Border Hybrid Energy Center is ranked #165 out of 342 natural gas power plants in California in terms of total annual net electricity generation.
Border Hybrid Energy Center is comprised of 1 generator and generated 4.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Border Hybrid Energy Center |
|---|---|
| Utility Name | CalPeak Power, LLC |
| Location | San Diego County, CA |
| Initial Operation Date | November 2001 |
| Last Update | Dec 2024 |
| Annual Generation | 14.8 GWh |
| Annual Consumption | 165.8 k MMBtu |
| Ranked #5,615 out of 12,539 Power Plants Nationwide | |
| Ranked #1,457 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #764 out of 1,600 California Power Plants | |
| Ranked #165 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
CalPeak Power - Border LLC (2013 to 2013) Calpeak Operating Services, LLC (2014 to 2018) CalPeak Power, LLC (2019 to 2024) |
Map of Border Hybrid Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Border Hybrid Energy Center.
Monthly Net Generation for Border Hybrid Energy Center
Border Hybrid Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Border Hybrid Energy Center (55510) |
| Plant Address | 2060 Sanyo Avenue, San Diego, CA 92154 |
| Utility | CalPeak Power, LLC (59527) |
| Latitude, Longitude | 32.56245, -116.94387 |
| Generation Dates on File | Feb 2002 to Dec 2024 |
| Initial Operation Date | November 2001 |
| Annual Generation | 14.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG01-254 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
| Natural Gas Storage | No |
Generator CPP4 Details Operating November 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | BORDER_6_UNITA1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BORDER_6_UNITA1 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 51.3 MW |
| Minimum Load | 21 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2001 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Border Hybrid Energy Center Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| CalPeak Power - Border LLC | 4350 Executive Drive, Suite 320, San Diego, CA 92121 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1447 | Pepperidge Farm Bloomfield | Bloomfield, CT | 15.5 GWh |
| #1448 | Plant No 2 Orange County | Huntington Beach, CA | 59.3 GWh |
| #1449 | Santa Clara Cogen | Santa Clara, CA | 15.3 GWh |
| #1450 | Valero Refinery Corpus Christi West | Corpus Christi, TX | 85.5 GWh |
| #1451 | Chicago West Side Energy Center | Chicago, IL | 15.2 GWh |
| #1452 | Clay Boswell | Cohasset, MN | 5.6 TWh |
| #1453 | Interstate Paper LLC Riceboro | Riceboro, GA | 94.3 GWh |
| #1454 | Poet Bioprocessing Emmetsburg | Emmetsburg, IA | 18.0 GWh |
| #1455 | Equinix - Billerica | Billerica, MA | 15.0 GWh |
| #1456 | Double C Generation Limited Partnership | Bakersfield, CA | 14.9 GWh |
| #1458 | Loyola University Health Plant | Maywood, IL | 14.8 GWh |
| #1459 | Snowbird Power Plant | Snowbird, UT | 14.7 GWh |
| #1460 | Yale New Haven - New London | New London, CT | 14.6 GWh |
| #1461 | Montville Station | Uncasville, CT | 27.8 GWh |
| #1462 | Broadridge Cogen | El Dorado Hills, CA | 15.8 GWh |
| #1463 | Pawnee | Brush, CO | 1.6 TWh |
| #1464 | Pine Street | Sebewaing, MI | 14.3 GWh |
| #1465 | POET Biorefining Caro, LLC | Caro, MI | 14.3 GWh |
| #1466 | Boston Medical Center CHP Plant | Boston, MA | 14.2 GWh |
| #1467 | Conemaugh | New Florence, PA | 4.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Border Hybrid Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon SAN3 Solar Project | San Diego, CA | 6.1 GWh | 0.7 mi |
| Chula Vista Energy Center | Chula Vista, CA | 1.8 GWh | 7 mi |
| County of San Diego SBRC | Chula Vista, CA | 2.3 GWh | 9.2 mi |
| CP Kelco San Diego Plant | San Diego, CA | 71.3 GWh | 14.8 mi |
| Cuyamaca Peak Energy Plant | El Cajon, CA | 5.9 GWh | 16.3 mi |
| El Cajon Energy Center | El Cajon, CA | 9.0 GWh | 16.2 mi |
| Grossmont College | El Cajon, CA | 4.4 GWh | 17.9 mi |
| Grossmont Hospital | La Mesa, CA | 25.5 GWh | 15.4 mi |
| Grossmont HS Solar Project | El Cajon, CA | 1.8 GWh | 17.9 mi |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | El Cajon, CA | 2.8 GWh | 12.7 mi |
| ISH Solar Hospital SDMC | San Diego, CA | 1.2 GWh | 18.1 mi |
| Larkspur Energy Facility | San Diego, CA | 24.4 GWh | 0.3 mi |
| Lindberg Field Solar 2 | San Diego, CA | 1.7 GWh | 19.1 mi |
| Naval Hospital Medical Center | San Diego, CA | 16.2 GWh | 16.3 mi |
| Otay Mesa Generating Project | San Diego, CA | 1.8 TWh | 2.1 mi |
| PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.0 GWh | 14.2 mi |
| Pio Pico Energy Center | San Diego, CA | 65.9 GWh | 1.7 mi |
| San Diego - EMDF at San Diego | San Diego, CA | 4.7 GWh | 2.4 mi |
| San Diego State University | San Diego, CA | 52.4 GWh | 16.6 mi |
| SeaWorld Aquatica | Chula Vista, CA | 1.9 GWh | 3.9 mi |