Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.9 GWh | Jun 2016 | Dec 2025 | Solar |
| Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 38.9 GWh | Apr 2016 | Dec 2025 | Solar |
| North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 38.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2025 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 818.0 MWh | Aug 2015 | Dec 2025 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 214.9 GWh | Jul 2019 | May 2026 | Solar |
| Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.0 GWh | Oct 2014 | Dec 2025 | Solar |
| Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2016 | Dec 2025 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2025 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Nov 2025 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2025 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2025 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2017 | Dec 2025 | Wind |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 234.0 GWh | Nov 2018 | May 2026 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2014 | Dec 2025 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Nov 2025 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 48.3 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| Pastoria Energy Facility, LLC | Calpine Corp - Pastoria Energy Center | Lebec, CA | California Independent System Operator (CISO) | 3.3 TWh | Apr 2005 | May 2026 | Natural Gas |
| Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 22.3 GWh | Apr 1924 | Dec 2025 | Water |
| Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 6.7 GWh | Nov 1911 | Dec 2025 | Water |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 33.1 GWh | Feb 1990 | Dec 2025 | Water |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2002 | May 2026 | Natural Gas |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 16.7 GWh | Nov 2022 | Dec 2025 | Solar |
| Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 22.5 GWh | Oct 2022 | Dec 2025 | Solar |
| Kings CSG 3 LLC Community Solar | Dimension Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Solar Blue | Westlands Solar Blue | Lemoore, CA | California Independent System Operator (CISO) | 645.1 GWh | Nov 2023 | May 2026 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2023 | Dec 2025 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 372.7 GWh | Oct 2020 | Apr 2026 | Solar |
| Aquamarine | Aqua | Lemoore, CA | California Independent System Operator (CISO) | 650.5 GWh | Aug 2021 | May 2026 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Chestnut | Chestnut Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 370.2 GWh | Nov 2023 | May 2026 | Solar |
| RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 50.5 GWh | May 2013 | Dec 2025 | Solar |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Sep 2025 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 287.6 GWh | Nov 2020 | May 2026 | Solar |
| RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 24.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 170.4 GWh | Jul 2016 | Dec 2025 | Solar |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.4 GWh | Oct 2004 | Dec 2025 | Landfill Gas |
| Rio Bravo Rocklin | Rio Bravo Rocklin | Lincoln, CA | California Independent System Operator (CISO) | 147.0 GWh | May 1989 | Dec 2025 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
| Sierra Pacific Lincoln Facility | Sierra Pacific Industries | Lincoln, CA | California Independent System Operator (CISO) | 80.1 GWh | Feb 2004 | Dec 2025 | Wood/Wood Waste Solids |
| Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2021 | Dec 2025 | Solar |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 24.8 GWh | Mar 2014 | Dec 2025 | Landfill Gas |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.8 GWh | Dec 2013 | Dec 2025 | Solar |
| 2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2024 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.5 GWh | Jan 2016 | Dec 2025 | Solar |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.7 GWh | Feb 2013 | Dec 2025 | Landfill Gas |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 129.6 GWh | Oct 2017 | May 2026 | Wind |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 253.3 GWh | Nov 2015 | Dec 2025 | Wind |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 179.1 GWh | Jun 2021 | May 2026 | Wind |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 38.8 GWh | Feb 1969 | Dec 2025 | Landfill Gas |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 233.7 GWh | Nov 2011 | Oct 2025 | Wind |
| Diablo Winds LLC | Sequitur Renewables, LLC | Livermore, CA | California Independent System Operator (CISO) | 30.5 GWh | Nov 2004 | Dec 2025 | Wind |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Enchanted Rock Lodi | Enchanted Rock | Lodi, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2024 | Dec 2025 | Natural Gas |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2014 | Dec 2025 | Solar |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 403.0 GWh | Oct 2012 | May 2026 | Natural Gas |
| Bear Creek Solar (Lodi) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Nov 2025 | Solar |
| Lodi | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 1.9 GWh | Jan 1986 | Dec 2025 | Natural Gas |
| Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 59.9 GWh | Jan 1980 | May 2026 | Natural Gas |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 194.9 GWh | Nov 2023 | May 2026 | Wind |
| Cottonwood | Los Angeles Department of Water & Power | Lone Pine, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Oct 1908 | Dec 2025 | Water |
| Spring Gap | Pacific Gas & Electric Co. | Long Barn, CA | California Independent System Operator (CISO) | 11.6 GWh | Aug 1921 | Dec 2025 | Water |
| AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 28.2 GWh | Aug 1956 | Oct 2025 | Natural Gas |
| Haynes | Los Angeles Department of Water & Power | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 TWh | Aug 1962 | May 2026 | Natural Gas |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 33.7 GWh | Jul 1976 | Dec 2025 | Waste Heat |
| Long Beach Generation | Long Beach Generation LLC | Long Beach, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1976 | Dec 2024 | Natural Gas |
| THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 158.2 GWh | Dec 2002 | May 2026 | Natural Gas |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 7.2 GWh | Nov 2017 | Dec 2025 | Solar |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.1 TWh | Jan 2020 | May 2026 | Natural Gas |
| BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 19.1 GWh | Jul 2023 | Dec 2024 | Solar |
| Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 36.9 GWh | May 2020 | Dec 2025 | Natural Gas |
| DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Jan 2013 | Dec 2025 | Solar |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 25.0 MWh | Mar 2005 | Oct 2025 | Solar |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Dec 1985 | Dec 2025 | Landfill Gas |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 235.0 GWh | Sep 1993 | May 2026 | Natural Gas |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.0 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.1 GWh | Jul 2020 | Dec 2025 | Solar |
| Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2020 | Dec 2025 | Solar |
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2025 | Solar |
| Westmont 400A | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | Jun 2017 | Dec 2025 | Solar |
| Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 31.8 GWh | Sep 2015 | May 2026 | Natural Gas |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.9 GWh | Jun 2017 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 317 | 34.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |