Silver Star I Wind Power Project
10893 CR397, Dublin, TX 76446Plant Summary Information
Silver Star I Wind Power Project is ranked #191 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Silver Star I Wind Power Project generated 57.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Silver Star I Wind Power Project |
|---|---|
| Utility Name | Silver Star I Power Partners LLC |
| Location | Erath County, TX |
| Initial Operation Date | September 2008 |
| Last Update | Dec 2025 |
| Annual Generation | 204.9 GWh |
| Annual Consumption | 755.6 k MMBtu |
| Ranked #2,504 out of 13,081 Power Plants Nationwide | |
| Ranked #742 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #464 out of 852 Texas Power Plants | |
| Ranked #191 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
AE Power Services LLC (2013 to 2017) Silver Star I Power Partners LLC (2018 to 2025) |
Map of Silver Star I Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Silver Star I Wind Power Project.
Monthly Net Generation for Silver Star I Wind Power Project
Monthly Plant Fuel Consumption for Silver Star I Wind Power Project
Silver Star I Wind Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Silver Star I Wind Power Project (56771) |
| Plant Address | 10893 CR397, Dublin, TX 76446 |
| Utility | Silver Star I Power Partners LLC (62076) |
| Latitude, Longitude | 32.33866, -98.47605 |
| Generation Dates on File | May 2008 to Dec 2025 |
| Initial Operation Date | September 2008 |
| Annual Generation | 204.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 08-69-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating September 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 52.8 MW |
| Summer Capacity | 52.8 MW |
| Winter Capacity | 52.8 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2008 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 24 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 24 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Silver Star I Wind Power Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| UBS Asset Management (Americas) Inc | 1285 Avenue of the Americas, 12th Floor, New York, NY 10019 | 33.40% |
| Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC | 3948 Legacy Drive, Ste. 106 #306, Plano, TX 75023 | 66.60% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #732 | Gratiot Wind Park | Breckenridge, MI | 214.1 GWh |
| #733 | Weaver Wind | Township 16, ME | 213.9 GWh |
| #734 | Blue Canyon Windpower VI LLC | Carnegie, OK | 212.3 GWh |
| #735 | Laredo Ridge Wind LLC | Petersburg, NE | 211.6 GWh |
| #736 | Sky River Wind Energy Center | Tehachapi, CA | 211.5 GWh |
| #737 | Hog Creek Wind Project | Ada, OH | 211.1 GWh |
| #738 | Bliss (NY) | Bliss, NY | 206.6 GWh |
| #739 | NaturEner Glacier Wind Energy 2 | Ethridge, MT | 205.6 GWh |
| #740 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 205.5 GWh |
| #741 | Cohocton Wind Project | Cohocton, NY | 205.5 GWh |
| #743 | Independence Wind Farm | Manchester, IA | 204.7 GWh |
| #744 | Pinyon Pine II | Mojave, CA | 204.3 GWh |
| #745 | Flat Water Wind Farm LLC | Du Bois, NE | 203.9 GWh |
| #746 | Star Point Wind Project LLC | Wasco, OR | 201.3 GWh |
| #747 | North Allegheny Windpower Project | Lilly, PA | 201.3 GWh |
| #748 | Coachella Hills Wind | Palm Springs, CA | 201.2 GWh |
| #749 | Wilton Wind II LLC | Wilton, ND | 201.1 GWh |
| #750 | Chateaugay | Chateaugay, NY | 200.8 GWh |
| #751 | Bluegrass Ridge | King City, MO | 199.7 GWh |
| #752 | Arlington Wind Power Project | Arlington, OR | 199.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Silver Star I Wind Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barton Chapel Wind Farm | Jacksboro, TX | 127.5 GWh | 50 mi |
| BMP Wind (TX) | Baird, TX | 944.2 GWh | 47.7 mi |
| Buckthorn Wind | Mingus, TX | 368.4 GWh | 6.2 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 538.3 GWh | 40.3 mi |
| Comanche Peak | Glen Rose, TX | 20.0 TWh | 40.4 mi |
| DeCordova Steam Electric Station | Granbury, TX | 48.8 GWh | 45.5 mi |
| Flat Top Wind I | Mullin, TX | 787.2 GWh | 45.8 mi |
| Grizzly Ridge Solar | Hamilton County, TX | 126.1 GWh | 44.2 mi |
| Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 291.7 GWh | 49.4 mi |
| La Casa Wind | Ranger, TX | 300.7 GWh | 23.6 mi |
| Logans Gap Wind LLC | Comanche, TX | 599.2 GWh | 37.8 mi |
| R W Miller | Palo Pinto, TX | 586.3 GWh | 24.1 mi |
| Ranchland Wind Project I | Cisco, TX | 449.1 GWh | 40.2 mi |
| Ranchland Wind Project II | Cisco, TX | 511.0 GWh | 40.2 mi |
| Roadrunner Wind Farm | Cisco, TX | 960.8 GWh | 37.5 mi |
| Sequoia 1 | Cisco, TX | 380.9 GWh | 40.4 mi |
| TPE Erath Solar, LLC | Stephenville, TX | 23.7 GWh | 16.5 mi |
| Walnut Springs Solar | Walnut Springs, TX | 9.0 GWh | 45.1 mi |
| Wolf Hollow I LP | Granbury, TX | 3.1 TWh | 43.5 mi |
| Wolf Hollow II | Granbury, TX | 4.9 TWh | 43.3 mi |