Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 3.2 GWh | Dec 2013 | Dec 2025 | Natural Gas |
| Enerparc CA1 LLC | CleanCapital Holdings | Hollister, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2025 | Solar |
| OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2018 | Dec 2025 | Solar |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2009 | Dec 2025 | Solar |
| Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 1986 | Dec 2024 | Wind |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2016 | Dec 2025 | Solar |
| Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2014 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| El Dorado Solar, LLC | Altus Power America Management, LLC | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Moccasin Low Head Hydro Project | City & County of San Francisco - (CA) | Moccasin, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 1987 | Dec 2025 | Water |
| 8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jan 2022 | Dec 2025 | Solar |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2023 | Dec 2025 | Solar |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 3.4 GWh | Sep 2016 | Dec 2025 | Other Biomass Gas |
| Red Bluff | California Power Holdings LLC | Red Bluff, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2001 | Dec 2025 | Natural Gas |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Cottonwood | Los Angeles Department of Water & Power | Lone Pine, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Oct 1908 | Dec 2025 | Water |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.4 GWh | Oct 2014 | Aug 2026 | Wind |
| Venable Solar 2 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Sep 2025 | Solar |
| ERock MID Claribel Generation Station | Enchanted Rock | Modesto, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Mar 2024 | Dec 2025 | Natural Gas |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2021 | Dec 2025 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.4 GWh | Jan 2020 | Dec 2025 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.5 GWh | Mar 2020 | Dec 2025 | Solar |
| Corcoran Irrigation District Floating So | Solar Powered Ag, LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2025 | Dec 2025 | Solar |
| Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2025 | Solar |
| Desert Hot Springs Solar | RWE Clean Energy | Desert Hot Springs, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Lake One | City of Burbank Water and Power - (CA) | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | May 2002 | Sep 2025 | Natural Gas |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2002 | Aug 2026 | Natural Gas |
| SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2025 | Solar |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2015 | Dec 2025 | Solar |
| Westmont 400A | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | Jun 2017 | Dec 2025 | Solar |
| McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 3.5 GWh | Sep 1991 | Aug 2026 | Natural Gas |
| IOS II-LAX9 | Madison Energy Holdings LLC | Fontana, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2025 | Solar |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2012 | Dec 2025 | Wind |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2005 | Dec 2025 | Natural Gas |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2016 | Dec 2025 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Powhatan Solar Power Generation Station | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2025 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| Hickman | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.6 GWh | Aug 1979 | Dec 2025 | Water |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| Volta 2 | Pacific Gas & Electric Co. | Manton, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 1981 | Dec 2025 | Water |
| Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Amazon Visalia (FAT2) | Madison Energy Investments LLC | Visalia, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Vulcan San Emidio Solar | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.7 GWh | May 2010 | Dec 2025 | Solar |
| Wonderful Huller & Shelling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.7 GWh | Jul 2021 | Dec 2025 | Solar |
| Venable Solar 1 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2015 | Dec 2025 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.7 GWh | Sep 2013 | Dec 2025 | Solar |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.7 GWh | Jan 2021 | Dec 2025 | Solar |
| Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 3.8 GWh | May 2003 | Dec 2025 | Natural Gas |
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2025 | Solar |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 3.8 GWh | Dec 2020 | Dec 2025 | Solar |
| Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 1985 | Oct 2025 | Water |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2025 | Wind |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Nov 2025 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2013 | Dec 2025 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 3.8 GWh | Apr 2024 | Dec 2025 | Solar |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2008 | Dec 2025 | Solar |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Sep 2014 | Dec 2025 | Solar |
| Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.8 GWh | Jul 2012 | Dec 2025 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.8 GWh | Mar 2024 | Dec 2025 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2024 | Dec 2025 | Solar |
| Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2008 | Dec 2025 | Solar |
| Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 3.9 GWh | Feb 1990 | Dec 2025 | Water |
| Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| SMUD at Fleshman | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Nov 2011 | Dec 2025 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
| Bear Creek Solar (Lodi) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Nov 2025 | Solar |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2025 | Wind |
| Wolfskill Energy Center | Gilroy Energy Center LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2020 | Dec 2025 | Solar |
| Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Regional Wastewater Control Facility | City of Stockton MUD - (CA) | Stockton, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2000 | Dec 2025 | Other Biomass Gas : 98.0% Natural Gas : 1.9% |
| Goose Haven Energy Center | Goose Haven Energy Center | Suisun, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2002 | Dec 2025 | Natural Gas |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2025 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Nov 2025 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2014 | Dec 2025 | Solar |
| Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2025 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2018 | Dec 2025 | Solar |
| Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2022 | Dec 2025 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2025 | Solar |
| Corcoran Irrigation District | Madison Energy Investments LLC | Corcoran, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2019 | Sep 2025 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2022 | Dec 2025 | Solar |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 333 | 35.3 TWh |