Cedar Springs II
TBD, Douglas, WY 82633Plant Summary Information
Cedar Springs II is ranked #16 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
Cedar Springs II generated 144.9 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Cedar Springs II |
|---|---|
| Utility Name | PacifiCorp |
| Location | Converse County, WY |
| Initial Operation Date | December 2020 |
| Last Update | Oct 2025 |
| Annual Generation | 632.2 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,088 out of 12,553 Power Plants Nationwide | |
| Ranked #246 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #16 out of 74 Wyoming Power Plants | |
| Ranked #7 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Cedar Springs Transmission, LLC (2019 to 2019) PacifiCorp (2020 to 2024) |
Map of Cedar Springs II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Springs II.
Monthly Net Generation for Cedar Springs II
Cedar Springs II Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Springs II (63915) |
| Plant Address | TBD, Douglas, WY 82633 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 42.96901, -105.36562 |
| Generation Dates on File | Dec 2020 to Oct 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 632.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 82634 Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 198.8 MW |
| Winter Capacity | 198.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 72 |
| Turbine Details | |
| Number Of Turbines | 72 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Cedar Springs II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #236 | Chevelon Butte Wind Farm | Winslow, AZ | 639.9 GWh |
| #237 | Sweetwater Wind 4 LLC | Roscoe, TX | 637.4 GWh |
| #238 | Limon III Wind LLC | Limon, CO | 637.3 GWh |
| #239 | Kelly Creek Wind Project | Cabery, IL | 637.0 GWh |
| #240 | Diversion Wind Energy LLC | Seymour, TX | 636.6 GWh |
| #241 | Glacier Sands Wind Power, LLC | Mason City, IL | 635.5 GWh |
| #242 | Heart of Texas Wind Project | Brady, TX | 635.0 GWh |
| #243 | Rio Bravo Windpower, LLC | Roma, TX | 634.0 GWh |
| #244 | Sugar Creek Wind One LLC | TBD, IL | 633.1 GWh |
| #245 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
| #247 | Reading Wind Project | Reading, KS | 632.0 GWh |
| #248 | Aragonne Wind LLC | Santa Rosa, NM | 631.4 GWh |
| #249 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 631.0 GWh |
| #250 | Castle Gap Wind | Goldthwaite, TX | 626.5 GWh |
| #251 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
| #252 | Foxtail Wind, LLC | Forbes, ND | 621.4 GWh |
| #253 | Coyote Wind LLC | Snyder, TX | 620.0 GWh |
| #254 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #255 | Dakota Range III Wind Project | Summit, SD | 618.2 GWh |
| #256 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Springs II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 74.5 mi |
| Anticline Wind | Casper, WY | 307.4 GWh | 51 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 55.8 mi |
| Boswell Wind | Rock River, WY | 961.0 GWh | 77 mi |
| Campbell Hill Windpower | Glenrock, WY | 254.3 GWh | 32.2 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 43.7 mi |
| Cedar Springs I | Douglas, WY | 701.1 GWh | 6.4 mi |
| Cedar Springs III | Douglas, WY | 484.0 GWh | 13.3 mi |
| Cedar Springs Wind IV | Douglas, WY | 786.1 GWh | 19.7 mi |
| Dave Johnston | Glen Rock, WY | 4.6 TWh | 22.7 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 75.7 mi |
| Glendo | Glendo, WY | 87.7 GWh | 40.4 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 24 mi |
| Guernsey | Guernsey, WY | 18.0 GWh | 56.1 mi |
| Hartzog | Wright, WY | 178.0 MWh | 60 mi |
| Laramie River Station | Wheatland, WY | 8.7 TWh | 64.3 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 30.4 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 25.4 mi |
| TB Flats | Medicine Bow, WY | 1.3 TWh | 70.3 mi |
| Top of the World Windpower Project | Glenrock, WY | 457.4 GWh | 21.5 mi |