Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Hopkins Energy LLC | Hopkins Energy LLC | Dike, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 577.0 GWh | May 2024 | Aug 2026 | Solar |
| Dillard Complex | Roseburg Forest Products Co | Dillard, OR | PacifiCorp West (PACW) | 113.8 GWh | Dec 1954 | Dec 2025 | Wood/Wood Waste Solids : 94.8% Natural Gas : 5.2% |
| Steele Flats Wind Project LLC | Steele Flats Wind Project LLC | Diller, NE | Southwest Power Pool (SWPP) | 358.6 GWh | Sep 2013 | Aug 2026 | Wind |
| Dillingham | Nushagak Electric Coop, Inc | Dillingham, AK | 18.3 GWh | Apr 1988 | Dec 2025 | Distillate Fuel Oil | |
| Apex Solar | Apex Solar LLC | Dillon, MT | NorthWestern Corporation (NWMT) | 149.4 GWh | Jul 2023 | Aug 2026 | Solar |
| Whitetail Solar | SolRiver Capital LLC | Dillon, SC | Duke Energy Progress East (CPLE) | 20.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Bethel Wind Farm LLC | Southern Power Co | Dimmitt, TX | Southwest Power Pool (SWPP) | 1.1 TWh | Dec 2016 | Aug 2026 | Wind |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2011 | Dec 2025 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2022 | Dec 2025 | Solar |
| HCE Reams Solar, LLC | Standard Solar | Dinwiddie, VA | PJM Interconnection, LLC (PJM) | 9.1 GWh | Jul 2024 | Dec 2025 | Solar |
| Fort Powhatan Solar | Dominion Renewable Energy | Disputanta, VA | PJM Interconnection, LLC (PJM) | 306.9 GWh | Dec 2021 | Aug 2026 | Solar |
| Holly Spring Meadows | Standard Solar | District Heights, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jun 2023 | Dec 2025 | Solar |
| Townsend Road(CSG) | KSI II Consolidated, LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Oct 2021 | Dec 2025 | Solar |
| TJA-NY- Dix Solar Farm LLC | Dimension Energy LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 802.0 MWh | Nov 2012 | Aug 2026 | Wind |
| NL IL - Maples Road | Standard Solar | Dixon, IL | PJM Interconnection, LLC (PJM) | 867.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Crawford 1 Solar | SRC Partnership 14 LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Crawford 1A Solar | SRC Partnership 14 LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Feb 2025 | Dec 2025 | Solar |
| Lee Energy Facility | Lee County Generating Station - (IL) | Dixon, IL | PJM Interconnection, LLC (PJM) | 65.2 GWh | Apr 2001 | Dec 2025 | Natural Gas |
| Dixon Hydroelectric Dam | Eagle Creek Renewable Energy, LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 12.5 GWh | May 1925 | Dec 2025 | Water |
| Rattlesnake Creek Wind Project | Rattlesnake Creek Wind Project, LLC | Dixon, NE | Southwest Power Pool (SWPP) | 912.7 GWh | Nov 2018 | Aug 2026 | Wind |
| Deadwood Creek | Hydro Sierra Energy, LLC | Dobbins, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 1993 | Dec 2025 | Water |
| Colgate | Yuba County Water Agency - (CA) | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Oct 2025 | Water |
| Hayes Solar, LLC | Hayes Solar, LLC | Dobson, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Dodge Renewables 1 | Dodge Renewables 1, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2022 | Dec 2025 | Solar |
| Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Novel Schmoll Farms Solar CSG | REA Investments, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Oct 2020 | Dec 2025 | Solar |
| Dodge Center Solar | Enel Green Power NA, Inc. | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2016 | Dec 2025 | Solar |
| G McNeilus Wind Farm Dodge Center | Justin McNeilus | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 90.7 GWh | Aug 2002 | Dec 2025 | Wind |
| Fort Dodge | Sunflower Electric Power Corp | Dodge City, KS | Southwest Power Pool (SWPP) | 41.6 GWh | May 1969 | Aug 2026 | Natural Gas |
| Boot Hill Solar | Boot Hill Solar LLC | Dodge City, KS | Southwest Power Pool (SWPP) | 171.6 GWh | - | Aug 2026 | Solar |
| Iron Star Wind Project | Engie North America | Dodge City, KS | Southwest Power Pool (SWPP) | 1.3 TWh | Nov 2021 | Aug 2026 | Wind |
| Beaver Dam Solar | Wisconsin Power & Light Co | Dodge, WI | Midcontinent Independent System Operator, Inc. (MISO) | 102.1 GWh | Nov 2023 | Aug 2026 | Solar |
| Dolgeville Hydro | EONY Generation Limited | Dolgeville, NY | New York Independent System Operator (NYIS) | 11.0 GWh | Jun 1985 | Dec 2025 | Water |
| Seminole (GA) | Terraform Arcadia | Donalsonville, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.2 GWh | Sep 2014 | Dec 2025 | Solar |
| UMass Boston | MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) | Dorchester, MA | ISO New England (ISNE) | 1.0 GWh | Dec 1971 | Dec 2025 | Solar |
| Dorchester Solar Site | Massachusetts Electric Co | Dorchester, MA | ISO New England (ISNE) | 1.6 GWh | Dec 2011 | Dec 2025 | Solar |
| Claude Vandyke | Wolverine Power Supply Coop | Dorr, MI | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Dec 1966 | Dec 2025 | Natural Gas |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 2.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.0 GWh | Sep 2018 | Dec 2025 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Douglas | Arizona Public Service Co | Douglas, AZ | Arizona Public Service Company (AZPS) | 218.0 MWh | Apr 1972 | Dec 2025 | Distillate Fuel Oil |
| ASD Wallum MA Solar LLC(CSG) | ASD Wallum MA Solar LLC | Douglas, MA | ISO New England (ISNE) | 8.7 GWh | Dec 2021 | Dec 2025 | Solar |
| Douglas Solar | RWE Clean Energy | Douglas, MA | ISO New England (ISNE) | 3.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Bellingham PV | Terraform Arcadia | Douglas, MA | ISO New England (ISNE) | 4.2 GWh | Sep 2013 | Dec 2025 | Solar |
| Cedar Springs Wind IV | Cedar Springs Wind IV, LLC | Douglas, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.3 TWh | Dec 2024 | Aug 2026 | Wind |
| Cedar Springs II | PacifiCorp | Douglas, WY | PacifiCorp East (PACE) | 744.2 GWh | Nov 2020 | Aug 2026 | Wind |
| Cedar Springs I | Cedar Springs Wind, LLC | Douglas, WY | PacifiCorp East (PACE) | 744.2 GWh | Nov 2020 | Aug 2026 | Wind |
| Cedar Springs III | Cedar Springs Wind III, LLC | Douglas, WY | PacifiCorp East (PACE) | 490.3 GWh | Nov 2020 | Aug 2026 | Wind |
| Turnipseed Solar, LLC | Southeastern Solar Farm Fund, LLC | Douglasville, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.3 GWh | Oct 2017 | Dec 2025 | Solar |
| Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Aug 2019 | Dec 2025 | Solar |
| Energy Center Dover | Cartier Energy, LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 83.7 GWh | Apr 1985 | Aug 2026 | Natural Gas : 96.9% Distillate Fuel Oil : 3.1% |
| Dover Sun Park | White Oak Solar Energy LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 13.3 GWh | Jun 2011 | Aug 2026 | Solar |
| Garrison Energy Center LLC | Garrison Energy Center LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 2015 | Aug 2026 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| Van Sant Station | NAES Corporation - (DE) | Dover, DE | PJM Interconnection, LLC (PJM) | 3.3 GWh | Apr 1991 | Dec 2025 | Natural Gas : 93.9% Distillate Fuel Oil : 6.1% |
| KE73 CSG | Nautilus Solar Solutions | Dover, DE | PJM Interconnection, LLC (PJM) | 1.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Dover Solar and Battery Storage | Tampa Electric Co | Dover, FL | Tampa Electric Company (TEC) | 47.4 GWh | Nov 2023 | Aug 2026 | Solar |
| Dover (MA) | BWC Buckmaster Pond LLC | Dover, MA | ISO New England (ISNE) | 1.7 GWh | Jul 2017 | Dec 2025 | Solar |
| Cricket Valley Energy | Cricket Valley Energy Center LLC | Dover, NY | New York Independent System Operator (NYIS) | 6.8 TWh | Mar 2020 | Aug 2026 | Natural Gas |
| Wyse Fork Solar Farm, LLC | SunStrong Management | Dover, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Dover (OH) | City of Dover - (OH) | Dover, OH | PJM Interconnection, LLC (PJM) | 55.0 GWh | Dec 1953 | Dec 2025 | Bituminous Coal : 99.1% Natural Gas : 0.9% |
| Dover Peaking | American Mun Power-Ohio, Inc | Dover, OH | PJM Interconnection, LLC (PJM) | 547.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.4 GWh | May 2012 | Dec 2025 | Natural Gas |
| ISH Solar Hospital Downey | Kaiser Permanente | Downey, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2011 | Dec 2025 | Solar |
| Moraine CSG | Moraine Solar, LLC | Downs, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Paradise | Tennessee Valley Authority | Drakesboro, KY | Tennessee Valley Authority (TVA) | 8.1 TWh | Apr 1963 | Aug 2026 | Natural Gas |
| Mon Valley Works | United States Steel-Mon Valley | Dravosburg, PA | PJM Interconnection, LLC (PJM) | 483.2 GWh | May 1943 | Dec 2025 | Blast Furnace Gas : 92.7% Other Gas : 7.3% |
| American Crystal Sugar Drayton | American Crystal Sugar Co | Drayton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 42.8 GWh | Aug 1965 | Dec 2025 | Subbituminous Coal |
| Greenidge Generation LLC | Greenidge Generation Holdings LLC | Dresden, NY | New York Independent System Operator (NYIS) | 624.9 GWh | Nov 1953 | Dec 2025 | Natural Gas |
| Dresden Energy Facility | Appalachian Power Co | Dresden, OH | PJM Interconnection, LLC (PJM) | 3.7 TWh | Jan 2012 | Aug 2026 | Natural Gas |
| Drexel Operations Center | North Carolina Mun Power Agny #1 | Drexel, NC | Duke Energy Carolinas (DUK) | 49.0 MWh | Jul 2007 | Dec 2025 | Distillate Fuel Oil |
| Wallenpaupack | Wallenpuapack Hydro | Drumore, PA | PJM Interconnection, LLC (PJM) | 67.3 GWh | May 1926 | Dec 2025 | Water |
| Twiggs Solar | Onward Energy | Dry Branch, GA | Southern Company Services, Inc. - Trans (SOCO) | 417.9 GWh | Aug 2020 | Aug 2026 | Solar |
| ADS Renewable Energy-Wolf Creek LLC | ADS Renewable Energy- Wolf Creek, LLC | Dry Branch, GA | Southern Company Services, Inc. - Trans (SOCO) | 11.8 GWh | Oct 2011 | Dec 2025 | Landfill Gas |
| Crittenden Solar Facility | Duke Energy Kentucky Inc | Dry Ridge, KY | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Dryden Rd #2 Community Solar Farm CSG | Scale Sustainable I, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Nov 2019 | Dec 2025 | Solar |
| Tompkins Cortland Community College | SEC LHNY Solar One, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Apr 2015 | Sep 2025 | Solar |
| Flat Water Wind Farm LLC | Flat Water Wind Farm LLC | Du Bois, NE | Southwest Power Pool (SWPP) | 203.9 GWh | Nov 2010 | Dec 2025 | Wind |
| Kimmel Road Solar, LLC | Birch Creek Power, LLC | Du Quoin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 114.6 GWh | Sep 2024 | Aug 2026 | Solar |
| Princetown Solar 1 | AES Clean Energy | Duanesburg, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Duanesburg | Onyx Asset Services Group | Duanesburg, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Mar 2018 | Dec 2025 | Solar |
| Santa Rita Jail Hybrid | County of Alameda GSA - (CA) | Dublin, CA | California Independent System Operator (CISO) | 10.4 GWh | Aug 2001 | Dec 2025 | Natural Gas : 77.7% Solar : 22.3% |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 8.1 GWh | Nov 2016 | Dec 2025 | Natural Gas |
| Dublin Solar I | AES Distributed Energy | Dublin, GA | Southern Company Services, Inc. - Trans (SOCO) | 6.5 GWh | Mar 2015 | Dec 2025 | Solar |
| WestRock Southeast, LLC. | WestRock Southeast, LLC | Dublin, GA | Southern Company Services, Inc. - Trans (SOCO) | 115.1 GWh | May 1989 | Aug 2026 | Natural Gas : 41.5% Wood/Wood Waste Solids : 31.9% Tire-derived Fuels : 24.4% Other Biomass Solids : 2.1% |
| Silver Star I Wind Power Project | Silver Star I Power Partners LLC | Dublin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 204.9 GWh | Aug 2008 | Dec 2025 | Wind |
| New River | Ingenco Renewable Development, LLC | Dublin, VA | PJM Interconnection, LLC (PJM) | 11.6 GWh | Aug 2013 | Dec 2025 | Landfill Gas : 94.7% Distillate Fuel Oil : 5.3% |
| West Dubuque Solar | Interstate Power and Light Co | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Aug 2017 | Dec 2025 | Solar |
| Alliant SBD 9205 A Y McDonald | Industrial Energy Applications Inc | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 16.7 MWh | Feb 1990 | Dec 2025 | Distillate Fuel Oil |
| Alliant SBD 9301 Prairie Farms | Industrial Energy Applications Inc | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 68.6 MWh | Jun 1993 | Dec 2025 | Distillate Fuel Oil |
| John Deere Dubuque Works | John Deere Dubuque Works | Dubuque, IA | Midcontinent Independent System Operator, Inc. (MISO) | 54.0 MWh | May 1994 | Aug 2026 | Distillate Fuel Oil |
| CED Ducor 3 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 38.4 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 2 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 1 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 4 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 711.8 GWh | Jan 2025 | Aug 2026 | Solar |
| Dudley | AMP MA Dudley | Dudley, MA | ISO New England (ISNE) | 7.5 GWh | Jun 2018 | Dec 2025 | Solar |
| Dudley Landfill Solar LLC | Dudley Landfill Solar LLC | Dudley, MA | ISO New England (ISNE) | 1.2 GWh | Apr 2025 | Dec 2025 | Solar |
| Dudley Solar CSG | Dudley Solar, LLC | Dudley, MA | ISO New England (ISNE) | 2.8 GWh | Jul 2017 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |