SDCWA - Twin Oaks
3566 N. Twin Oaks Valley Road, San Marcos, CA 92069Plant Summary Information
SDCWA - Twin Oaks is ranked #667 out of 765 solar farms in California in terms of total annual net electricity generation.
SDCWA - Twin Oaks generated 464.6 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | SDCWA - Twin Oaks |
---|---|
Utility Name | CleanCapital Holdings |
Location | San Diego County, CA |
Initial Operation Date | May 2011 |
Last Update | Dec 2022 |
Annual Generation | 1.8 GWh |
Annual Consumption | 6.2 k MMBtu |
Ranked #9,904 out of 11,471 Power Plants Nationwide | |
Ranked #4,534 out of 5,188 Solar Power Plants Nationwide | |
Ranked #1,399 out of 1,545 California Power Plants | |
Ranked #667 out of 765 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Borrego Solar Systems Inc (2013 to 2014) Ahana Renewables, LLC (2015 to 2021) CleanCapital Holdings (2022 to 2022) |
Map of SDCWA - Twin Oaks
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SDCWA - Twin Oaks.
Monthly Net Generation for SDCWA - Twin Oaks
SDCWA - Twin Oaks Details
Summary Information | |
---|---|
Plant Name | SDCWA - Twin Oaks (59139) |
Plant Address | 3566 N. Twin Oaks Valley Road San Marcos, CA 92069 |
Utility | CleanCapital Holdings (65164) |
Latitude, Longitude | 33.21, -117.17056 |
Generation Dates on File | Jan 2013 to Dec 2022 |
Initial Operation Date | May 2011 |
Annual Generation | 1.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-263-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 57449 Details Operating May 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.1 MW |
Virtual Net Metering Agreement | No |
SDCWA - Twin Oaks Plant Owners
Owner Name | Address | Ownership |
---|---|---|
GLC-(CA) Aqua SD, LLC | 2500 Venture Oaks Way, Sacramento, CA 95833 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4524 | Pacific Ethanol Madera Solar Array | Madera, CA | 1.8 GWh |
#4525 | Hot Springs 2020 | Hot Springs, AR | 1.8 GWh |
#4526 | Bergenmand Solar Partners, LLC Mahwah | Mahwah, NJ | 1.8 GWh |
#4527 | Syncarpha Hancock III CSG | Pittsfield, MA | 1.8 GWh |
#4528 | Grassland 3&4 Solar Project | Davis, CA | 1.8 GWh |
#4529 | Holliston Solar CSG | Holliston, MA | 1.8 GWh |
#4530 | Novel Herber Solar CSG | Rollingstone, MN | 1.8 GWh |
#4531 | City of Madera WWTP | Madera, CA | 1.8 GWh |
#4532 | Little Bay | Providence, RI | 1.8 GWh |
#4533 | Straight Garden Solar | Faribault, MN | 1.8 GWh |
#4535 | Murray Hill Solar | New Providence, NJ | 1.8 GWh |
#4536 | Grafton Solar | Grafton, MA | 1.8 GWh |
#4537 | Betcher CSG 1, LLC | Goodhue, MN | 1.8 GWh |
#4538 | USG 2 | El Centro, CA | 1.8 GWh |
#4539 | SCS Beltway 011754 Rock Falls, LLC | Rock Falls, IL | 1.8 GWh |
#4540 | FastSun 2 CSG | Randolph Township, MN | 1.8 GWh |
#4541 | Ellettsville Solar RES | Ellettsville, IN | 1.8 GWh |
#4542 | Few Solar | Somers, CT | 1.8 GWh |
#4543 | Acton Solar Landfill | Acton, MA | 1.8 GWh |
#4544 | Erin Garden Solar | City of Green Isle, MN | 1.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SDCWA - Twin Oaks.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Valley | Escondido, CA | 445.7 MWh | 9.4 mi |
CalPeak Power Enterprise Peaker Plant | Escondido, CA | 22.1 GWh | 6.8 mi |
Carlsbad Energy Center | Carlsbad, CA | 326.8 GWh | 10.6 mi |
Encina Water Pollution Control | Carlsbad, CA | 15.6 GWh | 10.9 mi |
Escondido Energy Center | Escondido, CA | 12.1 GWh | 6.6 mi |
GEN005 Antibody Fuel Cell | Oceanside, CA | 18.3 GWh | 7.4 mi |
Genentech-Oceanside Hybrid | Oceanside, CA | 7.4 GWh | 7.5 mi |
Gilead Oceanside Solar Project | Oceanside, CA | 2.0 GWh | 7.7 mi |
Goal Line LP | Escondido, CA | 14.5 GWh | 7.5 mi |
Life Technologies Carlsbad | Carlsbad, CA | 8.5 GWh | 8.4 mi |
NLP Granger | Valley Center, CA | 7.9 GWh | 7.7 mi |
Orange Grove Peaking Facility | Pala, CA | 21.3 GWh | 10.9 mi |
Palomar Energy | Escondido, CA | 1.1 TWh | 6.9 mi |
Red Mountain | Fallbrook, CA | 19.2 GWh | 12.8 mi |
San Diego - NCRC at Vista | Vista, CA | 3.3 GWh | 5.1 mi |
Vallecitos Water District | San Marcos, CA | 4.0 GWh | 0.4 mi |
Valley Center | Valley Center, CA | 6.2 GWh | 9 mi |
Valley Center 1 | Valley Center, CA | 5.9 GWh | 9.9 mi |
Valley Center 2 | Valley Center, CA | 13.1 GWh | 9.9 mi |
Watkins Manufacturing Co. | San Diego, CA | 4.4 GWh | 6 mi |