South Oaks Hospital
400 Sunrise Highway, Amityville, NY 11701Plant Summary Information
South Oaks Hospital is ranked #95 out of 111 natural gas power plants in New York in terms of total annual net electricity generation.
South Oaks Hospital is comprised of 5 generators and generated 1.6 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | South Oaks Hospital |
---|---|
Utility Name | South Oak Hospital |
Location | Suffolk County, NY |
Initial Operation Date | April 2008 |
Last Update | Dec 2024 |
Annual Generation | 6.8 GWh |
Annual Consumption | 96.7 k MMBtu |
Ranked #7,203 out of 12,288 Power Plants Nationwide | |
Ranked #1,677 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #423 out of 912 New York Power Plants | |
Ranked #95 out of 111 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of South Oaks Hospital
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for South Oaks Hospital.
Monthly Net Generation for South Oaks Hospital
South Oaks Hospital Details
Summary Information | |
---|---|
Plant Name | South Oaks Hospital (50136) |
Plant Address | 400 Sunrise Highway, Amityville, NY 11701 |
Utility | South Oak Hospital (17460) |
Latitude, Longitude | 40.6853, -73.4258 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | April 2008 |
Annual Generation | 6.8 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 88-396-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial CHP (5) |
Water Source | Suffolk County Water Auth |
Ash Impoundment | |
Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Natural Gas Storage | No |
Generator CG1 Details Operating April 2008
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CG2 Details Operating April 2008
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CG3 Details Operating April 2008
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CG4 Details Operating April 2008
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CG5 Details Operating April 2008
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
South Oaks Hospital Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1667 | Center Hybrid | Norwalk, CA | 7.2 GWh |
#1668 | Herrema Dairy | Fair Oaks, IN | 7.2 GWh |
#1669 | Hoag Hospital Cogen Plant | Newport Beach, CA | 7.0 GWh |
#1670 | Amherst College Co Gen | Amherst, MA | 6.9 GWh |
#1671 | Walter Scott Jr Energy Center | Council Bluffs, IA | 6.5 TWh |
#1672 | York County Resource Recovery | York, PA | 234.1 GWh |
#1673 | Simplot Phosphates | Rock Springs, WY | 100.4 GWh |
#1674 | CamChino Leasing LLC | Chino, CA | 6.9 GWh |
#1675 | Roseville Power Plant #2 | Rocklin, CA | 6.9 GWh |
#1676 | CalTech - Pasadena | Pasadena, CA | 6.8 GWh |
#1678 | Earl F Wisdom | Spencer, IA | 7.1 GWh |
#1679 | East 12th Street | Winfield, KS | 6.7 GWh |
#1680 | Kellogg's - San Jose | San Jose, CA | 6.6 GWh |
#1681 | POET Biorefining Lake Crystal | Lake Crystal, MN | 7.8 GWh |
#1682 | Wellington 1 | Wellington, KS | 6.5 GWh |
#1683 | AT&T - Hawthorne | Hawthorne, CA | 6.5 GWh |
#1684 | South Oak Creek | Oak Creek, WI | 2.2 TWh |
#1685 | AT&T - San Diego Trade Street | San Diego, CA | 6.4 GWh |
#1686 | Hanford Energy Park Peaker | Hanford, CA | 6.4 GWh |
#1687 | HEBHoustonDistributionCenter | Houston, TX | 6.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding South Oaks Hospital.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altice - Hicksville | Hicksville, NY | 16.0 GWh | 6.6 mi |
ATT Jericho | Huntington, NY | 8.3 GWh | 10.7 mi |
Bethpage Power Plant | Hicksville, NY | 594.8 GWh | 5.7 mi |
Bloom-Altice Fuel Cell | Bethpage,, NY | 14.4 GWh | 6.4 mi |
Brentwood | Long Island, NY | 37.4 GWh | 9.9 mi |
Brentwood Solar | Brentwood, NY | 687.0 MWh | 11.6 mi |
Cedar Creek PV | Seaford, NY | 2.8 GWh | 4.9 mi |
Charles P Keller | Rockville Centre, NY | 24.0 MWh | 11.4 mi |
Covanta Hempstead | Westbury, NY | 598.0 GWh | 9.4 mi |
Dennison | Hauppauge, NY | 1.6 GWh | 7.6 mi |
E F Barrett | Island Park, NY | 1.3 TWh | 12.6 mi |
Edgewood Energy LLC | Brentwood, NY | 39.9 GWh | 9.8 mi |
Equus Freeport Power | Village of Freeport, NY | 45.4 GWh | 8 mi |
Mount Sinai South Nassau Hospital | Oceanside, NY | 10.8 MWh | 10.9 mi |
North County | Hauppauge, NY | 1.1 GWh | 7.6 mi |
Pinelawn Power LLC | West Babylon, NY | 76.6 GWh | 4 mi |
Plant No 1 Freeport | Freeport, NY | 17.0 MWh | 9 mi |
Plant No 2 Freeport | Freeport, NY | 31.1 GWh | 8 mi |
Reworld Babylon Inc | West Babylon, NY | 126.7 GWh | 4 mi |
SL Babylon | West Babylon, NY | 13.6 GWh | 4.1 mi |