Los Esteros Critical Energy Center
800 Thomas Foon Chew Way, San Jose, CA 95134Plant Summary Information
Los Esteros Critical Energy Center is ranked #58 out of 314 natural gas power plants in California in terms of total annual net electricity generation.
Los Esteros Critical Energy Center is comprised of 5 generators and generated 32.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Los Esteros Critical Energy Center |
|---|---|
| Utility Name | Los Esteros Critical Energy Facility LLC |
| Location | Santa Clara County, CA |
| Initial Operation Date | February 2003 |
| Last Update | Mar 2026 |
| Annual Generation | 144.5 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #2,969 out of 12,332 Power Plants Nationwide | |
| Ranked #812 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #301 out of 1,530 California Power Plants | |
| Ranked #58 out of 314 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Los Esteros Critical Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Los Esteros Critical Energy Center.
Monthly Net Generation for Los Esteros Critical Energy Center
Monthly Plant Fuel Consumption for Los Esteros Critical Energy Center
Los Esteros Critical Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Los Esteros Critical Energy Center (55748) |
| Plant Address | 800 Thomas Foon Chew Way, San Jose, CA 95134 |
| Utility | Los Esteros Critical Energy Facility LLC (2860) |
| Latitude, Longitude | 37.425, -121.9319 |
| Generation Dates on File | Mar 2003 to Mar 2026 |
| Initial Operation Date | February 2003 |
| Annual Generation | 144.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 02-130-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator CTG1 Details Operating February 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 45 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 49 MW |
| Winter Capacity | 49 MW |
| Minimum Load | 28 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating February 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 45 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Minimum Load | 28 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating February 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 45 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 49 MW |
| Winter Capacity | 49 MW |
| Minimum Load | 28 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CTG4 Details Operating February 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 45 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Minimum Load | 28 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CAG5 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 126.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 108 MW |
| Winter Capacity | 108 MW |
| Minimum Load | 8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Los Esteros Critical Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #802 | Dansby | Bryan, TX | 149.9 GWh |
| #803 | Millcreek Power Generation | St. George, UT | 148.9 GWh |
| #804 | Georgia-Pacific Palatka Operations | Palatka, FL | 356.7 GWh |
| #805 | Ascend Performance Materials Texas Inc. | Alvin, TX | 147.5 GWh |
| #806 | Toray Plastic America's CHP Plant | North Kingstown, RI | 147.3 GWh |
| #807 | Gans | Gans, PA | 147.2 GWh |
| #808 | SJRR Power LLC | Houston, TX | 146.6 GWh |
| #809 | Audrain Generating Station | Vandalia, MO | 146.4 GWh |
| #810 | Wasson CO2 Removal Plant | Denver City, TX | 145.6 GWh |
| #811 | LEPA Unit No. 1 | Morgan City, LA | 144.7 GWh |
| #813 | Lederle Laboratories | Pearl River, NY | 145.5 GWh |
| #814 | Almond Power Plant | Modesto, CA | 143.4 GWh |
| #815 | Escanaba Mill | Escanaba, MI | 458.3 GWh |
| #816 | NIH Cogeneration Facility | Bethesda, MD | 142.8 GWh |
| #817 | Hamlet Generating Facility | Hamlet, NC | 144.9 GWh |
| #818 | PSEG Kearny Generating Station | Kearny, NJ | 141.1 GWh |
| #819 | Sycamore Cogeneration | Bakersfield, CA | 139.8 GWh |
| #820 | San Jacinto County Peaking Facility | Shepherd, TX | 139.6 GWh |
| #821 | Bayou Cove Peaking Power | Jennings, LA | 139.4 GWh |
| #822 | Berry Cogen Tanne Hills 18 | Maricopa, CA | 138.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Los Esteros Critical Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agnews Power Plant | San Jose, CA | 10.3 GWh | 1.4 mi |
| AT&T Holger | San Jose, CA | 1.3 GWh | 0.9 mi |
| CST001 McCarthy Fuel Cell | Milpitas, CA | 8.7 GWh | 1.6 mi |
| Delta Electronics Fremont | Fremont, CA | 616.0 MWh | 4.6 mi |
| Donald Von Raesfeld Power Plant | Santa Clara, CA | 813.7 GWh | 3.5 mi |
| Equinix Lundy Ave. Fuel Cell | San Jose, CA | 26.3 GWh | 3.5 mi |
| EQX011 Duane Fuel Cell | Santa Clara, CA | 22.5 GWh | 3.5 mi |
| FLEX Gibraltar | Milpitas, CA | 8.7 GWh | 2.1 mi |
| Fremont - Kato Rd | Fremont, CA | 2.3 GWh | 3.7 mi |
| Fremont CA AutoFactory | Fremont, CA | 480.0 MWh | 4.7 mi |
| Gianera | Santa Clara, CA | 6.2 GWh | 2.6 mi |
| Intel Santa Clara | Santa Clara, CA | 7.7 GWh | 3.3 mi |
| Life Technologies - Fremont | Fremont, CA | 10.0 GWh | 4.3 mi |
| Maxim | San Jose, CA | 6.0 GWh | 1.6 mi |
| Micro Santa Clara | San Jose, CA | 8.6 GWh | 3.7 mi |
| Mission College Blvd. Fuel Cell | Santa Clara, CA | 39.9 GWh | 3.2 mi |
| SC 1 Data Center, Phase 2 | Santa Clara, CA | 402.0 MWh | 4.4 mi |
| SJ/SC WPCP | San Jose, CA | 82.8 GWh | 1 mi |
| Sunnyvale City of WPCP | Sunnyvale, CA | 9.5 GWh | 4.6 mi |
| Zero Waste Energy Development Co LLC | San Jose, CA | 1.8 GWh | 1.3 mi |