John S Rainey
2900 Opry House Road, Starr, SC 29684Plant Summary Information
John S Rainey is ranked #8 out of 192 power plants in South Carolina in terms of total annual net electricity generation.
John S Rainey is comprised of 8 generators and generated 1.1 TWh during the 3-month period between January 2025 to April 2025.
Plant Name | John S Rainey |
---|---|
Utility Name | South Carolina Public Service Authority |
Location | Anderson County, SC |
Initial Operation Date | September 2001 |
Last Update | Apr 2025 |
Annual Generation | 4.6 TWh |
Annual Consumption | 38.9 M MMBtu |
Ranked #246 out of 12,299 Power Plants Nationwide | |
Ranked #125 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #8 out of 192 South Carolina Power Plants | |
Ranked #3 out of 26 South Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of John S Rainey
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for John S Rainey.
Monthly Net Generation for John S Rainey
John S Rainey Details
Summary Information | |
---|---|
Plant Name | John S Rainey (7834) |
Plant Address | 2900 Opry House Road, Starr, SC 29684 |
Utility | South Carolina Public Service Authority (17543) |
Latitude, Longitude | 34.34773, -82.77448 |
Generation Dates on File | Jan 2002 to Apr 2025 |
Initial Operation Date | September 2001 |
Annual Generation | 4.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Richard B Russell |
Ash Impoundment | No |
Transmission / Distribution Owner | South Carolina Public Service Authority (17543) SC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CT1A Details Operating September 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 175.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 170 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Planned Net Summer Capacity Uprate | 18 MW |
Planned Net Winter Capacity Uprate | 18 MW |
Planned Uprate | May 2027 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT1B Details Operating September 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 175.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 170 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2001 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Planned Net Summer Capacity Uprate | 18 MW |
Planned Net Winter Capacity Uprate | 18 MW |
Planned Uprate | May 2027 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1S Details Operating September 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 194.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 160 MW |
Winter Capacity | 180 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT2A Details Operating March 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 146 MW |
Winter Capacity | 180 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT2B Details Operating May 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 146 MW |
Winter Capacity | 180 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT3A Details Operating January 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 90 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2004 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 7 MW |
Planned Net Winter Capacity Uprate | 7 MW |
Planned Uprate | June 2026 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT3B Details Operating January 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 90 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2004 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 7 MW |
Planned Net Winter Capacity Uprate | 7 MW |
Planned Uprate | June 2026 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT4A Details Operating January 2004
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 75 MW |
Winter Capacity | 90 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 7 MW |
Planned Net Winter Capacity Uprate | 7 MW |
Planned Uprate | June 2026 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
John S Rainey Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#115 | Jasper | Hardeeville, SC | 4.8 TWh |
#116 | Morgan Energy Center | Decatur, AL | 4.8 TWh |
#117 | Potomac Energy Center, LLC | Leesburg, VA | 4.7 TWh |
#118 | Taft Cogeneration Facility | Hahnville, LA | 4.8 TWh |
#119 | Batesville Generation Facility | Batesville, MS | 4.7 TWh |
#120 | Quantum Choctaw Power LLC | Ackerman, MS | 4.6 TWh |
#121 | Dan River | Eden, NC | 4.6 TWh |
#122 | West Riverside Energy Center | Beloit, WI | 4.6 TWh |
#123 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.6 TWh |
#124 | John Sevier | Rogersville, TN | 4.6 TWh |
#126 | Fayette Energy Facility | Masontown, PA | 4.6 TWh |
#127 | PSEG Linden Generating Station | Linden, NJ | 4.5 TWh |
#128 | Dearborn Industrial Generation | Dearborn, MI | 5.3 TWh |
#129 | Victor J Daniel Jr | Escatawpa, MS | 6.0 TWh |
#130 | Hermiston Power Partnership | Hermiston, OR | 4.4 TWh |
#131 | Lowman Energy Center | Leroy, AL | 4.4 TWh |
#132 | Tenaska Frontier Generation Station | Shiro, TX | 4.3 TWh |
#133 | Sugar Creek Power | West Terre Haute, IN | 4.3 TWh |
#134 | Dresden Energy Facility | Dresden, OH | 4.3 TWh |
#135 | Rowan | Salisbury, NC | 4.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding John S Rainey.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams | Piedmont, SC | 4.8 GWh | 27.8 mi |
Anderson (SC) | Anderson, SC | 3.9 GWh | 11.5 mi |
Bluebird Solar SC LLC | Pendleton, SC | 5.6 GWh | 17.5 mi |
Central Energy Facility | Clemson, SC | 2.0 MWh | 23.2 mi |
Comer Solar | Comer, GA | 3.5 GWh | 27.4 mi |
Duke Energy CHP at Clemson University | Clemson, SC | 95.0 GWh | 23 mi |
Franklin Milliken | Lavonia, GA | 6.5 GWh | 19.6 mi |
Hartwell Energy Facility | Hartwell, GA | 174.9 GWh | 2.7 mi |
Hartwell Lake | Hartwell, GA | 422.6 GWh | 2.8 mi |
Hollidays Bridge Hydro | Honea Path, SC | 9.7 GWh | 25.9 mi |
Honea Path | Honea Path, SC | 87.0 MWh | 24.2 mi |
Pelzer Lower | Williamston, SC | 4.7 GWh | 26.3 mi |
Pelzer Solar I | Pelzer, SC | 2.0 GWh | 26.4 mi |
Pelzer Upper | Petzer, SC | 4.7 GWh | 27.3 mi |
Richard B Russell | Elberton, GA | 270.5 GWh | 24.5 mi |
Rocky River (SC) | Iva, SC | 6.1 GWh | 11.3 mi |
Seneca City of | Seneca, SC | 479.0 MWh | 25.6 mi |
Sonny Solar LLC | Elberton, GA | 87.7 GWh | 20.6 mi |
Valenite | Westminster, SC | 50.0 MWh | 26.1 mi |
W S Lee | Williamston, SC | 6.0 TWh | 26.1 mi |