Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
GenConn Devon LLC | GenConn Devon LLC | Milford, CT | ISO New England (ISNE) | 2.3 GWh | May 2010 | Dec 2023 | Kerosene : 96.0% Natural Gas : 4.0% |
GenConn Middletown LLC | GenConn Middletown LLC | Middletown, CT | ISO New England (ISNE) | 3.5 GWh | May 2011 | Dec 2023 | Kerosene : 83.6% Natural Gas : 16.4% |
General Electric Aircraft Engines | General Electric Aircraft Engines | Lynn, MA | ISO New England (ISNE) | 2.3 GWh | Dec 1947 | Apr 2025 | Solar |
Wabtec U.S Rail, Grove City Engine Plant | General Electric Co | Grove City, PA | PJM Interconnection, LLC (PJM) | 5.7 GWh | May 1984 | Apr 2025 | Distillate Fuel Oil |
Wildflower Way Solar | Generate Capital | Bath, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Jun 2021 | Dec 2024 | Solar |
Sangolqui Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Aug 2021 | Dec 2024 | Solar |
West Creek Solar | Generate Capital | Newark Valley, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
Svenski Solar (Hybrid) | Generate Capital | Crawford, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Mar 2022 | Dec 2024 | Solar |
State Highway 17B Solar | Generate Capital | Bethel, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2021 | Dec 2024 | Solar |
Bantam Solar | Generate Capital | Saint Johnsville, NY | New York Independent System Operator (NYIS) | 9.5 GWh | Feb 2022 | Dec 2024 | Solar |
Wheatland 2A Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2021 | Dec 2024 | Solar |
Bogart Solar | Generate Capital | Palenville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2023 | Solar |
Davis Solar | Generate Capital | Goshen, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Apr 2023 | Dec 2024 | Solar |
Wheatland 2B Solar | Generate Capital | Scottsville, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Nov 2021 | Dec 2024 | Solar |
Brickchurch Solar | Generate Capital | North Rose, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Feb 2020 | Dec 2024 | Solar |
Donati Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Sep 2021 | Dec 2024 | Solar |
Cafferty Hill Solar | Generate Capital | Owego, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Feb 2022 | Dec 2024 | Solar |
County Route 84 Solar | Generate Capital | Troupsburg, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Nov 2021 | Dec 2024 | Solar |
Costanza Solar | Generate Capital | Westerlo, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2020 | Dec 2024 | Solar |
Genesee - CCR Solar | Generate Capital | Hilton, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Nov 2022 | Dec 2024 | Solar |
Bullitt Farm Solar | Generate Capital | Marcy, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Aug 2023 | Dec 2024 | Solar |
Canoga Solar | Generate Capital | Seneca Falls, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Jun 2021 | Dec 2024 | Solar |
McCarthy Solar | Generate Capital | Blooming Grove, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
State Route 14A Solar | Generate Capital | Benton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2021 | Dec 2024 | Solar |
Salt Point Solar (Hybrid) | Generate Capital | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Dec 2020 | Dec 2024 | Solar : 99.9% |
Henrietta Solar | Generate Capital | West Henrietta, NY | New York Independent System Operator (NYIS) | 7.5 GWh | Nov 2021 | Dec 2024 | Solar |
Finney Solar | Generate Capital | Fort Johnson, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Nov 2021 | Dec 2024 | Solar |
Reisender Solar | Generate Capital | Ellenville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2024 | Solar |
Landau Solar | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
Landau II Solar (Hybrid) | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2021 | Dec 2024 | Solar |
Lockenhurst Pond Solar | Generate Capital | Westtown, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Oct 2022 | Dec 2024 | Solar |
Dunkleman Solar | Generate Capital | Cattaraugus, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Dec 2022 | Dec 2024 | Solar |
Drinkwater Solar | Generate Capital | Saint Johnsville, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
Dubois Solar (Hybrid) | Generate Capital | Pine Bush, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2020 | Dec 2024 | Solar : 99.9% |
New Beginnings Solar | Generate Capital | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2019 | Dec 2023 | Solar |
NY70 Solar | Generate Capital | Hunt, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Oct 2021 | Dec 2024 | Solar |
Reid Solar | Generate Capital | Rome, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Mar 2021 | Dec 2024 | Solar |
Krumkill Road Solar North, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jul 2024 | Dec 2024 | Solar |
Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Dec 2023 | Dec 2024 | Solar |
Eddy | Generate Capital | Williamson, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Sep 2023 | Dec 2024 | Solar |
Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2024 | Dec 2024 | Solar |
Glen Mary 1 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Nov 2021 | Dec 2024 | Solar |
Glen Mary 2 | Generate Capital | Tioga, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2021 | Dec 2024 | Solar |
Barone | Generate Capital | Wurtsboro, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Mar 2024 | Dec 2024 | Solar |
Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Apr 2024 | Dec 2024 | Solar |
Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
Rivard 2 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
Ridgeway 1 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Oct 2023 | Dec 2024 | Solar |
Rivard 1 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2023 | Dec 2024 | Solar |
Janiak | Generate Capital | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Oct 2023 | Dec 2024 | Solar |
Ridgeway 2 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Nov 2023 | Dec 2024 | Solar |
Catskill | Generate Capital | Triangle, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2023 | Dec 2024 | Solar |
Yellow Mills Rd #3 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
Yellow Mills Rd #2 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2022 | Dec 2024 | Solar |
Burritt Rd Community Solar Farm | Generate Capital | Parma, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jan 2020 | Dec 2024 | Solar |
Telegraph Rd #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Nov 2021 | Dec 2024 | Solar |
Villa Roma Rd #1 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2020 | Dec 2024 | Solar |
Villa Roma Rd #2 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2020 | Dec 2024 | Solar |
Route 19 #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 8.6 GWh | May 2022 | Dec 2024 | Solar |
WaveSun Community Solar | Generate Capital | Waverly, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2017 | Dec 2024 | Solar |
MontSun Community Solar | Generate Capital | Montrose, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Nov 2017 | Dec 2024 | Solar |
Yellow Mills Rd #1 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
Pool Brook Rd Community Solar Farm | Generate Capital | Laurens, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Mar 2019 | Dec 2023 | Solar |
Sacket Lake Rd #1 Community Solar Farm | Generate Capital | Thompson, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Dec 2019 | Dec 2024 | Solar |
Kelly Bridge Road Community Solar Farm | Generate Capital | Liberty, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Dec 2019 | Dec 2024 | Solar |
Big Tree Community Solar Farm | Generate Capital | Wales, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2021 | Dec 2024 | Solar |
Route 19 #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.9 GWh | May 2022 | Dec 2024 | Solar |
Washington St Community Solar Farm #3 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Mar 2020 | Dec 2024 | Solar |
Telegraph Rd #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2021 | Dec 2024 | Solar |
Boas Rd #4 Community Solar Farm | Generate Capital | Mooers, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2020 | Dec 2024 | Solar |
Washington St Community Solar Farm #1 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jan 2020 | Dec 2024 | Solar |
Washington St Community Solar Farm #4 | Generate Capital | Ogden, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jan 2020 | Dec 2024 | Solar |
Generate Colchester Fuel Cells, LLC | Generate Colchester Fuel Cells, LLC | Colchester, CT | ISO New England (ISNE) | 76.7 GWh | Sep 2021 | Dec 2024 | Natural Gas |
Praxair | Generate ER-NG, LLC | Clute, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 14.0 MWh | Jul 2019 | Dec 2024 | Natural Gas |
RavenChem | Generate ER-NG, LLC | Baytown, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 48.0 MWh | Mar 2021 | Dec 2024 | Natural Gas |
FTBLID2 | Generate ER-NG, LLC | Sugarland, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 130.0 MWh | Oct 2021 | Dec 2024 | Natural Gas |
HEB00776 | Generate ER-NG, LLC | Katy, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 165.0 MWh | Nov 2022 | Dec 2024 | Natural Gas |
HEB00789 | Generate ER-NG, LLC | Frisco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 212.0 MWh | Jun 2022 | Dec 2024 | Natural Gas |
HEB00760 | Generate ER-NG, LLC | Manvel, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 115.0 MWh | Sep 2023 | Dec 2024 | Natural Gas |
HEB00055 | Generate ER-NG, LLC | Southlake, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 211.0 MWh | Oct 2023 | Dec 2024 | Natural Gas |
HEB00779 | Generate ER-NG, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 17.0 MWh | Mar 2024 | Dec 2024 | Natural Gas |
OTHERBenEKDallas | Generate ER-NG, LLC | Dallas, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 198.0 MWh | Apr 2023 | Dec 2024 | Natural Gas |
HEB00797 | Generate ER-NG, LLC | Katy, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 71.0 MWh | Nov 2024 | Dec 2024 | Natural Gas |
AbbVie Waco | Generate ER-NG, LLC | Waco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 811.0 MWh | Oct 2023 | Dec 2024 | Natural Gas |
HEB00796 | Generate ER-NG, LLC | Allen, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 156.0 MWh | Feb 2023 | Dec 2024 | Natural Gas |
HEB00790 | Generate ER-NG, LLC | Plano, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 980.0 kWh | Aug 2022 | Dec 2024 | Natural Gas |
HEB00767 | Generate ER-NG, LLC | Magnolia, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 165.0 MWh | Jun 2022 | Dec 2024 | Natural Gas |
HEB00794 | Generate ER-NG, LLC | McKinney, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 89.0 MWh | Apr 2023 | Dec 2024 | Natural Gas |
HEB00798 | Generate ER-NG, LLC | Humble, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 136.0 MWh | Jun 2024 | Dec 2024 | Natural Gas |
HEB00801 | Generate ER-NG, LLC | Fort Worth, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 146.0 MWh | Apr 2024 | Dec 2024 | Natural Gas |
HEB00750 | Generate ER-NG, LLC | Mansfield, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 136.0 MWh | May 2024 | Dec 2024 | Natural Gas |
Fremont Community Digester, LLC | Generate Fremont Digester, LLC. | Newaygo, MI | Midcontinent Independent System Operator, Inc. (MISO) | 375.0 MWh | Nov 2012 | Dec 2024 | Other Biomass Gas |
New Haven Harbor | Generation Bridge II Connecticut, LLC | New Haven, CT | ISO New England (ISNE) | 45.2 GWh | Jun 1975 | Apr 2025 | Natural Gas : 53.3% Residual Fuel Oil : 33.4% Kerosene : 11.4% Distillate Fuel Oil : 1.9% |
Bridgeport Station | Generation Bridge II Connecticut, LLC | Bridgeport, CT | ISO New England (ISNE) | 3.6 TWh | Jul 1961 | Apr 2025 | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
Genesis Alkali | Genesis Alkali, LLC | Green River, WY | PacifiCorp East (PACE) | 259.5 GWh | May 1953 | Dec 2024 | Subbituminous Coal : 68.7% Natural Gas : 31.3% |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 644.3 GWh | Oct 2013 | Apr 2025 | Solar |
Jack McDonough | Georgia Power Co | Smyrna, GA | Southern Company Services, Inc. - Trans (SOCO) | 17.2 TWh | Apr 1971 | Apr 2025 | Natural Gas |
Vogtle | Georgia Power Co | Waynesboro, GA | Southern Company Services, Inc. - Trans (SOCO) | 35.3 TWh | Apr 1987 | Apr 2025 | Nuclear |
Summary of Power Plants By State
Figures are based on April 2025 generation numbers.State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,243.20 GWh |
Alaska | # 48 | 142 | 476.79 GWh |
Arizona | # 15 | 173 | 7,447.02 GWh |
Arkansas | # 31 | 99 | 3,937.58 GWh |
California | # 4 | 1,664 | 15,684.45 GWh |
Colorado | # 28 | 290 | 4,479.29 GWh |
Connecticut | # 37 | 162 | 2,832.47 GWh |
Delaware | # 49 | 32 | 450.59 GWh |
District of Columbia | # 51 | 16 | 13.07 GWh |
Florida | # 2 | 317 | 20,430.69 GWh |
Georgia | # 6 | 248 | 11,378.75 GWh |
Hawaii | # 46 | 68 | 750.53 GWh |
Idaho | # 44 | 145 | 1,489.98 GWh |
Illinois | # 5 | 358 | 14,828.23 GWh |
Indiana | # 14 | 208 | 7,809.31 GWh |
Iowa | # 19 | 294 | 6,020.16 GWh |
Kansas | # 21 | 180 | 5,162.37 GWh |
Kentucky | # 25 | 57 | 4,785.23 GWh |
Louisiana | # 16 | 83 | 7,414.75 GWh |
Maine | # 45 | 208 | 1,052.11 GWh |
Maryland | # 36 | 196 | 3,016.71 GWh |
Massachusetts | # 43 | 623 | 1,491.61 GWh |
Michigan | # 9 | 269 | 9,486.98 GWh |
Minnesota | # 27 | 765 | 4,502.46 GWh |
Mississippi | # 20 | 56 | 5,727.48 GWh |
Missouri | # 23 | 120 | 5,119.33 GWh |
State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,029.46 GWh |
Nebraska | # 38 | 127 | 2,575.70 GWh |
Nevada | # 33 | 110 | 3,434.99 GWh |
New Hampshire | # 42 | 56 | 1,516.23 GWh |
New Jersey | # 22 | 385 | 5,160.42 GWh |
New Mexico | # 32 | 139 | 3,447.34 GWh |
New York | # 8 | 930 | 9,830.59 GWh |
North Carolina | # 10 | 909 | 9,044.94 GWh |
North Dakota | # 35 | 57 | 3,134.93 GWh |
Ohio | # 12 | 197 | 8,321.20 GWh |
Oklahoma | # 18 | 136 | 6,341.82 GWh |
Oregon | # 24 | 272 | 4,888.92 GWh |
Pennsylvania | # 3 | 255 | 17,282.62 GWh |
Rhode Island | # 47 | 97 | 690.36 GWh |
South Carolina | # 11 | 200 | 8,436.34 GWh |
South Dakota | # 41 | 52 | 1,909.63 GWh |
Tennessee | # 26 | 86 | 4,565.37 GWh |
Texas | # 1 | 885 | 43,683.73 GWh |
Utah | # 39 | 122 | 2,192.68 GWh |
Vermont | # 50 | 117 | 200.11 GWh |
Virginia | # 17 | 233 | 6,991.48 GWh |
Washington | # 13 | 134 | 8,268.23 GWh |
West Virginia | # 30 | 39 | 3,969.31 GWh |
Wisconsin | # 29 | 244 | 4,163.43 GWh |
Wyoming | # 34 | 73 | 3,236.34 GWh |