Firestone Walker Brewery - Phase 1

1400 Ramada Drive, Paso Robles, CA 93446

Plant Summary Information

Firestone Walker Brewery - Phase 1 is ranked #535 out of 849 solar farms in California in terms of total annual net electricity generation.

Firestone Walker Brewery - Phase 1 generated 637.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameFirestone Walker Brewery - Phase 1
Utility NameSkyHigh 2 Solar
LocationSan Luis Obispo County, CA
Initial Operation DateNovember 2020
Last Update Dec 2024
Annual Generation 3.3 GWh
Annual Consumption 12.0 k MMBtu
Ranked #9,189 out of 12,539 Power Plants Nationwide
Ranked #4,132 out of 6,400 Solar Power Plants Nationwide
Ranked #1,233 out of 1,600 California Power Plants
Ranked #535 out of 849 California Solar Power Plants
Fuel Types Solar

Map of Firestone Walker Brewery - Phase 1

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Firestone Walker Brewery - Phase 1.

Create Your Account Today

Monthly Net Generation for Firestone Walker Brewery - Phase 1

Firestone Walker Brewery - Phase 1 Details

Summary Information
Plant NameFirestone Walker Brewery - Phase 1 (64391)
Plant Address1400 Ramada Drive, Paso Robles, CA 93446
UtilitySkyHigh 2 Solar (63432)
Latitude, Longitude35.59588, -120.69431
Generation Dates on FileNov 2020 to Dec 2024
Initial Operation DateNovember 2020
Annual Generation 3.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF20-1249-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator FWBP1 Details Operating November 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity2.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

Firestone Walker Brewery - Phase 1 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4122Town of Needham VNEM CSGNeedham, MA3.3 GWh
#4123Wappinger 9D SolarWappinger, NY3.3 GWh
#4124Lister Avenue SolarNewark, NJ3.3 GWh
#4125Expressway Solar C2Victorville, CA3.3 GWh
#4126EllerbeEllerbe, NC3.3 GWh
#4127Salt Point Solar (Hybrid)Poughkeepsie, NY3.3 GWh
#4128Nashville Farms, LLCNashville, NC3.3 GWh
#4129Monson Solar, LLCMonson, MA3.3 GWh
#4130PowerFin KingsberyAustin, TX3.3 GWh
#4131Oak Hill Solar ArrayEvansville, IN3.3 GWh
#4133Lafayette Solar I, LLCShelby, NC3.3 GWh
#4134Mesa CSG 2 MassicottePalisade, CO3.3 GWh
#4135Chester CSGChester, NY3.3 GWh
#4136BlackRock-MatrixSouth Brunswick, NJ3.3 GWh
#4137SR Jackson IIJackson, TN3.3 GWh
#4138Cairo Solar Farm, LLCCairo, GA3.3 GWh
#4139Landau SolarKingston, NY3.3 GWh
#4140Westmont 400ALos Angeles, CA3.3 GWh
#4141CDCR (CA) - Wasco State PrisonWasco, CA3.3 GWh
#4142Limelight Solar I, LLCSpartanburg, SC3.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Firestone Walker Brewery - Phase 1.

Plant NamePlant LocationAnnual GenerationDistance
Aera San Ardo Cogen FacilitySan Ardo, CA17.2 GWh26.4 mi
Atascadero State HospitalAtascadero, CA2.8 GWh9.8 mi
CA Flats Solar 130, LLCShandon, CA262.5 GWh16.3 mi
CA Flats Solar 150, LLCShandon, CA299.6 GWh16.3 mi
CA-DGS-California Men's ColonySan Luis Obispo, CA4.6 GWh18.7 mi
Camp San Luis ObispoSan Luis Obispo, CA158.0 MWh19 mi
CED AvenalAvenal, CA9.7 GWh41.1 mi
Coalinga 25D CogenCoalinga, CA42.3 GWh42.1 mi
Cold Canyon 1San Luis Obispo, CA3.8 GWh28.8 mi
Diablo CanyonAvila Beach, CA18.5 TWh28.1 mi
Meridian VineyardsPaso Robles, CA1.0 GWh8.8 mi
Nacimiento Hydro ProjectBradley, CA18.2 GWh17.6 mi
Paso Robles - Municipal AirportPaso Robles, CA6.0 GWh6.6 mi
Salinas River CogenerationSan Ardo, CA258.0 GWh26.4 mi
Sand Drag LLCAvenal, CA28.2 GWh42.3 mi
Stenner Creek SolarSan Luis Obispo, CA9.5 GWh19.1 mi
Sutter Home Winery TCCPaso Robles, CA1.1 GWh9.7 mi
Topaz Solar FarmSanta Margarita, CA1.0 TWh37.6 mi
Vintner SolarTempleton, CA4.2 GWh2.7 mi
Wonderful Orchards - West ValleyBlackwells Corner, CA1.4 GWh40.7 mi