Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 21.1 GWh | Apr 2015 | Dec 2023 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.7 GWh | Jul 2013 | Dec 2023 | Solar |
Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2011 | Dec 2023 | Solar |
Corona | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 4.1 GWh | Jul 1983 | Dec 2023 | Water |
Temescal | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 7.1 GWh | Jun 1983 | Dec 2023 | Water |
Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 13.1 GWh | Feb 2005 | Dec 2023 | Natural Gas |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 32.9 GWh | Sep 1957 | Mar 2025 | Purchased Steam |
Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1995 | Mar 2025 | Natural Gas |
Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 31.0 GWh | - | Mar 2025 | Solar |
Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 355.1 GWh | - | Mar 2025 | Solar |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 25.9 GWh | May 2017 | Dec 2023 | Landfill Gas |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 15.6 GWh | May 2017 | Dec 2023 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 61.0 GWh | Oct 2017 | Mar 2025 | Solar |
Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 537.9 GWh | Nov 2023 | Mar 2025 | Solar |
Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 883.6 GWh | Jun 2023 | Mar 2025 | Solar |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 56.7 GWh | Nov 1984 | Dec 2023 | Solar |
Sunray 3 | Sunray Energy 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 32.6 GWh | Nov 1985 | Dec 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2013 | Dec 2023 | Solar |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Nov 2023 | Solar |
UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 23.4 GWh | Feb 2015 | Dec 2023 | Solar |
West Village Solar - Array 2 Community Solar | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2022 | Dec 2023 | Solar |
West Village Solar - Array 1Community Solar | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2022 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 990.0 MWh | Nov 2017 | Dec 2023 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 30.0 GWh | Aug 2016 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 43.8 GWh | Aug 2016 | Dec 2023 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 619.0 MWh | Aug 2023 | Dec 2023 | Solar |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2012 | Dec 2023 | Solar |
Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.9 GWh | Dec 2012 | Nov 2023 | Natural Gas |
Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Roll Delano 2 | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2023 | Solar |
Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 659.4 GWh | Oct 2013 | Dec 2023 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 516.0 GWh | Nov 2021 | Mar 2025 | Solar |
Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 302.4 GWh | Nov 2021 | Mar 2025 | Solar |
Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 207.8 GWh | Nov 2020 | Mar 2025 | Solar |
Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 543.5 GWh | Oct 2013 | Dec 2023 | Solar |
Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 575.1 GWh | - | Mar 2025 | Solar |
Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 238.7 GWh | Oct 2021 | Mar 2025 | Solar |
Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 166.4 GWh | Nov 2020 | Mar 2025 | Solar |
Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 645.4 GWh | May 2022 | Mar 2025 | Solar |
Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 375.5 GWh | Nov 2020 | Mar 2025 | Solar |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 593.0 GWh | Aug 2023 | Mar 2025 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 544.8 GWh | Aug 2023 | Mar 2025 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 659.1 GWh | - | Mar 2025 | Solar |
Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 240.9 GWh | Nov 2020 | Mar 2025 | Solar |
Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 2013 | Dec 2023 | Solar |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 319.8 GWh | Apr 2013 | Mar 2025 | Natural Gas |
Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2011 | Dec 2023 | Solar |
Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2022 | Dec 2023 | Solar |
Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2012 | Mar 2025 | Wind |
Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.4 TWh | Sep 1969 | Mar 2025 | Water |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2015 | Dec 2023 | Solar |
Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2023 | Solar |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 5.3 GWh | May 2012 | Dec 2023 | Natural Gas |
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 47.7 GWh | Nov 2016 | Dec 2023 | Solar |
CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 46.9 GWh | Nov 2016 | Dec 2023 | Solar |
CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 36.1 GWh | Nov 2016 | Dec 2023 | Solar |
Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 76.3 GWh | - | Mar 2025 | Solar |
CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 47.2 GWh | Nov 2016 | Dec 2023 | Solar |
Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
Dutch Flat 2 | Nevada Irrigation District | Dutch Flat, CA | California Independent System Operator (CISO) | 46.7 GWh | Oct 1965 | Dec 2023 | Water |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2019 | Dec 2023 | Solar |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2017 | Dec 2023 | Solar |
Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 31.0 GWh | Nov 2015 | Dec 2023 | Solar |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 28.0 GWh | Sep 2015 | Dec 2023 | Solar |
EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2023 | Solar |
EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2023 | Solar |
Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
Cuyamaca Peak Energy Plant | San Diego Gas & Electric Co | El Cajon, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2002 | Dec 2023 | Natural Gas |
El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 7.6 GWh | May 2010 | Dec 2023 | Natural Gas |
Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 1.6 GWh | Nov 2015 | Dec 2023 | Solar |
USG 1 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.7 GWh | Mar 2014 | Dec 2023 | Solar |
Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 46.2 GWh | Sep 2013 | Dec 2023 | Solar |
El Centro Hybrid | Imperial Irrigation District | El Centro, CA | Imperial Irrigation District (IID) | 1.0 TWh | Jul 1952 | Mar 2025 | Natural Gas |
Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 328.6 GWh | Sep 2013 | Dec 2023 | Solar |
Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 19.3 GWh | Apr 2008 | Dec 2023 | Natural Gas : 93.5% Solar : 6.5% |
Blue Shld Of Cal- El Dorado Hlls Mtr B | Tesla Inc. | El Dorado Hills, CA | Balancing Authority of Northern California (BANC) | 3.0 GWh | Jun 2019 | Dec 2023 | Solar |
El Dorado Solar, LLC | Greenbacker Renewable Energy Corporation | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2023 | Solar |
Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.1 GWh | Aug 2017 | Dec 2023 | Natural Gas |
El Segundo Cogen | Chevron USA Inc-El Segundo | El Segundo, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1987 | Mar 2025 | Natural Gas : 99.6% |
El Segundo Energy Center LLC | El Segundo Energy Center, LLC | El Segundo, CA | California Independent System Operator (CISO) | 137.7 GWh | Jun 2013 | Mar 2025 | Natural Gas |
Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 13.5 GWh | Mar 1986 | Dec 2023 | Water |
SMUD at Grundman | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 24.2 GWh | Nov 2011 | Dec 2023 | Solar |
RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2023 | Solar |
RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.1 GWh | Jan 2012 | Dec 2023 | Solar |
RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.8 GWh | Dec 2011 | Dec 2023 | Solar |
RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.7 GWh | Jan 2012 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2025 generation numbers.County | State Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 32.7 TWh |
Los Angeles County, CA | # 2 | 290 | 21.1 TWh |
San Luis Obispo County, CA | # 3 | 20 | 20.5 TWh |
Riverside County, CA | # 4 | 158 | 14.0 TWh |
Contra Costa County, CA | # 5 | 50 | 13.3 TWh |
San Bernardino County, CA | # 6 | 196 | 13.3 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.4 TWh |
Shasta County, CA | # 9 | 46 | 6.8 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Sonoma County, CA | # 11 | 24 | 5.2 TWh |
San Diego County, CA | # 12 | 148 | 5.1 TWh |
Santa Clara County, CA | # 13 | 73 | 4.3 TWh |
Kings County, CA | # 14 | 54 | 3.9 TWh |
Butte County, CA | # 15 | 25 | 3.7 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Tuolumne County, CA | # 17 | 23 | 3.3 TWh |
Orange County, CA | # 18 | 58 | 3.2 TWh |
Solano County, CA | # 19 | 40 | 3.1 TWh |
Colusa County, CA | # 20 | 3 | 2.8 TWh |
Alameda County, CA | # 21 | 43 | 2.6 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Placer County, CA | # 23 | 21 | 2.5 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Plumas County, CA | # 25 | 13 | 1.9 TWh |
Sutter County, CA | # 26 | 7 | 1.8 TWh |
El Dorado County, CA | # 27 | 15 | 1.7 TWh |
Yuba County, CA | # 28 | 4 | 1.7 TWh |
County | State Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 969.7 GWh |
Lake County, CA | # 31 | 10 | 900.9 GWh |
Tulare County, CA | # 32 | 53 | 891.1 GWh |
Ventura County, CA | # 33 | 30 | 795.5 GWh |
Mono County, CA | # 34 | 9 | 794.9 GWh |
Amador County, CA | # 35 | 7 | 780.8 GWh |
Calaveras County, CA | # 36 | 6 | 713.3 GWh |
Trinity County, CA | # 37 | 5 | 545.3 GWh |
Humboldt County, CA | # 38 | 10 | 474.0 GWh |
Nevada County, CA | # 39 | 12 | 343.4 GWh |
Merced County, CA | # 40 | 25 | 342.8 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 339.1 GWh |
San Benito County, CA | # 43 | 5 | 324.4 GWh |
Mariposa County, CA | # 44 | 2 | 250.6 GWh |
Siskiyou County, CA | # 45 | 8 | 234.3 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 125.9 GWh |
San Francisco County, CA | # 48 | 10 | 76.5 GWh |
Tehama County, CA | # 49 | 7 | 71.5 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Glenn County, CA | # 52 | 2 | 16.5 GWh |
Mendocino County, CA | # 53 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 7.4 GWh |
Sierra County, CA | # 55 | 3 | 2.3 GWh |