| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2024 | Natural Gas |
| Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 297.7 GWh | Jun 2016 | Dec 2024 | Solar |
| Springbok Solar Farm 2 | 63SU 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 399.0 GWh | Aug 2016 | Dec 2024 | Solar |
| Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 252.6 GWh | Jun 2019 | Sep 2025 | Solar |
| South Belridge Cogeneration Facility | AERA Energy LLC | McKittrick, CA | California Independent System Operator (CISO) | 466.8 GWh | Nov 1985 | Sep 2025 | Natural Gas |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 231.0 GWh | Jul 2019 | Sep 2025 | Solar |
| Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2014 | Dec 2024 | Solar |
| Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2024 | Solar |
| Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2014 | Dec 2024 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| SEPV Imperial Dixieland West | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 7.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.1 GWh | Jun 2016 | Dec 2024 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2024 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 208.7 GWh | Nov 2016 | Sep 2025 | Solar |
| Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2024 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 39.5 GWh | Oct 2015 | Dec 2024 | Solar |
| SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.0 GWh | Dec 2015 | Dec 2024 | Solar |
| SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 25.0 GWh | Jul 2015 | Dec 2024 | Solar |
| SEPV Imperial Dixieland East | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 4.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Apr 2015 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| Shiloh I Wind Project | Avangrid Power LLC | Rio Vista, CA | California Independent System Operator (CISO) | 389.6 GWh | Apr 2006 | Dec 2024 | Wind |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 28.2 GWh | Jul 2011 | Dec 2024 | Solar |
| Starbucks - Evolution Fresh | Bloom Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.1 GWh | May 2014 | Jun 2024 | Natural Gas |
| SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2024 | Natural Gas |
| San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2020 | Dec 2024 | Natural Gas |
| Salton Sea Power LLC - Unit 5 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 290.3 GWh | Mar 2000 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 4 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 179.8 GWh | Apr 1996 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 2 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 107.0 GWh | Feb 1990 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 1 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 78.4 GWh | Jun 1982 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 3 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 314.9 GWh | Jan 1989 | Dec 2024 | Geothermal |
| San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2021 | Dec 2024 | Solar |
| San Diego - NCRC at Vista | California PV Energy 3, LLC | Vista, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 2021 | Dec 2024 | Solar |
| Springville Hydroelectric | Calleguas Mun Water District | Camarillo, CA | California Independent System Operator (CISO) | 98.0 MWh | Feb 1994 | Dec 2024 | Water |
| Sutter Energy Center | Calpine Corp-Sutter | Yuba City, CA | Balancing Authority of Northern California (BANC) | 1.7 TWh | Jun 2001 | Sep 2025 | Natural Gas |
| Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 7.3 GWh | Apr 1990 | Dec 2024 | Water |
| Southeast Kern River Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 47.1 GWh | Jan 1989 | Sep 2025 | Natural Gas |
| SF Southeast Cogen Plant | City & County of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2002 | Dec 2024 | Other Biomass Gas |
| Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 825.0 MWh | Jun 2002 | Dec 2024 | Natural Gas |
| Santa Clara Cogen | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 15.3 GWh | May 1982 | Dec 2023 | Natural Gas |
| Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 15.6 GWh | Mar 1986 | Dec 2024 | Water |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 1993 | Dec 2024 | Landfill Gas |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.0 GWh | May 1996 | Dec 2024 | Landfill Gas |
| SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2012 | Dec 2024 | Solar |
| SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2012 | Dec 2024 | Solar |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 343.1 GWh | Nov 1987 | Dec 2024 | Wood/Wood Waste Solids : 99.5% |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 77.5 GWh | Nov 2015 | Dec 2024 | Solar |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.3 GWh | May 2013 | Dec 2024 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 54.1 GWh | Nov 2015 | Dec 2024 | Solar |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.7 GWh | May 2013 | Dec 2024 | Solar |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 499.1 GWh | May 2024 | Sep 2025 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 217.7 GWh | Nov 2024 | Sep 2025 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 383.0 GWh | Nov 2024 | Sep 2025 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 342.2 GWh | Nov 2024 | Sep 2025 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 202.0 GWh | Nov 2011 | Dec 2024 | Wind |
| San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
| Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 447.6 GWh | Nov 1983 | Dec 2024 | Geothermal |
| Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2024 | Solar |
| Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 621.0 MWh | Nov 2013 | Dec 2024 | Solar |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 199.5 GWh | Jun 2021 | Sep 2025 | Wind |
| Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2014 | Dec 2024 | Solar |
| SRI International Cogen Project | IPT SRI Cogeneration Inc | Menlo Park, CA | California Independent System Operator (CISO) | 23.4 GWh | Mar 1987 | Sep 2025 | Natural Gas |
| Sacramento Point West Medical Offices | KP Sacramento Point West Medical Offices Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Oct 2020 | Dec 2024 | Solar |
| San Gabriel Hydro Project | Los Angeles County-San Gabriel | Azusa, CA | California Independent System Operator (CISO) | 4.9 GWh | Nov 1987 | Apr 2024 | Water |
| Scattergood | Los Angeles Department of Water & Power | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 1.8 TWh | Nov 1958 | Sep 2025 | Natural Gas |
| San Francisquito 1 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 177.7 GWh | Mar 1917 | Dec 2024 | Water |
| San Francisquito 2 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 44.7 GWh | Jun 1920 | Dec 2024 | Water |
| Site 980 65 | Madera-Chowchilla Power Auth | Madera, CA | California Independent System Operator (CISO) | 4.9 GWh | Jan 1985 | Jul 2024 | Water |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 740.6 GWh | Oct 2021 | Sep 2025 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 17.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 149.9 GWh | Nov 2016 | Sep 2025 | Solar |
| Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 4.4 GWh | Jan 1985 | Oct 2024 | Water |
| Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 21.6 GWh | Oct 1989 | Dec 2024 | Water |
| Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 41.8 GWh | Nov 2009 | Dec 2024 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Second Imperial Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 302.3 GWh | May 1993 | Dec 2024 | Geothermal |
| South | Pacific Gas & Electric Co. | Manton, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 1979 | Dec 2024 | Water |
| Stanislaus | Pacific Gas & Electric Co. | Vallecito, CA | California Independent System Operator (CISO) | 315.8 GWh | Feb 1963 | Oct 2024 | Water |
| Spring Gap | Pacific Gas & Electric Co. | Long Barn, CA | California Independent System Operator (CISO) | 29.8 GWh | Aug 1921 | Nov 2024 | Water |
| Spaulding 3 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 15.6 GWh | Jan 1929 | Dec 2024 | Water |
| Spaulding 1 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 17.6 GWh | Apr 1928 | Dec 2024 | Water |
| Salt Springs | Pacific Gas & Electric Co. | Pioneer, CA | California Independent System Operator (CISO) | 107.7 GWh | May 1931 | Dec 2024 | Water |
| Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |