UMass Boston
100 Morrisssey Blvd., Dorchester, MA 2125Plant Summary Information
UMass Boston is ranked #510 out of 522 solar farms in Massachusetts in terms of total annual net electricity generation.
UMass Boston generated 163.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | UMass Boston |
|---|---|
| Utility Name | MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) |
| Location | Suffolk County, MA |
| Initial Operation Date | January 1972 |
| Last Update | Dec 2024 |
| Annual Generation | 1.1 GWh |
| Annual Consumption | 4.0 k MMBtu |
| Ranked #11,415 out of 12,539 Power Plants Nationwide | |
| Ranked #6,065 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #607 out of 629 Massachusetts Power Plants | |
| Ranked #510 out of 522 Massachusetts Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
UMass Boston (2021 to 2023) MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) (2024 to 2024) |
Map of UMass Boston
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UMass Boston.
Monthly Net Generation for UMass Boston
UMass Boston Details
| Summary Information | |
|---|---|
| Plant Name | UMass Boston (64980) |
| Plant Address | 100 Morrisssey Blvd., Dorchester, MA 2125 |
| Utility | MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) (67085) |
| Latitude, Longitude | 42.31298, -71.03637 |
| Generation Dates on File | Jan 2021 to Dec 2024 |
| Initial Operation Date | January 1972 |
| Annual Generation | 1.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
| Grid Voltage | 13.80 kV |
| Energy Storage | Yes |
Generator 020G Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 080D1 Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 080D2 Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 080G Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 090G Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 110G Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.2 MW |
| Winter Capacity | 0.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 120G Details Operating January 1972
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.2 MW |
| Winter Capacity | 0.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 200G Details Operating January 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.1 MW |
| Winter Capacity | 0.1 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1999 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 050G Details Operating January 2001
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2001 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 160G Details Operating January 2001
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.1 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.1 MW |
| Winter Capacity | 0.1 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2001 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 010G Details Standby January 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
|---|---|
| Synchronized To Transmission Grid | No |
| First Operation Date | January 2006 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 060G Details Operating January 2012
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2012 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 030G Details Operating January 2014
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2014 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RHG Details Operating January 2017
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2017 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator WG Details Operating January 2018
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2018 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator BATT1 Details Operating January 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.1 |
|---|---|
| Maximum Charge Rate | 0.5 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.5 |
| Storage Enclosure Type | BL |
| System Peak Shaving | P |
| Load Management | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64980 / 64980 |
| Direct Support Gen Id | SOL1 / SOL2 |
| Support T D Asset | No |
Generator SOL1 Details Operating January 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.2 MW |
| Summer Capacity | 0.2 MW |
| Winter Capacity | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 221 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.2 MW |
| Virtual Net Metering Agreement | No |
Generator SOL2 Details Operating January 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 300 |
| Tilt Angle | 0.3 |
| DC Net Capacity | 0.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.7 MW |
| Virtual Net Metering Agreement | No |
UMass Boston Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6055 | MA Solar Storage 1 Hybrid | Sterling, MA | 1.1 GWh |
| #6056 | Industry MetroLink PV 1 | Industry, CA | 1.1 GWh |
| #6057 | SV Gardner 1 (Lutz) CSG | Gardner, IL | 1.1 GWh |
| #6058 | 500 Virginia Solar | Ft. Washington, PA | 1.1 GWh |
| #6059 | Harmon DC Totowa NJ | Totowa, NJ | 1.1 GWh |
| #6060 | Patriots Stadium | Bridgewater, NJ | 1.1 GWh |
| #6061 | Decatur Co. Solar RES (IN) | Greensburg, IN | 1.1 GWh |
| #6062 | Warrior Solar Partners | Frankfort, NY | 1.1 GWh |
| #6063 | Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh |
| #6064 | Fareway Customer Hosted 1 MW Solar | Boone, IA | 1.1 GWh |
| #6066 | SunEdison LV Sutton Plant Site | Wilmington, NC | 1.1 GWh |
| #6068 | MLH 3 | Gainesville, FL | 1.1 GWh |
| #6069 | Martins Creek Solar NC, LLC | Murphy, NC | 1.1 GWh |
| #6070 | Roger Road WWTP | Tucson, AZ | 1.1 GWh |
| #6071 | Nordhoff Place | Chatsworth, CA | 1.1 GWh |
| #6072 | CVEC Round 4 Brewster Captn Golf Course | Brewster, MA | 1.1 GWh |
| #6073 | Google Bayhill Solar PV and Microgrid | San Bruno, CA | 1.0 GWh |
| #6074 | IGS LAS1 | Henderson, NV | 1.1 GWh |
| #6075 | Onondaga County - Metro Water Board | Clay, NY | 1.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UMass Boston.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boston Medical Center CHP Plant | Boston, MA | 14.2 GWh | 2.4 mi |
| Boston Scientific Solar | Quincy, MA | 1.5 GWh | 1.4 mi |
| Braintree Landfill Solar | Braintree, MA | 1.2 GWh | 7.6 mi |
| Charlestown Wind Turbine | Charlestown, MA | 1.2 GWh | 5.7 mi |
| CoreSite - Somerville | Somerville, MA | 4.5 GWh | 4.9 mi |
| Deer Island Treatment Plant | Winthrop, MA | 33.4 GWh | 4.7 mi |
| Dorchester Solar Site | Dorchester, MA | 1.5 GWh | 1 mi |
| Fore River Generating Station | North Weymouth, MA | 3.1 TWh | 6.1 mi |
| General Electric Aircraft Engines | Lynn, MA | 2.5 GWh | 10 mi |
| Gillette SBMC | Boston, MA | 54.9 GWh | 2.3 mi |
| Kendall Square Station | Cambridge, MA | 1.5 TWh | 4.1 mi |
| M Street Jet | Boston, MA | 457.0 MWh | 1.8 mi |
| Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.8 GWh | 4.4 mi |
| Meadow Solar | Boston, MA | 4.3 GWh | 7.6 mi |
| Medical Area Total Energy Plant | Boston, MA | 318.1 GWh | 4 mi |
| Mystic Generating Station | Charlestown, MA | 1.8 TWh | 5.6 mi |
| Potter Station 2 | Braintree, MA | 23.3 GWh | 6.4 mi |
| Randolph | Randolph, MA | 6.0 GWh | 9.6 mi |
| Signature Breads Chelsea | Chelsea, MA | 2.0 MWh | 5.6 mi |
| Wheelabrator Saugus | Saugus, MA | 226.1 GWh | 9.7 mi |