Iron Star Wind Project
11290 Saddle Road, Dodge City, KS 67801Plant Summary Information
Iron Star Wind Project is ranked #25 out of 1,344 wind farms nationwide in terms of total annual net electricity generation.
Iron Star Wind Project generated 322.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Iron Star Wind Project |
---|---|
Utility Name | Engie North America |
Location | Ford County, KS |
Initial Operation Date | December 2021 |
Last Update | Mar 2025 |
Annual Generation | 1.3 TWh |
Annual Consumption | 4.7 M MMBtu |
Ranked #638 out of 11,623 Power Plants Nationwide | |
Ranked #25 out of 1,344 Wind Power Plants Nationwide | |
Ranked #8 out of 148 Kansas Power Plants | |
Ranked #2 out of 50 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Iron Star Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iron Star Wind Project.
Monthly Net Generation for Iron Star Wind Project
Iron Star Wind Project Details
Summary Information | |
---|---|
Plant Name | Iron Star Wind Project (64003) |
Plant Address | 11290 Saddle Road, Dodge City, KS 67801 |
Utility | Engie North America (56201) |
Latitude, Longitude | 37.64875, -99.98094 |
Generation Dates on File | Dec 2021 to Mar 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 1.3 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Great Plains, LLC (56526) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WTG1 Details Operating December 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 297.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 297.6 MW |
Winter Capacity | 297.6 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 62 |
Turbine Details | |
Number Of Turbines | 62 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N149/4.0-4.5 |
Design Wind Speed | 21.5 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 351 |
Iron Star Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#15 | Young Wind | Graham, TX | 1.6 TWh |
#16 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.6 TWh |
#17 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
#18 | Grande Prairie Wind Farm | O'Neill, NE | 1.5 TWh |
#19 | TB Flats | Medicine Bow, WY | 1.5 TWh |
#20 | Beaver Creek Wind | Ogden, IA | 1.4 TWh |
#21 | Maverick Creek Wind | Eden, TX | 1.4 TWh |
#22 | North English | Montezuma, IA | 1.4 TWh |
#23 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
#24 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.3 TWh |
#26 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
#27 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
#28 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.2 TWh |
#29 | Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh |
#30 | Sage Draw Wind | Wilson, TX | 1.2 TWh |
#31 | Santa Rita East | Barnhart, TX | 1.2 TWh |
#32 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
#33 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
#34 | Mesquite Star | Roscoe, TX | 1.2 TWh |
#35 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iron Star Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashland | Ashland, KS | 27.0 MWh | 33.6 mi |
Bloom Wind | Minneola, KS | 651.3 GWh | 11.6 mi |
Bonanza BioEnergy LLC | Garden City, KS | 6.1 GWh | 51.4 mi |
Cimarron Bend III | Minneola, KS | 543.1 GWh | 19.2 mi |
Cimarron Bend Wind Project I, LLC | Minneola, KS | 846.1 GWh | 20.3 mi |
Cimarron Bend Wind Project II, LLC | Minneola, KS | 784.1 GWh | 20.3 mi |
Cimarron Wind Energy LLC | Cimmaron, KS | 448.0 GWh | 22.6 mi |
Cimarron Windpower II | Cimarron, KS | 475.5 GWh | 27.6 mi |
Ensign Wind LLC | Montezuma, KS | 483.0 GWh | 16.5 mi |
Fort Dodge | Dodge City, KS | 98.5 GWh | 6.1 mi |
Gray County Wind Energy | Montezuma, KS | 304.3 GWh | 21.9 mi |
Greensburg | Greensburg, KS | 13.0 GWh | 35.5 mi |
Ironwood Wind | Spearville, KS | 514.3 GWh | 16.2 mi |
Jameson Energy Center | Garden City, KS | 1.1 GWh | 51 mi |
Jetmore | Jetmore, KS | 61.0 MWh | 30.2 mi |
Meade | Meade, KS | 105.0 MWh | 31.7 mi |
Shooting Star | Mullinville, KS | 192.4 GWh | 30.6 mi |
Spearville | Ford, KS | 208.9 GWh | 19.4 mi |
Spearville 3 LLC | Spearville, KS | 198.2 GWh | 16 mi |
Western Plains Wind Farm | Spearville, KS | 1.1 TWh | 21.8 mi |