Cedar Springs II
TBD, Douglas, WY 82633Plant Summary Information
Cedar Springs II is ranked #15 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Cedar Springs II generated 180.4 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Cedar Springs II |
---|---|
Utility Name | PacifiCorp |
Location | Converse County, WY |
Initial Operation Date | December 2020 |
Last Update | Mar 2025 |
Annual Generation | 622.5 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,081 out of 11,623 Power Plants Nationwide | |
Ranked #250 out of 1,344 Wind Power Plants Nationwide | |
Ranked #15 out of 69 Wyoming Power Plants | |
Ranked #5 out of 31 Wyoming Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Cedar Springs Transmission, LLC (2019 to 2019) PacifiCorp (2020 to 2023) |
Map of Cedar Springs II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Springs II.
Monthly Net Generation for Cedar Springs II
Cedar Springs II Details
Summary Information | |
---|---|
Plant Name | Cedar Springs II (63915) |
Plant Address | TBD, Douglas, WY 82633 |
Utility | PacifiCorp (14354) |
Latitude, Longitude | 42.96901, -105.36562 |
Generation Dates on File | Dec 2020 to Mar 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 622.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) WY |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 82634 Details Operating December 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 198.8 MW |
Winter Capacity | 198.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 72 |
Turbine Details | |
Number Of Turbines | 72 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 292 |
Cedar Springs II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#240 | Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh |
#241 | South Plains Wind Phase I | Floydada, TX | 634.2 GWh |
#242 | Raymond Wind Farm, LLC | Lyford, TX | 633.6 GWh |
#243 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 632.9 GWh |
#244 | Coyote Wind LLC | Snyder, TX | 632.1 GWh |
#245 | Patriot Wind Farm | Bishop, TX | 632.0 GWh |
#246 | Wild Horse | Ellensburg, WA | 631.0 GWh |
#247 | Tatanka Ridge | Toronto, SD | 627.1 GWh |
#248 | Caney River Wind Project | Howard, KS | 626.6 GWh |
#249 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#251 | FPL Energy Crystal Lake Wind LLC | Britt, IA | 618.3 GWh |
#252 | Cedar Creek II | New Raymer, CO | 617.6 GWh |
#253 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
#254 | Moraine Sands Wind Power | Mason City, IL | 615.0 GWh |
#255 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#256 | Chevelon Butte Wind Farm | Winslow, AZ | 614.3 GWh |
#257 | Boiling Springs Wind Farm | Woodward, OK | 609.4 GWh |
#258 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#259 | Prairie Wind Farm | Montezuma, IA | 608.2 GWh |
#260 | English Farms | Montezuma, IA | 605.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Springs II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alcova | Alcova, WY | 68.1 GWh | 74.5 mi |
Anticline Wind | Casper, WY | 125.8 GWh | 51 mi |
Barber Creek | Gillette, WY | 359.0 MWh | 55.8 mi |
Boswell Wind | Rock River, WY | 395.5 GWh | 77 mi |
Campbell Hill Windpower | Glenrock, WY | 289.9 GWh | 32.2 mi |
Casper Wind Farm | Evansville, WY | 5.7 GWh | 43.7 mi |
Cedar Springs I | Douglas, WY | 734.0 GWh | 6.4 mi |
Cedar Springs III | Douglas, WY | 513.1 GWh | 13.3 mi |
Cedar Springs Wind IV | Douglas, WY | 208.6 GWh | 19.7 mi |
Dave Johnston | Glen Rock, WY | 4.1 TWh | 22.7 mi |
Dunlap | Medicine Bow, WY | 432.0 GWh | 75.7 mi |
Ekola Flats | Hanna, WY | 776.6 GWh | 87.7 mi |
Fremont Canyon | Alcova, WY | 176.3 GWh | 80.2 mi |
Glenrock | Glenrock, WY | 314.1 GWh | 24 mi |
Hartzog | Wright, WY | 318.0 MWh | 60 mi |
Laramie River Station | Wheatland, WY | 7.6 TWh | 64.3 mi |
Pioneer Wind Park, LLC | Glenrock, WY | 226.3 GWh | 30.4 mi |
Rolling Hills | Glenrock, WY | 187.8 GWh | 25.4 mi |
TB Flats | Medicine Bow, WY | 1.5 TWh | 70.3 mi |
Top of the World Windpower Project | Glenrock, WY | 449.2 GWh | 21.5 mi |