Green Power 2
2501 5th Ave South, Texas City, TX 77590Plant Summary Information
Green Power 2 is ranked #32 out of 814 power plants in Texas in terms of total annual net electricity generation.
Green Power 2 is comprised of 5 generators and generated 1.0 TWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Green Power 2 |
|---|---|
| Utility Name | South Houston Green Power LLC |
| Location | Galveston County, TX |
| Initial Operation Date | December 2003 |
| Last Update | Mar 2026 |
| Annual Generation | 3.9 TWh |
| Annual Consumption | 50.4 M MMBtu |
| Ranked #291 out of 12,332 Power Plants Nationwide | |
| Ranked #152 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #32 out of 814 Texas Power Plants | |
| Ranked #23 out of 308 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.4% Other Gas : 0.6% |
| Previous Operator |
South Houston Green Power LP (2013 to 2014) South Houston Green Power LLC (2015 to 2024) |
Map of Green Power 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Power 2.
Monthly Net Generation for Green Power 2
Monthly Plant Fuel Consumption for Green Power 2
Green Power 2 Details
| Summary Information | |
|---|---|
| Plant Name | Green Power 2 (55470) |
| Plant Address | 2501 5th Ave South, Texas City, TX 77590 |
| Utility | South Houston Green Power LLC (17566) |
| Latitude, Longitude | 29.3781, -94.93277 |
| Generation Dates on File | Jan 2003 to Mar 2026 |
| Initial Operation Date | December 2003 |
| Annual Generation | 3.9 TWh |
| Fuel Types | Natural Gas : 99.4% Other Gas : 0.6% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 03-154-002 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Petroleum Refineries (32411) |
| Sector | Industrial CHP (7) |
| Water Source | Gulf Coast Water Authority |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Texas-New Mexico Power Co (40051) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator ST1 Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | AMOCOOIL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMOCOOIL |
| Nameplate Capacity | 110 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
| Minimum Load | 19 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2003 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TR1 Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | AMOCOOIL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMOCOOIL |
| Nameplate Capacity | 167 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158 MW |
| Winter Capacity | 165 MW |
| Minimum Load | 110 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2003 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TR2 Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | AMOCOOIL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMOCOOIL |
| Nameplate Capacity | 167 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158 MW |
| Winter Capacity | 165 MW |
| Minimum Load | 110 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2003 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TR3 Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | AMOCOOIL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMOCOOIL |
| Nameplate Capacity | 167 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158 MW |
| Winter Capacity | 165 MW |
| Minimum Load | 110 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2003 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST805 Details Out of Service May 2009
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | AMOCOOIL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | AMOCOOIL |
| Nameplate Capacity | 250 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
| Minimum Load | 25 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | May 2009 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Green Power 2 Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Marathon Petroleum Company LP | 539 South Main Street, Findlay, OH 45840 | Generator ST1 | 100.00% |
| Marathon Petroleum Company LP | 539 South Main Street, Findlay, OH 45840 | Generator ST805 | 100.00% |
| Marathon Petroleum Company LP | 539 South Main Street, Findlay, OH 45840 | Generator TR1 | 100.00% |
| Marathon Petroleum Company LP | 539 South Main Street, Findlay, OH 45840 | Generator TR2 | 100.00% |
| Marathon Petroleum Company LP | 539 South Main Street, Findlay, OH 45840 | Generator TR3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #142 | Northport | Northport, NY | 4.5 TWh |
| #143 | Harding Street | Indianapolis, IN | 4.0 TWh |
| #144 | Buck | Salisbury, NC | 4.0 TWh |
| #145 | Woodbridge Energy Center | Keasbey, NJ | 4.0 TWh |
| #146 | Dan River | Eden, NC | 4.0 TWh |
| #147 | Granite Ridge | Londonderry, NH | 4.0 TWh |
| #148 | Jack Fusco Energy Center | Thompsons, TX | 3.9 TWh |
| #149 | Dearborn Industrial Generation | Dearborn, MI | 4.1 TWh |
| #150 | Dell Power Station | Dell, AR | 3.9 TWh |
| #151 | Chattahoochee Energy Facility | Franklin, GA | 3.9 TWh |
| #153 | Redbud Power Plant | Luther, OK | 3.9 TWh |
| #154 | Quantum Choctaw Power LLC | Ackerman, MS | 3.9 TWh |
| #155 | Liberty Electric Power Plant | Eddystone, PA | 3.9 TWh |
| #156 | Jasper | Hardeeville, SC | 3.8 TWh |
| #157 | Mesquite Generating Station Block 2 | Arlington, AZ | 3.8 TWh |
| #158 | Ontelaunee Energy Center | Reading, PA | 3.8 TWh |
| #159 | Thad Hill Energy Center | Clifton, TX | 3.8 TWh |
| #160 | Sabine | Orange, TX | 3.8 TWh |
| #161 | Cherokee | Denver, CO | 3.7 TWh |
| #162 | Rhode Island State Energy Center | Johnston, RI | 3.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Power 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ascend Performance Materials Texas Inc. | Alvin, TX | 147.5 GWh | 18.7 mi |
| Bacliff | Bacliff, TX | 103.0 GWh | 8.5 mi |
| Bayou Cogen Plant | Pasadena, TX | 2.3 TWh | 18.2 mi |
| GCWA | Texas City, TX | 125.0 MWh | 1.3 mi |
| HEB00028 | League City, TX | 223.0 MWh | 11.5 mi |
| HEB00769 | Webster, TX | 177.0 MWh | 17.9 mi |
| NASA Johnson Space Center CHP | Houston, TX | 82.7 GWh | 15.8 mi |
| Power Island | Alvin, TX | 833.4 GWh | 18.9 mi |
| Power Station 4 | Texas City, TX | 401.4 GWh | 0.7 mi |
| Texas City Plant Union Carbide | Texas City, TX | 98.1 GWh | 0.8 mi |
| Texas City Power Plant | Texas City, TX | 1.7 TWh | 0.7 mi |
| Topaz Generating | Texas City, TX | 574.6 GWh | 4.3 mi |
| WAL1062 | Friendswood, TX | 237.0 MWh | 18.2 mi |
| WAL3298 | Kemah, TX | 209.0 MWh | 12 mi |
| WAL3510 | Pearland, TX | 218.0 MWh | 21.6 mi |
| WAL462 | Alvin, TX | 142.0 MWh | 18.2 mi |
| WAL504 | Galveston, TX | 247.0 MWh | 9.9 mi |
| WAL5116 | Deer Park, TX | 263.0 MWh | 22.1 mi |
| WAL529 | La Marque, TX | 163.0 MWh | 4.1 mi |
| WAL5388 | League City, TX | 128.0 MWh | 11.4 mi |