Pearsall
2393 County Road 1005, Pearsall, TX 78061Plant Summary Information
Pearsall is ranked #103 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
Pearsall is comprised of 24 generators and generated 103.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Pearsall |
|---|---|
| Utility Name | South Texas Electric Coop, Inc |
| Location | Frio County, TX |
| Initial Operation Date | May 1961 |
| Last Update | Dec 2025 |
| Annual Generation | 453.9 GWh |
| Annual Consumption | 4.3 M MMBtu |
| Ranked #1,472 out of 13,081 Power Plants Nationwide | |
| Ranked #576 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #306 out of 852 Texas Power Plants | |
| Ranked #103 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Pearsall
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pearsall.
Monthly Net Generation for Pearsall
Monthly Plant Fuel Consumption for Pearsall
Pearsall Details
| Summary Information | |
|---|---|
| Plant Name | Pearsall (3630) |
| Plant Address | 2393 County Road 1005, Pearsall, TX 78061 |
| Utility | South Texas Electric Coop, Inc (17583) |
| Latitude, Longitude | 28.9275, -99.0919 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | May 1961 |
| Annual Generation | 453.9 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | South Texas Electric Coop, Inc (17583) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | Other - Please explain in pipeline notes below. |
| Pipeline Notes | Connected to ~52 mile "LaSalle Pipeline" owned and operated by Kinder Morgan Tejas Pipeline LLC |
| Natural Gas Storage | No |
Generator 10A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 11A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 12A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 13A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 14A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 15A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 16A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 18A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 1A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 5A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 6A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 7A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 8A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 9A Details Operating March 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 17A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 19A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 20A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 21A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 22A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 23A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 24A Details Operating April 2010
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | PEARSA_1_24 |
| Nameplate Capacity | 8.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 8.4 MW |
| Winter Capacity | 8.4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Pearsall Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #566 | Wabash Valley Power IGCC | Terre Haute, IN | 481.9 GWh |
| #567 | Lansing BWL REO Town Plant | Lansing, MI | 477.2 GWh |
| #568 | Cheyenne Prairie Generating Station | Cheyenne, WY | 475.3 GWh |
| #569 | South Belridge Cogeneration Facility | McKittrick, CA | 473.9 GWh |
| #570 | Mustang | Oklahoma City, OK | 477.0 GWh |
| #571 | Thomas Fitzhugh | Ozark, AR | 472.3 GWh |
| #572 | Zion Energy Center | Zion, IL | 468.2 GWh |
| #573 | Frontier | Oklahoma City, OK | 462.0 GWh |
| #574 | International Paper Riverdale Mill | Selma, AL | 552.2 GWh |
| #575 | Turtle Creek | Springfield, NE | 464.6 GWh |
| #577 | Sheboygan Falls | Sheboygan, WI | 452.5 GWh |
| #578 | Woodsdale | Trenton, OH | 463.4 GWh |
| #579 | Mansfield Mill | Mansfield, LA | 855.5 GWh |
| #580 | North Valmy | Valmy, NV | 1.3 TWh |
| #581 | Nikiski Combined Cycle | Nikiski, AK | 445.0 GWh |
| #582 | Masspower | Indian Orchard, MA | 441.7 GWh |
| #583 | Whitewater Generating Station | Whitewater, WI | 441.5 GWh |
| #584 | Blue Lake | Shakopee, MN | 434.8 GWh |
| #585 | Remy Jade Power Station | Crosby, TX | 433.6 GWh |
| #586 | Trinidad (TX) | Trinidad, TX | 431.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pearsall.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AP Sunray LLC | Knippa, TX | 409.3 GWh | 40.3 mi |
| Arthur Von Rosenberg | Elmendorf, TX | 3.4 TWh | 48.4 mi |
| Blue Wing Solar Energy Generation | San Antonio, TX | 19.5 GWh | 49.2 mi |
| Commerce Solar | San Antonio, TX | 9.3 GWh | 45.2 mi |
| Elara Solar | Pearsall, TX | 263.5 GWh | 6.1 mi |
| HEB_CPS00085 | San Antonio, TX | 329.0 MWh | 42.1 mi |
| Horizon Solar | Pearsall, TX | 457.7 GWh | 1.2 mi |
| J K Spruce | San Antonio, TX | 6.2 TWh | 53.5 mi |
| Leon Creek | San Antonio, TX | 385.7 GWh | 42.8 mi |
| Morrow Lake Solar | Pearsall, TX | 176.0 GWh | 2.1 mi |
| Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.8 GWh | 38.1 mi |
| O W Sommers | San Antonio, TX | 2.3 TWh | 53.3 mi |
| OCI Alamo 5 LLC | Uvalde, TX | 159.1 GWh | 42.7 mi |
| OCI Alamo Solar I Hybrid | San Antonio, TX | 77.8 GWh | 45.7 mi |
| San Miguel | Christine, TX | 1.4 TWh | 40.3 mi |
| Shakes Solar | Carrizo Springs, TX | 387.1 GWh | 52.4 mi |
| SunE CPS1 LLC | San Antonio, TX | 4.5 GWh | 46.2 mi |
| SunE CPS2 LLC | San Antonio, TX | 7.0 GWh | 46.2 mi |
| SunE CPS3 LLC | Somerset, TX | 7.2 GWh | 32.6 mi |
| V H Braunig | Elmendorf, TX | 281.9 GWh | 48.5 mi |