Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 4.0 MWh | Jun 2007 | Dec 2025 | Natural Gas |
| Improvement Dst No. 4 | Kern County Water Agency - (CA) | Bakersfield, CA | California Independent System Operator (CISO) | 12.0 MWh | Dec 2008 | Dec 2024 | Solar |
| Spaulding 2 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 21.0 MWh | Jun 1928 | Nov 2025 | Water |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 25.0 MWh | Mar 2005 | Oct 2025 | Solar |
| H. Gonzales | City of Vernon - (CA) | Vernon, CA | California Independent System Operator (CISO) | 29.4 MWh | Dec 1986 | Dec 2025 | Natural Gas |
| Bishop Ranch - BR 15-DD | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 62.0 MWh | Feb 2025 | May 2025 | Solar |
| Conflitti Solar | CES Electron Farm One, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 100.0 MWh | - | Dec 2025 | Solar |
| CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 100.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Oroville Cogeneration, LLC | Apex Power Generation Corp. | Oroville, CA | California Independent System Operator (CISO) | 115.6 MWh | Dec 1989 | Dec 2025 | Natural Gas |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Pierce College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 143.0 MWh | Dec 2012 | Dec 2025 | Solar |
| CFF Rice Mill Solar Plant | California Family Foods | Arbuckle, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 145.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Tipton 1 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Hellyer Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 241.0 MWh | Jul 2017 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 305.0 MWh | Jul 1974 | Dec 2025 | Natural Gas |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
| Los Angeles Harbor College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 313.0 MWh | Sep 2010 | Dec 2025 | Solar |
| Walnut Unified School District Walnut HS | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 327.0 MWh | Jan 2020 | Jun 2025 | Solar |
| SF Southeast Cogen Plant | City & County of San Francisco - (CA) | San Francisco, CA | California Independent System Operator (CISO) | 341.0 MWh | May 2002 | Dec 2025 | Other Biomass Gas |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 373.0 MWh | Apr 2001 | Dec 2025 | Natural Gas |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 392.0 MWh | Aug 2011 | May 2026 | Distillate Fuel Oil |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 404.0 MWh | Nov 2011 | Dec 2025 | Wind |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| Rockwood | Imperial Irrigation District | Brawley, CA | Imperial Irrigation District (IID) | 419.0 MWh | May 1979 | Dec 2025 | Natural Gas : 75.5% Distillate Fuel Oil : 24.5% |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 432.0 MWh | Jul 2007 | Dec 2025 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 465.0 MWh | Nov 2018 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 502.0 MWh | May 2006 | Dec 2025 | Solar |
| Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 517.0 MWh | Jan 2002 | Apr 2025 | Solar : 99.8% |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 524.0 MWh | Feb 2022 | Dec 2025 | Solar |
| Amazon - SAN5 | Onyx Asset Services Group | San Diego, CA | California Independent System Operator (CISO) | 530.0 MWh | Oct 2025 | Dec 2025 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 563.0 MWh | Aug 2001 | Dec 2025 | Natural Gas |
| Roseville Power Plant #2 | City of Roseville - (CA) | Rocklin, CA | Balancing Authority of Northern California (BANC) | 569.0 MWh | Mar 1986 | Dec 2025 | Natural Gas : 99.9% |
| Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 570.0 MWh | Jul 2001 | Dec 2025 | Natural Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 583.0 MWh | Jun 1993 | Dec 2025 | Landfill Gas |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 586.0 MWh | Oct 2008 | Dec 2025 | Solar |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 599.0 MWh | Aug 2007 | Dec 2025 | Solar |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 619.0 MWh | Apr 2022 | Dec 2025 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 651.0 MWh | Mar 2024 | Dec 2025 | Solar |
| Springville Hydroelectric | Calleguas Mun Water District | Camarillo, CA | California Independent System Operator (CISO) | 659.0 MWh | Feb 1994 | Dec 2025 | Water |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 715.0 MWh | Feb 2009 | Nov 2025 | Solar |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 746.0 MWh | Apr 2022 | Dec 2025 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 747.6 MWh | May 2013 | Dec 2025 | Solar |
| Mill Creek 3 | Southern California Edison Co | Mill Creek, CA | California Independent System Operator (CISO) | 771.0 MWh | Feb 1903 | Dec 2025 | Water |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 789.0 MWh | Mar 2015 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 806.0 MWh | Nov 2012 | Dec 2025 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 818.0 MWh | Aug 2015 | Dec 2025 | Solar |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 840.0 MWh | Dec 1989 | Dec 2025 | Natural Gas |
| Foster Clean Power A | Foster Clean Power A, LLC | Arcata, CA | California Independent System Operator (CISO) | 846.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Sonora 1 | CleanCapital Holdings | Jamestown, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2013 | Dec 2025 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 875.0 MWh | Nov 2012 | May 2026 | Wind |
| Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 878.0 MWh | Jun 2002 | Dec 2025 | Natural Gas |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 892.0 MWh | Nov 2017 | Dec 2025 | Solar |
| Foster Clean Power B | Foster Clean Power B LLC | Arcata, CA | California Independent System Operator (CISO) | 901.0 MWh | Aug 2025 | Dec 2025 | Solar |
| CPA 2132 E Dominguez | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 913.0 MWh | Jul 2025 | Dec 2025 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 929.0 MWh | Sep 2009 | Dec 2025 | Solar |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 946.0 MWh | Jul 2016 | Dec 2025 | Solar |
| Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 952.0 MWh | Nov 2021 | Dec 2025 | Solar |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Etiwanda | Metropolitan Water District of S CA | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 1994 | Jul 2025 | Water |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2008 | Dec 2025 | Solar |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2014 | Dec 2025 | Solar |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2016 | Dec 2025 | Natural Gas |
| Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Aug 2014 | Dec 2024 | Solar |
| CPA Wilmington 1 | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 1.1 GWh | Jul 2025 | Dec 2025 | Solar |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2016 | Dec 2025 | Solar |
| AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 1988 | Apr 2026 | Natural Gas |
| Forever 21 Retail, Inc. | Mission Owner LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Jan 2015 | Dec 2024 | Solar |
| Monterey Regional Water Pollution Contro | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2010 | Dec 2025 | Solar |
| Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2025 | Solar |
| San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 1.2 GWh | Feb 1986 | Sep 2025 | Water |
| Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Jan 2013 | Dec 2025 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2003 | Dec 2025 | Natural Gas |
| Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2015 | Dec 2024 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.2 GWh | Oct 2007 | Dec 2025 | Solar |
| McClellan (CA) | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Feb 1986 | Dec 2025 | Natural Gas |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2017 | Oct 2025 | Solar |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.3 GWh | Jun 2010 | Dec 2025 | Solar |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2007 | Dec 2025 | Solar |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2010 | Dec 2025 | Solar |
| Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Nov 2016 | Mar 2025 | Solar |
| Elkhorn Dairy | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2009 | Dec 2025 | Solar |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Diamond Valley Lake | Metropolitan Water District of S CA | Winchester, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2001 | Oct 2025 | Water |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |