Starvation | Starvation Solar I, LLC | Hines, OR | Bonneville Power Administration (BPAT) | 23.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Glades Pike Generation Plant | State Correctnl Inst Laurel Highlands | Somerset, PA | PJM Interconnection, LLC (PJM) | 7.7 GWh | Sep 2011 | Dec 2024 | Landfill Gas |
| State Farm | State Farm Insurance | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | Sep 1996 | Feb 2026 | Distillate Fuel Oil |
| State Farm Insur Support Center Central | State Farm Mutual Auto Ins Co | Irving, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 11.0 MWh | Dec 1997 | Dec 2025 | Distillate Fuel Oil |
| MNDOT Standby Generation | State of Minnesota Department of Administration | St. Paul, MN | Midcontinent Independent System Operator, Inc. (MISO) | 52.0 MWh | Jun 1995 | Feb 2026 | Distillate Fuel Oil |
| Central Power Plant | State of Rhode Island | Cranston, RI | ISO New England (ISNE) | 18.8 GWh | Jul 1958 | Feb 2026 | Natural Gas : 97.5% Distillate Fuel Oil : 2.5% |
| Steamboat II | Steamboat Development Corp | Reno, NV | Nevada Power Company (NEVP) | 62.7 GWh | Jul 1992 | Dec 2024 | Geothermal |
| Steamboat III | Steamboat Development Corp | Reno, NV | Nevada Power Company (NEVP) | 69.4 GWh | Sep 1992 | Dec 2024 | Geothermal |
| Stearns Solar I | Stearns Solar I LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2019 | May 2024 | Solar |
| Steel Bridge Solar, LLC | Steel Bridge Solar. LLC | Sheridan, OR | Portland General Electric Company (PGE) | 3.3 GWh | Jan 2016 | May 2024 | Solar |
| Steel Solar LLC | Steel Solar, LLC | Plymouth, UT | Western Area Power Administration - Upper Great Plains West (WAUW) | 197.7 GWh | May 2024 | Feb 2026 | Solar |
| Steele Flats Wind Project LLC | Steele Flats Wind Project LLC | Diller, NE | Southwest Power Pool (SWPP) | 364.0 GWh | Sep 2013 | Feb 2026 | Wind |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| Stephens Ranch Wind Energy LLC | Stephens Ranch Wind Energy LLC | O'Donnell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 906.0 GWh | Nov 2014 | Feb 2026 | Wind |
| Sterling Power Plant | Sterling Power Partners LP | Sherrill, NY | New York Independent System Operator (NYIS) | 3.7 GWh | May 1991 | Dec 2024 | Natural Gas : 99.7% |
| Stevens Community Medical Center | Stevens Community Medical Center | Morris, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 MWh | Apr 2004 | Dec 2023 | Distillate Fuel Oil |
| Stikeleather Farm | Stikeleather Farm, LLC | Hiddenite, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Jul 2015 | Dec 2024 | Solar |
| Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 674.0 MWh | Apr 2020 | Dec 2024 | Other Biomass Gas |
| OCI Stillhouse Solar | Stillhouse Solar LLC | Rogers, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 112.2 GWh | - | Feb 2026 | Solar |
| Stillwater Energy Center | Stillwater Utilities Authority | Stillwater, OK | Southwest Power Pool (SWPP) | 138.8 GWh | Jun 2016 | Dec 2024 | Natural Gas |
| Stoneheart Solar, LLC | Stoneheart Solar, LLC | Saginaw, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Indeck Jonesboro Energy Center | Stored Solar J&WE | Jonesboro, ME | ISO New England (ISNE) | 16.0 MWh | Nov 1987 | Jun 2025 | Gaseous Propane : 66.7% Wood/Wood Waste Solids : 33.3% |
| Indeck West Enfield Energy Center | Stored Solar J&WE | West Enfield, ME | ISO New England (ISNE) | 50.6 GWh | Nov 1987 | Dec 2024 | Wood/Wood Waste Solids : 99.9% |
| Storey Bend Solar | Storey Bend Solar, LLC | Saint Cloud, FL | Duke Energy Florida, Inc. (FPC) | 187.2 GWh | Nov 2024 | Feb 2026 | Solar |
| Storey Solar and Storage | Storey Energy Center, LLC | Coolidge, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 299.6 GWh | Aug 2023 | Feb 2026 | Solar |
| South Texas Project | STP Nuclear Operating Co | Wadsworth, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 21.8 TWh | Jul 1988 | Feb 2026 | Nuclear |
| Straight Garden Solar | Straight Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2024 | Solar |
| Strandness Garden | Strandness Garden LLC | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
| Edison Farm | Strata Manager, LLC | Eden, NC | Duke Energy Carolinas (DUK) | 4.5 GWh | Oct 2022 | Dec 2024 | Solar |
| Overhill Solar | Strata Manager, LLC | Clinton, NC | Duke Energy Carolinas (DUK) | 10.9 GWh | Feb 2022 | Dec 2024 | Solar |
| Polk Farm | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | Feb 2022 | Dec 2024 | Solar |
| Selwyn Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | Feb 2022 | Dec 2024 | Solar |
| Shieldwall Solar | Strata Manager, LLC | Littleton, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Oct 2022 | Dec 2024 | Solar |
| Summit Solar | Strata Manager, LLC | Mount Olive, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Jul 2022 | Dec 2024 | Solar |
| Farrington Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | Mar 2012 | Dec 2024 | Solar |
| Arndt Farm | Strata Manager, LLC | Claremont, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Oct 2012 | Dec 2024 | Solar |
| Mocksville Farm | Strata Manager, LLC | Mocksville, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2012 | Dec 2024 | Solar |
| Chadbourn Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2012 | Dec 2024 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2013 | Dec 2024 | Solar |
| Shannon Farm | Strata Manager, LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Sep 2012 | Dec 2024 | Solar |
| Marshville Farm | Strata Manager, LLC | Marshville, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Sep 2013 | Dec 2024 | Solar |
| New Bern Farm | Strata Manager, LLC | Ernul, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Mar 2014 | Dec 2024 | Solar |
| Bolton Farm | Strata Manager, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Aug 2013 | Dec 2024 | Solar |
| McCallum Farm | Strata Manager, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Aug 2013 | Dec 2024 | Solar |
| Two Lines Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 8.7 GWh | Feb 2013 | Dec 2024 | Solar |
| Moore Solar Farm | Strata Manager, LLC | Reidsville, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Nov 2013 | Dec 2024 | Solar |
| Rock Farm | Strata Manager, LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Apr 2013 | Dec 2024 | Solar |
| Dibrell Farm | Strata Manager, LLC | Pelham, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Feb 2013 | Dec 2024 | Solar |
| Roxboro Farm | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Mar 2014 | Dec 2024 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Apr 2013 | Dec 2024 | Solar |
| Wilson Farm 1 | Strata Manager, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Fuquay Farm | Strata Manager, LLC | Middle Creek Township, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Haynes Farm | Strata Manager, LLC | Lincolnton, NC | Duke Energy Carolinas (DUK) | 7.2 GWh | Aug 2013 | Dec 2024 | Solar |
| Lenoir Farm 2 | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | May 2013 | Dec 2024 | Solar |
| Lenoir Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2013 | Dec 2024 | Solar |
| White Cross Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Aug 2013 | Dec 2024 | Solar |
| Bunn Level Farm, LLC | Strata Manager, LLC | Bunnlevel, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2016 | Dec 2024 | Solar |
| McGoogan Farm, LLC | Strata Manager, LLC | Lumber Bridge, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | Jul 2015 | Dec 2024 | Solar |
| Roper Farm, LLC | Strata Manager, LLC | Grover, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | May 2015 | Dec 2024 | Solar |
| Wadesboro Farm 1 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Feb 2015 | Dec 2024 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Spencer Farm, LLC | Strata Manager, LLC | Salisbury, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Mar 2017 | Dec 2024 | Solar |
| Hew Fulton Farm, LLC | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Nov 2015 | Dec 2024 | Solar |
| Tripple State Farm | Strata Manager, LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | Sep 2016 | Dec 2024 | Solar |
| Laurinburg Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Mills Anson Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2016 | Dec 2024 | Solar |
| Old Wire Farm | Strata Manager, LLC | Laurel Hill, NC | Duke Energy Progress East (CPLE) | 10.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Fisher Solar Farm - NC | Strata Manager, LLC | Oakboro, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Sep 2015 | Dec 2024 | Solar |
| Atkinson Farm Solar | Strata Manager, LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Sampson Solar | Strata Manager, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Jun 2015 | Dec 2024 | Solar |
| Deep Branch Farm | Strata Manager, LLC | Pembroke, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Dec 2016 | Dec 2024 | Solar |
| Kinston Davis Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Feb 2015 | Dec 2024 | Solar |
| Railroad Farm 2 | Strata Manager, LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Sep 2014 | Dec 2024 | Solar |
| Delco Farm | Strata Manager, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2016 | Dec 2024 | Solar |
| Stone Solar | Strata Manager, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Belafonte | Strata Manager, LLC | Calypso, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Truman (NC) | Strata Manager, LLC | Wendell, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Wedge | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.9 GWh | Mar 2021 | Dec 2024 | Solar |
| Kendall Farm | Strata Manager, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | May 2019 | Dec 2024 | Solar |
| Henry Farm | Strata Manager, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Gladstone Farm | Strata Manager, LLC | West End, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2019 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |