Iron Star Wind Project
11290 Saddle Road, Dodge City, KS 67801Plant Summary Information
Iron Star Wind Project is ranked #27 out of 1,370 wind farms nationwide in terms of total annual net electricity generation.
Iron Star Wind Project generated 294.6 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Iron Star Wind Project |
|---|---|
| Utility Name | Engie North America |
| Location | Ford County, KS |
| Initial Operation Date | December 2021 |
| Last Update | Nov 2025 |
| Annual Generation | 1.2 TWh |
| Annual Consumption | 4.6 M MMBtu |
| Ranked #656 out of 12,574 Power Plants Nationwide | |
| Ranked #27 out of 1,370 Wind Power Plants Nationwide | |
| Ranked #8 out of 174 Kansas Power Plants | |
| Ranked #2 out of 52 Kansas Wind Power Plants | |
| Fuel Types | Wind |
Map of Iron Star Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iron Star Wind Project.
Monthly Net Generation for Iron Star Wind Project
Iron Star Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Iron Star Wind Project (64003) |
| Plant Address | 11290 Saddle Road, Dodge City, KS 67801 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 37.64875, -99.98094 |
| Generation Dates on File | Dec 2021 to Nov 2025 |
| Initial Operation Date | December 2021 |
| Annual Generation | 1.2 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | ITC Great Plains, LLC (56526) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WTG1 Details Operating December 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 297.6 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 297.6 MW |
| Winter Capacity | 297.6 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 62 |
| Turbine Details | |
| Number Of Turbines | 62 |
|---|---|
| Predominant Turbine Manufacturer | Nordex |
| Predominant Turbine Model Number | N149/4.0-4.5 |
| Design Wind Speed | 21.5 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 351 |
Iron Star Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #17 | Grande Prairie Wind Farm | O'Neill, NE | 1.5 TWh |
| #18 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh |
| #19 | Palo Alto Wind Farm | Emmetsburg, IA | 1.4 TWh |
| #20 | TB Flats | Medicine Bow, WY | 1.4 TWh |
| #21 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
| #22 | North English | Montezuma, IA | 1.3 TWh |
| #23 | Beaver Creek Wind | Ogden, IA | 1.3 TWh |
| #24 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh |
| #25 | Santa Rita East | Barnhart, TX | 1.2 TWh |
| #26 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
| #28 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
| #29 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
| #30 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.2 TWh |
| #31 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
| #32 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
| #33 | Seven Cowboy Wind Project, LLC | Gage, OK | 1.2 TWh |
| #34 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
| #35 | Tahoka Wind | Tahoka, TX | 1.1 TWh |
| #36 | Sage Draw Wind | Wilson, TX | 1.1 TWh |
| #37 | Arbor Hill Wind Farm | Greenfield, IA | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iron Star Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ashland | Ashland, KS | 24.0 MWh | 33.6 mi |
| Bloom Wind | Minneola, KS | 584.0 GWh | 11.6 mi |
| Cimarron Bend III | Minneola, KS | 578.1 GWh | 19.2 mi |
| Cimarron Bend Wind Project I, LLC | Minneola, KS | 753.5 GWh | 20.3 mi |
| Cimarron Bend Wind Project II, LLC | Minneola, KS | 762.2 GWh | 20.3 mi |
| Cimarron Wind Energy LLC | Cimmaron, KS | 397.6 GWh | 22.6 mi |
| Cimarron Windpower II | Cimarron, KS | 284.9 GWh | 27.6 mi |
| CMS-Coldwater | Coldwater, KS | 2.5 GWh | 42.3 mi |
| Ensign Wind LLC | Montezuma, KS | 464.2 GWh | 16.5 mi |
| Fort Dodge | Dodge City, KS | 44.1 GWh | 6.1 mi |
| Gray County Wind Energy | Montezuma, KS | 264.1 GWh | 21.9 mi |
| Greensburg | Greensburg, KS | 10.5 GWh | 35.5 mi |
| Greensburg Solar | Greensburg, KS | 2.3 GWh | 36.4 mi |
| Ironwood Wind | Spearville, KS | 251.7 GWh | 16.2 mi |
| Jetmore | Jetmore, KS | 117.0 MWh | 30.2 mi |
| Meade | Meade, KS | 85.0 MWh | 31.7 mi |
| Shooting Star | Mullinville, KS | 187.2 GWh | 30.6 mi |
| Spearville | Ford, KS | 133.6 GWh | 19.4 mi |
| Spearville 3 LLC | Spearville, KS | 170.4 GWh | 16 mi |
| Western Plains Wind Farm | Spearville, KS | 1.0 TWh | 21.8 mi |