| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 208.7 GWh | Nov 2016 | Sep 2025 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2014 | Dec 2024 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2024 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 231.0 GWh | Jul 2019 | Sep 2025 | Solar |
| Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2014 | Dec 2024 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2021 | Dec 2024 | Solar |
| Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2013 | Dec 2024 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Apr 2014 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 103.2 GWh | Nov 2016 | Sep 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2014 | Dec 2024 | Solar |
| J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2024 | Dec 2024 | Solar |
| Pastoria Energy Facility, LLC | Calpine Corp - Pastoria Energy Center | Lebec, CA | California Independent System Operator (CISO) | 3.9 TWh | Apr 2005 | Sep 2025 | Natural Gas |
| IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 929.0 MWh | Mar 2011 | Oct 2024 | Solar |
| Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 22.8 GWh | Apr 1924 | Dec 2024 | Water |
| Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 1911 | Dec 2024 | Water |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 42.2 GWh | Feb 1990 | Jun 2024 | Water |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2002 | Sep 2025 | Natural Gas |
| Electrolyte BESS | Henrietta BESS LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.0 GWh | - | Sep 2025 | Electricity used for energy storage |
| Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 2022 | Dec 2024 | Solar |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 14.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | May 2013 | Dec 2024 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 334.0 GWh | Nov 2020 | Sep 2025 | Solar |
| Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 679.2 GWh | Aug 2021 | Sep 2025 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 218.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 658.1 GWh | Nov 2023 | Sep 2025 | Solar |
| Chestnut | Castanea Project LLC | Lemoore, CA | California Independent System Operator (CISO) | 390.8 GWh | Nov 2023 | Sep 2025 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 44.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 406.5 GWh | Oct 2020 | Sep 2025 | Solar |
| RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
| Rio Bravo Rocklin | Rio Bravo Rocklin | Lincoln, CA | California Independent System Operator (CISO) | 155.2 GWh | May 1989 | Dec 2024 | Wood/Wood Waste Solids : 99.1% Natural Gas : 0.9% |
| Sierra Pacific Lincoln Facility | Sierra Pacific Industries | Lincoln, CA | California Independent System Operator (CISO) | 94.1 GWh | Feb 2004 | Dec 2024 | Wood/Wood Waste Solids |
| Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.4 GWh | Jul 2021 | Dec 2024 | Solar |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
| 2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2024 | Solar |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 247.4 GWh | Nov 2015 | Dec 2024 | Wind |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.2 GWh | Jan 2016 | Dec 2024 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 149.2 GWh | Oct 2017 | Sep 2025 | Wind |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 199.5 GWh | Jun 2021 | Sep 2025 | Wind |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 636.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| Diablo Winds LLC | Sequitur Renewables, LLC | Livermore, CA | California Independent System Operator (CISO) | 20.5 GWh | Nov 2004 | Dec 2024 | Wind |
| Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 38.9 GWh | Feb 1969 | Dec 2024 | Landfill Gas |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 877.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 673.4 GWh | Oct 2012 | Sep 2025 | Natural Gas |
| Bear Creek Solar (CA) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2024 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Lodi | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 2.8 GWh | Jan 1986 | Dec 2024 | Natural Gas |
| Combustion Turbine Project No 2 | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 9.6 GWh | Mar 1996 | Oct 2024 | Natural Gas |
| Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 63.0 GWh | Jan 1980 | Sep 2025 | Natural Gas |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 230.0 GWh | Nov 2023 | Sep 2025 | Wind |
| Cottonwood | Los Angeles Department of Water & Power | Lone Pine, CA | Los Angeles Department of Water and Power (LDWP) | 2.1 GWh | Oct 1908 | Dec 2024 | Water |
| Spring Gap | Pacific Gas & Electric Co. | Long Barn, CA | California Independent System Operator (CISO) | 29.8 GWh | Aug 1921 | Nov 2024 | Water |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 13.7 GWh | Jul 1976 | Dec 2023 | Waste Heat |
| Southeast Resource Recovery | SERRF Joint Powers Authority | Long Beach, CA | California Independent System Operator (CISO) | 89.9 GWh | Jun 1988 | Mar 2024 | Non-biogenic Municipal Solid Waste : 51.7% Biogenic Municipal Solid Waste : 42.3% Natural Gas : 6.1% |
| Long Beach Generation LLC | Long Beach Generation LLC | Long Beach, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1976 | Dec 2024 | Natural Gas |
| Haynes | Los Angeles Department of Water & Power | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 TWh | Aug 1962 | Sep 2025 | Natural Gas |
| THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 206.9 GWh | Dec 2002 | Sep 2025 | Natural Gas |
| AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 38.3 GWh | Aug 1956 | Aug 2025 | Natural Gas |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.9 TWh | Jan 2020 | Sep 2025 | Natural Gas |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| BCE Los Alamitos 2 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2023 | Dec 2023 | Solar |
| BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 19.1 GWh | Jul 2023 | Dec 2024 | Solar |
| DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2016 | Dec 2024 | Natural Gas |
| Big Bear | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.0 GWh | Nov 2020 | Aug 2024 | Solar |
| Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 19.1 GWh | May 2020 | Dec 2024 | Natural Gas |
| Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Jan 2013 | Dec 2024 | Solar |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 154.0 MWh | Mar 2005 | Oct 2024 | Solar |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 179.0 GWh | Sep 1993 | Sep 2025 | Natural Gas |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.6 GWh | Dec 1985 | Dec 2024 | Landfill Gas |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 32.4 GWh | Sep 2015 | Sep 2025 | Natural Gas |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Forever 21 Retail, Inc. | Los Angeles Department of Water & Power | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Jan 2015 | Dec 2024 | Solar |
| Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.6 GWh | Jul 2020 | Dec 2024 | Solar |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.5 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| Westmont 400A | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jun 2017 | Dec 2024 | Solar |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.6 GWh | Jun 2017 | Dec 2024 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |