| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 11.2 GWh | Sep 1983 | Aug 2025 | Water |
| Camanche | East Bay Municipal Util Dist - (CA) | Clements & Wallace, CA | California Independent System Operator (CISO) | 17.1 GWh | Jun 1983 | Dec 2025 | Water |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2025 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2018 | Dec 2025 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2025 | Solar |
| Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 2.1 GWh | May 1973 | Dec 2025 | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
| Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 42.0 GWh | May 1988 | Dec 2025 | Natural Gas |
| Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 38.9 GWh | Sep 1986 | Dec 2025 | Natural Gas |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2014 | Dec 2025 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2025 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Rollins | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 36.9 GWh | Jul 1980 | Dec 2025 | Water |
| Chicago Park | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 65.2 GWh | Oct 1965 | Dec 2025 | Water |
| Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 563.0 MWh | Aug 2001 | Dec 2025 | Natural Gas |
| Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 570.0 MWh | Jul 2001 | Dec 2025 | Natural Gas |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 3.8 GWh | May 2003 | Dec 2025 | Natural Gas |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2025 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 789.0 MWh | Mar 2015 | Dec 2025 | Solar |
| Corcoran Solar 3 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2016 | Dec 2025 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 20.6 GWh | Apr 2015 | Dec 2025 | Solar |
| Corcoran Solar 2 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.8 GWh | Dec 2013 | Dec 2025 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Corcoran Irrigation District | Madison Energy Investments LLC | Corcoran, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2019 | Sep 2025 | Solar |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2005 | Dec 2025 | Natural Gas |
| Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.6 GWh | Apr 2011 | Dec 2025 | Solar |
| Temescal | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 14.4 GWh | Jun 1983 | Apr 2025 | Water |
| Corona | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 13.3 GWh | Jul 1983 | Apr 2025 | Water |
| Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2022 | Dec 2025 | Solar |
| C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 40.5 GWh | Sep 1957 | Apr 2026 | Purchased Steam |
| Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.3 TWh | Nov 1995 | Feb 2026 | Natural Gas |
| Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 464.5 GWh | Mar 2024 | May 2026 | Solar |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.5 GWh | May 2024 | May 2026 | Solar |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 31.3 GWh | May 2017 | Dec 2025 | Landfill Gas |
| Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 16.2 GWh | May 2017 | Dec 2025 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 59.3 GWh | Oct 2017 | May 2026 | Solar |
| Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 54.6 GWh | Nov 1984 | Dec 2025 | Solar |
| Sunray 3 | Sunray Energy 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 37.2 GWh | Nov 1985 | Dec 2025 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 504.1 GWh | Nov 2023 | May 2026 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 844.0 GWh | Jun 2023 | May 2026 | Solar |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 746.0 MWh | Apr 2022 | Dec 2025 | Solar |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 619.0 MWh | Apr 2022 | Dec 2025 | Solar |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 11.9 GWh | Feb 2015 | Dec 2025 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2021 | Dec 2025 | Solar |
| POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 2021 | Dec 2025 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2025 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 32.4 GWh | Aug 2016 | Dec 2025 | Solar |
| Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2010 | Oct 2025 | Solar |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2012 | Dec 2025 | Natural Gas |
| North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2025 | Solar |
| Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 46.3 GWh | Aug 2016 | Dec 2025 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2023 | Dec 2025 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 892.0 MWh | Nov 2017 | Dec 2025 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.9 GWh | Nov 2020 | May 2026 | Solar |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 703.4 GWh | May 2022 | May 2026 | Solar |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 620.2 GWh | Oct 2013 | Dec 2025 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 330.2 GWh | Nov 2020 | May 2026 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 516.8 GWh | Oct 2013 | Dec 2025 | Solar |
| Oberon Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 570.1 GWh | Aug 2023 | May 2026 | Solar |
| Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 295.5 GWh | Nov 2020 | May 2026 | Solar |
| Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 398.2 GWh | Nov 2021 | May 2026 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 558.5 GWh | Nov 2021 | May 2026 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 193.6 GWh | Nov 2020 | May 2026 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 740.4 GWh | Feb 2024 | May 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 568.8 GWh | Feb 2024 | May 2026 | Solar |
| Oberon II Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 580.5 GWh | Aug 2023 | May 2026 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 246.1 GWh | Oct 2021 | May 2026 | Solar |
| Desert Hot Springs Solar | RWE Clean Energy | Desert Hot Springs, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 124.4 GWh | Apr 2013 | May 2026 | Natural Gas |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2022 | Dec 2025 | Solar |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 875.0 MWh | Nov 2012 | May 2026 | Wind |
| Deadwood Creek | Hydro Sierra Energy, LLC | Dobbins, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 1993 | Dec 2025 | Water |
| Colgate | Yuba County Water Agency - (CA) | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Oct 2025 | Water |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 2.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.0 GWh | Sep 2018 | Dec 2025 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| ISH Solar Hospital Downey | Kaiser Permanente | Downey, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2011 | Dec 2025 | Solar |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.4 GWh | May 2012 | Dec 2025 | Natural Gas |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| CED Ducor 3 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 38.4 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 1 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 4 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.8 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 2 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 707.8 GWh | Jan 2025 | May 2026 | Solar |
| Dutch Flat 2 | Nevada Irrigation District | Dutch Flat, CA | California Independent System Operator (CISO) | 15.2 GWh | Oct 1965 | Dec 2025 | Water |
| Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 28.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 34.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2015 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 317 | 34.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |