New River
7148 Cloyds Mountain Road, Dublin, VA 24084Plant Summary Information
New River is ranked #9 out of 14 landfill gas power plants in Virginia in terms of total annual net electricity generation.
New River is comprised of 18 generators and generated 3.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | New River |
|---|---|
| Utility Name | Ingenco Renewable Development, LLC |
| Location | Pulaski County, VA |
| Initial Operation Date | September 2013 |
| Last Update | Dec 2025 |
| Annual Generation | 11.6 GWh |
| Annual Consumption | 143.3 k MMBtu |
| Ranked #6,003 out of 13,081 Power Plants Nationwide | |
| Ranked #189 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #152 out of 243 Virginia Power Plants | |
| Ranked #9 out of 14 Virginia Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas : 94.7% Distillate Fuel Oil : 5.3% |
Map of New River
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New River.
Monthly Net Generation for New River
Monthly Plant Fuel Consumption for New River
New River Details
| Summary Information | |
|---|---|
| Plant Name | New River (59845) |
| Plant Address | 7148 Cloyds Mountain Road, Dublin, VA 24084 |
| Utility | Ingenco Renewable Development, LLC (59452) |
| Latitude, Longitude | 37.183, -80.699 |
| Generation Dates on File | Jan 2015 to Dec 2025 |
| Initial Operation Date | September 2013 |
| Annual Generation | 11.6 GWh |
| Fuel Types | Landfill Gas : 94.7% Distillate Fuel Oil : 5.3% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Appalachian Power Co (733) VA |
| Grid Voltage | 25.00 kV |
| Energy Storage | No |
Generator E1 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E10 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E11 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E12 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E13 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E14 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E15 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E16 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E17 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E18 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E2 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E3 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E4 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E5 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E6 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E7 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E8 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
Generator E9 Details Operating September 2013
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1165480777 |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas / Distillate Fuel Oil |
| Startup Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | DFO / LFG |
|---|---|
New River Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #179 | Frederick County LFGTE Facility | Winchester, VA | 12.2 GWh |
| #180 | MMSD Jones Island Wastewater | Milwaukee, WI | 83.3 GWh |
| #181 | Lee County Landfill | Bishopville, SC | 11.8 GWh |
| #182 | ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 11.8 GWh |
| #183 | Berlin Landfill Gas | Berlin, WI | 11.6 GWh |
| #184 | Waxdale | Sturtevant, WI | 37.2 GWh |
| #185 | Nodal Power | Sunland Park, NM | 11.4 GWh |
| #186 | Davidson Gas Producers LLC | Lexington, NC | 11.3 GWh |
| #187 | Onslow Power Producers | Jacksonville, NC | 11.2 GWh |
| #188 | Black Oak Power Producers | Hartville, MO | 11.0 GWh |
| #190 | BMW Manufacturing Co | Greer, SC | 12.2 GWh |
| #191 | Oak Grove Power Producers | Arcadia, KS | 10.9 GWh |
| #192 | Tullytown | Morrisville, PA | 10.8 GWh |
| #193 | Lake Gas Recovery | Northbrook, IL | 10.8 GWh |
| #194 | Tazewell Gas Recovery | East Peoria, IL | 10.7 GWh |
| #195 | Seminole Energy | Geneva, FL | 10.6 GWh |
| #196 | Cold Canyon 1 | San Luis Obispo, CA | 10.6 GWh |
| #197 | CII Methane Management IV, LLC | Smithfield, NC | 10.5 GWh |
| #198 | GLRA Landfill | Lebanon, PA | 10.4 GWh |
| #199 | Mas Durham Power, LLC | Durham, NC | 10.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New River.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ararat Rock Solar, LLC | Mount Airy, NC | 5.6 GWh | 50.2 mi |
| Buck Hydro | Ivanhoe, VA | 19.6 GWh | 29.1 mi |
| Byllesby 2 | Ivanhoe, VA | 8.1 GWh | 30.3 mi |
| Caden Energix Wytheville LLC | Wytheville, VA | 37.9 GWh | 24.5 mi |
| Celanese Acetate LLC | Narrows, VA | 157.8 GWh | 11.7 mi |
| Claytor | Radford, VA | 194.0 GWh | 9.8 mi |
| COC Surry LFG, LLC | Mount Airy, NC | 8.3 GWh | 51.9 mi |
| Green Acres (VA) | Bassett, VA | 9.6 GWh | 49.9 mi |
| Mayberry Solar LLC | Mt. Airy, NC | 1.5 GWh | 49.1 mi |
| New River Clean Energy | Beckley, WV | 6.8 GWh | 50.6 mi |
| Niagara | Vinton, VA | 6.5 GWh | 45.6 mi |
| Pinnacles | Ararat, VA | 21.8 GWh | 38.3 mi |
| Radford | Radford, VA | 5.0 GWh | 10 mi |
| Radford Army Ammunition Plant | Radford, VA | 32.0 GWh | 8.6 mi |
| River Trail Solar, LLC | Galax, VA | 16.4 GWh | 34.3 mi |
| Salem Electric Department | Salem, VA | 79.0 MWh | 35.4 mi |
| Salem Street Dept | Salem, VA | 94.0 MWh | 36.6 mi |
| Salem Water Plant | Salem, VA | 96.0 MWh | 35 mi |
| Virginia Tech Power Plant | Blacksburg, VA | 10.5 GWh | 15.7 mi |
| Wythe County Solar | Wythe County, VA | 151.3 GWh | 22.5 mi |