Cedar Springs I
TBD, Douglas, WY 82633Plant Summary Information
Cedar Springs I is ranked #13 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
Cedar Springs I generated 222.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cedar Springs I |
|---|---|
| Utility Name | Cedar Springs Wind, LLC |
| Location | Converse County, WY |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 699.7 GWh |
| Annual Consumption | 2.7 M MMBtu |
| Ranked #1,001 out of 12,613 Power Plants Nationwide | |
| Ranked #201 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #13 out of 74 Wyoming Power Plants | |
| Ranked #6 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Cedar Springs I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Springs I.
Monthly Net Generation for Cedar Springs I
Monthly Plant Fuel Consumption for Cedar Springs I
Cedar Springs I Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Springs I (63914) |
| Plant Address | TBD, Douglas, WY 82633 |
| Utility | Cedar Springs Wind, LLC (63580) |
| Latitude, Longitude | 43.01971, -105.47214 |
| Generation Dates on File | Aug 2020 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 699.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 82633 Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 72 |
| Turbine Details | |
| Number Of Turbines | 72 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 12 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 291 |
Cedar Springs I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #191 | FPL Energy Crystal Lake Wind II LLC | Britt, IA | 721.5 GWh |
| #192 | Cross Winds Energy Park | Unionville, MI | 720.9 GWh |
| #193 | Mammoth Plains | Oakwood, OK | 719.9 GWh |
| #194 | Turtle Creek Wind Farm LLC | St. Ansgar, IA | 719.9 GWh |
| #195 | Amadeus Wind Farm | Rotan, TX | 716.5 GWh |
| #196 | Lockett Windfarm | Vernon, TX | 710.2 GWh |
| #197 | Klondike Windpower III | Wasco, OR | 706.8 GWh |
| #198 | Panther Creek Wind Farm Three | Big Spring, TX | 706.2 GWh |
| #199 | East Fork Wind Project, LLC | Colby, KS | 703.7 GWh |
| #200 | Goodwell Wind Project LLC | Goodwell, OK | 701.0 GWh |
| #202 | Appaloosa Run Wind | Rankin, TX | 699.1 GWh |
| #203 | Maple Ridge Wind Farm | Lowville, NY | 698.1 GWh |
| #204 | Longhorn Wind | Silverton, TX | 697.0 GWh |
| #205 | Griffin Trail Wind | E Seymour, TX | 696.6 GWh |
| #206 | Marengo Wind Plant | Dayton, WA | 692.7 GWh |
| #207 | Cedar Point Wind | Limon, CO | 692.6 GWh |
| #208 | Sholes Wind Energy Center | Randolph, NE | 692.1 GWh |
| #209 | Wildorado Wind LLC | Vega, TX | 692.1 GWh |
| #210 | Rattlesnake Den | Garden City, TX | 689.3 GWh |
| #211 | Cedar Creek Wind | Grover, CO | 688.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Springs I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 71.1 mi |
| Anticline Wind | Casper, WY | 386.9 GWh | 45 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 50.8 mi |
| Campbell Hill Windpower | Glenrock, WY | 253.7 GWh | 26.6 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 39 mi |
| Cedar Springs II | Douglas, WY | 652.4 GWh | 6.4 mi |
| Cedar Springs III | Douglas, WY | 475.4 GWh | 6.9 mi |
| Cedar Springs Wind IV | Douglas, WY | 1.1 TWh | 13.3 mi |
| Dave Johnston | Glen Rock, WY | 4.3 TWh | 19.9 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 76 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 76.9 mi |
| Glendo | Glendo, WY | 87.7 GWh | 46.3 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 18.3 mi |
| Guernsey | Guernsey, WY | 18.0 GWh | 62 mi |
| Hartzog | Wright, WY | 178.0 MWh | 56 mi |
| Laramie River Station | Wheatland, WY | 9.1 TWh | 69.7 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 28.4 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 19.5 mi |
| TB Flats | Medicine Bow, WY | 1.4 TWh | 69.9 mi |
| Top of the World Windpower Project | Glenrock, WY | 495.8 GWh | 17.2 mi |