690 N Studebaker Road, Long Beach, CA 90803Plant Summary Information
AES Alamitos LLC is ranked #117 out of 339 natural gas power plants in California in terms of total annual net electricity generation.
AES Alamitos LLC is comprised of 3 generators and generated 8.2 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | AES Alamitos LLC |
---|---|
Utility Name | AES Alamitos LLC |
Location | Los Angeles County, CA |
Initial Operation Date | September 1956 |
Last Update | May 2025 |
Annual Generation | 31.6 GWh |
Annual Consumption | 559.9 k MMBtu |
Ranked #4,619 out of 12,312 Power Plants Nationwide | |
Ranked #1,240 out of 2,220 Natural Gas Power Plants Nationwide | |
Ranked #599 out of 1,568 California Power Plants | |
Ranked #117 out of 339 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of AES Alamitos LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AES Alamitos LLC.
Monthly Net Generation for AES Alamitos LLC
AES Alamitos LLC Details
Summary Information | |
---|---|
Plant Name | AES Alamitos LLC (315) |
Plant Address | 690 N Studebaker Road, Long Beach, CA 90803 |
Utility | AES Alamitos LLC (22148) |
Latitude, Longitude | 33.7688, -118.1009 |
Generation Dates on File | Jan 2001 to May 2025 |
Initial Operation Date | September 1956 |
Annual Generation | 31.6 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Los Cerritos Channel |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator 3 Details Operating December 1961
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ALAMT3G_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ALAMT3G_7_B1 |
Nameplate Capacity | 310 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 327 MW |
Winter Capacity | 327 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1961 |
---|---|
Planned Retirement | December 2026 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating June 1962
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ALAMT4G_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ALAMT4G_7_B1 |
Nameplate Capacity | 310 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 335 MW |
Winter Capacity | 335 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1962 |
---|---|
Planned Retirement | December 2026 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating March 1964
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ALAMT5G_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ALAMT5G_7_B1 |
Nameplate Capacity | 495 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 480 MW |
Winter Capacity | 480 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1964 |
---|---|
Planned Retirement | December 2026 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
AES Alamitos LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1230 | Lon Wright | Fremont, NE | 521.6 GWh |
#1231 | Radford Army Ammunition Plant | Radford, VA | 33.2 GWh |
#1232 | B Braun Medical | Irvine, CA | 32.9 GWh |
#1233 | Tenaska Georgia Generation Facility | Franklin, GA | 37.7 GWh |
#1234 | University of California Santa Cruz | Santa Cruz, CA | 35.2 GWh |
#1235 | Robert Mueller Energy Center | Austin, TX | 32.2 GWh |
#1236 | New Mexico State University | Las Cruces, NM | 32.1 GWh |
#1237 | Alpaca | Canton Township, PA | 32.1 GWh |
#1238 | Ergon Refining Vicksburg | Vicksburg, MS | 31.8 GWh |
#1239 | Fuel Cell 18B Sneden Avenue | Staten Island, NY | 31.7 GWh |
#1241 | International Paper Co. - New Bern Mill | New Bern, NC | 184.0 GWh |
#1242 | Eastern Maine Medical Center | Bangor, ME | 31.3 GWh |
#1243 | Greenleaf 2 Power Plant | Yuba City, CA | 31.3 GWh |
#1244 | Montefieor Medical Center Moses Division | Bronx, NY | 31.9 GWh |
#1245 | CSUF Trigeneration | Fullerton, CA | 38.0 GWh |
#1246 | Plant No 2 Freeport | Freeport, NY | 31.1 GWh |
#1247 | Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 30.9 GWh |
#1248 | Mill Creek (SC) | Blacksburg, SC | 31.9 GWh |
#1249 | TECO CHP-1 | Houston, TX | 30.7 GWh |
#1250 | Tinker | Oklahoma City, OK | 30.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AES Alamitos LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Alamitos Energy Center | Long Beach, CA | 2.4 TWh | 0.1 mi |
Barre Peaker | Stanton, CA | 12.7 GWh | 7.3 mi |
BCE Los Alamitos 1 | Los Alamitos, CA | 25.6 GWh | 2.6 mi |
BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 3.1 mi |
City of Long Beach Airport Lot A & B | Long Beach, CA | 2.8 GWh | 4 mi |
Colon PV | Wilmington, CA | 1.2 GWh | 8.9 mi |
CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 1.1 mi |
Equilon Los Angeles Refining | Wilmington, CA | 360.0 GWh | 7.8 mi |
Harbor Cogen | Wilmington, CA | 17.4 GWh | 7.5 mi |
Haynes | Long Beach, CA | 2.0 TWh | 0.3 mi |
Long Beach Generation LLC | Long Beach, CA | 10.3 GWh | 7.1 mi |
Signal Hill West Unit | Signal Hill, CA | 38.6 GWh | 5.2 mi |
Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 8 mi |
Stanton Energy Reliability Center Hybrid | Stanton, CA | 601.0 MWh | 7.1 mi |
Staples La Mirada, CA | La Mirada, CA | 871.0 MWh | 9.2 mi |
THUMS | Long Beach, CA | 278.3 GWh | 6.5 mi |
Toyota Long Beach Trigen | Long Beach, CA | 16.8 GWh | 7 mi |
Valero Wilmington Cogeneration Plant | Wilmington, CA | 228.2 GWh | 7.9 mi |
Watson Cogeneration | Carson, CA | 2.3 TWh | 8.9 mi |
Wilmington Hydrogen Plant | Wilmington, CA | 135.6 GWh | 8 mi |