Cairo Solar Farm, LLC
Highway 21, Cairo, GA 39827Plant Summary Information
Cairo Solar Farm, LLC is ranked #119 out of 150 solar farms in Georgia in terms of total annual net electricity generation.
Cairo Solar Farm, LLC generated 707.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cairo Solar Farm, LLC |
---|---|
Utility Name | Southeastern Solar Farm Fund, LLC |
Location | Grady County, GA |
Initial Operation Date | June 2017 |
Last Update | Dec 2024 |
Annual Generation | 3.3 GWh |
Annual Consumption | 12.1 k MMBtu |
Ranked #9,046 out of 12,288 Power Plants Nationwide | |
Ranked #4,009 out of 6,174 Solar Power Plants Nationwide | |
Ranked #205 out of 246 Georgia Power Plants | |
Ranked #119 out of 150 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Cairo Solar Farm, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cairo Solar Farm, LLC.
Monthly Net Generation for Cairo Solar Farm, LLC
Cairo Solar Farm, LLC Details
Summary Information | |
---|---|
Plant Name | Cairo Solar Farm, LLC (66199) |
Plant Address | Highway 21, Cairo, GA 39827 |
Utility | Southeastern Solar Farm Fund, LLC (65327) |
Latitude, Longitude | 30.91129, -84.22888 |
Generation Dates on File | Jan 2022 to Dec 2024 |
Initial Operation Date | June 2017 |
Annual Generation | 3.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Grady Electric Membership Corp (7450) GA |
Grid Voltage | 29.14 kV / 14.40 kV |
Energy Storage | No |
Generator CAIRO Details Operating June 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cairo Solar Farm, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3999 | Monson Solar, LLC | Monson, MA | 3.3 GWh |
#4000 | PowerFin Kingsbery | Austin, TX | 3.3 GWh |
#4001 | Oak Hill Solar Array | Evansville, IN | 3.3 GWh |
#4002 | Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh |
#4003 | Lafayette Solar I, LLC | Shelby, NC | 3.3 GWh |
#4004 | Mesa CSG 2 Massicotte | Palisade, CO | 3.3 GWh |
#4005 | Deer Creek PV | Marion, IN | 3.3 GWh |
#4006 | BlackRock-Matrix | South Brunswick, NJ | 3.3 GWh |
#4007 | Chester CSG | Chester, NY | 3.3 GWh |
#4008 | SR Jackson II | Jackson, TN | 3.3 GWh |
#4010 | Landau Solar | Kingston, NY | 3.3 GWh |
#4011 | Westmont 400A | Los Angeles, CA | 3.3 GWh |
#4012 | CDCR (CA) - Wasco State Prison | Wasco, CA | 3.3 GWh |
#4013 | Limelight Solar I, LLC | Spartanburg, SC | 3.3 GWh |
#4014 | Bogart Solar | Palenville, NY | 3.3 GWh |
#4015 | City of Havre De Grace C | Perryman, MD | 3.3 GWh |
#4016 | ELP Saugerties CSG | Saugerties, NY | 3.3 GWh |
#4017 | Bond Solar | Summerton, SC | 3.3 GWh |
#4018 | Rail Trail | Great Barrington, MA | 3.3 GWh |
#4019 | Kelly Bridge Road Community Solar Farm | Liberty, NY | 3.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cairo Solar Farm, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arvah B Hopkins | Tallahassee, FL | 1.8 TWh | 33.3 mi |
Baconton Power Plant | Baconton, GA | 74.0 GWh | 34 mi |
Bainbridge Solar | Bainbridge, GA | 1.9 GWh | 23.8 mi |
BE Solar LLC | Atlanta, GA | 5.8 GWh | 18.9 mi |
Camilla Solar Energy Project | Camilla, GA | 353.8 GWh | 24.8 mi |
Camilla Solar Plant | Pelham, GA | 26.2 GWh | 19.7 mi |
Cool Springs Solar (Hybrid) | Bainbridge, GA | 504.6 GWh | 29.1 mi |
Decatur County Solar Project | Bainbridge, GA | 42.2 GWh | 23.8 mi |
Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh | 24.6 mi |
Decatur Solar | Climax, GA | 165.9 GWh | 13.4 mi |
Gadsden County Solar | Chattahoochee, FL | 62.3 GWh | 34.3 mi |
Hickory Park Solar Hybrid | Camilla, GA | 430.7 GWh | 25 mi |
OE_GA3 | Camilla, GA | 123.1 GWh | 20.3 mi |
Oil Dri 2 Solar | Ochlocknee, GA | 2.9 GWh | 11.1 mi |
Quitman II Solar | Quitman, GA | 307.1 GWh | 34.4 mi |
Quitman Solar | Quitman, GA | 324.5 GWh | 35 mi |
Sowega Power | Baconton, GA | 53.2 GWh | 34 mi |
Sub 12 | Tallahassee, FL | 28.6 GWh | 31.2 mi |
Walton Bainbridge Power Facility | Bainbridge, GA | 138.0 MWh | 18.9 mi |
Wild Azalea Solar Energy Center | Chattahoochee, FL | 170.0 GWh | 34.4 mi |