Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 4.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Moccasin Low Head Hydro Project | City & County of San Francisco | Moccasin, CA | California Independent System Operator (CISO) | 4.0 MWh | Jun 1987 | Nov 2024 | Water |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 MWh | Nov 2023 | Dec 2024 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 8.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Improvement Dst No. 4 | Kern County Water Agency | Bakersfield, CA | California Independent System Operator (CISO) | 12.0 MWh | Dec 2008 | Dec 2024 | Solar |
| City of Palo Alto | City of Palo Alto | Palo Alta, CA | California Independent System Operator (CISO) | 20.6 MWh | Feb 2002 | Dec 2023 | Natural Gas |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 57.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 66.0 MWh | Jun 2013 | Dec 2024 | Natural Gas |
| Bolthouse S&P and Rowen Farms Solar | MMA WBF Power LP | Palmdale, CA | California Independent System Operator (CISO) | 67.0 MWh | Oct 2008 | Apr 2024 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 68.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
| Tipton 2 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 83.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Springville Hydroelectric | Calleguas Mun Water District | Camarillo, CA | California Independent System Operator (CISO) | 98.0 MWh | Feb 1994 | Dec 2024 | Water |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 154.0 MWh | Mar 2005 | Oct 2024 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
| Tipton 1 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 172.0 MWh | May 1973 | Dec 2024 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
| H. Gonzales | City of Vernon | Vernon, CA | California Independent System Operator (CISO) | 178.4 MWh | Dec 1986 | Dec 2024 | Natural Gas |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 270.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 270.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Lake One | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 285.0 MWh | May 2002 | Dec 2024 | Natural Gas |
| Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 307.0 MWh | Dec 2004 | Dec 2024 | Natural Gas |
| CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 323.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 325.0 MWh | Aug 1990 | May 2024 | Water |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 375.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Walnut | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 429.0 MWh | Mar 1986 | Dec 2024 | Natural Gas : 90.5% Distillate Fuel Oil : 9.5% |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 455.0 MWh | Sep 2020 | Dec 2024 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 458.0 MWh | May 2014 | Dec 2024 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 517.0 MWh | Jan 2002 | Apr 2025 | Solar : 99.8% |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
| Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 541.0 MWh | May 2014 | Dec 2024 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 581.0 MWh | May 2013 | Dec 2024 | Solar |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 616.0 MWh | Mar 2016 | Dec 2024 | Solar |
| Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 621.0 MWh | Nov 2013 | Dec 2024 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 636.0 MWh | Jul 2024 | Dec 2024 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 651.0 MWh | Feb 2012 | Dec 2024 | Solar |
| Oroville Cogeneration LP | Apex Power Generation Corp. | Oroville, CA | California Independent System Operator (CISO) | 672.3 MWh | Dec 1989 | Dec 2024 | Natural Gas |
| Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 674.0 MWh | Apr 2020 | Dec 2024 | Other Biomass Gas |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 683.0 MWh | Jul 2024 | Dec 2024 | Solar |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 716.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 796.0 MWh | Aug 2015 | Dec 2024 | Solar |
| Walnut Unified School District Walnut HS | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 809.0 MWh | Jan 2020 | Dec 2024 | Solar |
| Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 825.0 MWh | Jun 2002 | Dec 2024 | Natural Gas |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 826.0 MWh | Mar 2018 | Dec 2024 | Solar |
| CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 865.0 MWh | Nov 2001 | Dec 2024 | Solar |
| Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 870.0 MWh | Dec 2017 | Dec 2024 | Solar |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 871.0 MWh | Feb 2009 | Dec 2024 | Solar |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 877.0 MWh | Oct 2024 | Dec 2024 | Solar |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 900.0 MWh | Aug 2007 | Dec 2024 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 901.0 MWh | Sep 2009 | Dec 2024 | Solar |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 908.0 MWh | Jul 2007 | Dec 2024 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 913.0 MWh | Oct 2023 | Dec 2024 | Solar |
| Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 918.0 MWh | Jul 2024 | Dec 2024 | Solar |
| IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 929.0 MWh | Mar 2011 | Oct 2024 | Solar |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
| Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 952.0 MWh | Aug 2001 | Dec 2024 | Natural Gas |
| Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 961.0 MWh | Jan 2013 | Dec 2024 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 963.0 MWh | Nov 2017 | Dec 2024 | Solar |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 982.0 MWh | Nov 2011 | Dec 2024 | Solar |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 991.0 MWh | Jul 2016 | Jul 2024 | Solar |
| SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 996.0 MWh | Apr 2008 | Dec 2024 | Solar |
| Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 1.0 GWh | Jul 2001 | Dec 2024 | Natural Gas |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 1.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2024 | Solar |
| Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Aug 2014 | Dec 2024 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2012 | Dec 2024 | Solar |
| Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.1 GWh | Aug 2012 | Dec 2024 | Solar |
| Forever 21 Retail, Inc. | Los Angeles Department of Water & Power | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Jan 2015 | Dec 2024 | Solar |
| ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2024 | Solar |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2012 | Sep 2025 | Wind |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2008 | Dec 2024 | Solar |
| Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2018 | Dec 2024 | Solar |
| ISH Solar Hospital SDMC | SunEdison LLC | San Diego, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2024 | Solar |
| Monterey Regional Water Pollution Contro | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2008 | Dec 2024 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2023 | Dec 2024 | Solar |
| West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2012 | Dec 2024 | Solar |
| Kaweah 2 | Southern California Edison Co | Three Rivers, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 1929 | Dec 2024 | Water |
| Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Jan 2013 | Dec 2024 | Solar |
| Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.3 GWh | May 2016 | Dec 2024 | Natural Gas |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
| CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2010 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |