Cedar Springs II
TBD, Douglas, WY 82633Plant Summary Information
Cedar Springs II is ranked #16 out of 73 power plants in Wyoming in terms of total annual net electricity generation.
Cedar Springs II generated 123.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Cedar Springs II |
|---|---|
| Utility Name | PacifiCorp |
| Location | Converse County, WY |
| Initial Operation Date | December 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 611.5 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,113 out of 12,539 Power Plants Nationwide | |
| Ranked #262 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #16 out of 73 Wyoming Power Plants | |
| Ranked #7 out of 31 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Cedar Springs Transmission, LLC (2019 to 2019) PacifiCorp (2020 to 2024) |
Map of Cedar Springs II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Springs II.
Monthly Net Generation for Cedar Springs II
Cedar Springs II Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Springs II (63915) |
| Plant Address | TBD, Douglas, WY 82633 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 42.96901, -105.36562 |
| Generation Dates on File | Dec 2020 to Sep 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 611.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 82634 Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 198.8 MW |
| Winter Capacity | 198.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 72 |
| Turbine Details | |
| Number Of Turbines | 72 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Cedar Springs II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #252 | Limon III Wind LLC | Limon, CO | 623.9 GWh |
| #253 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 619.8 GWh |
| #254 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #255 | King Plains Wind Project | Garber, OK | 618.0 GWh |
| #256 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
| #257 | Pioneer Hutt Wind Energy | Midland, TX | 614.7 GWh |
| #258 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #259 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
| #260 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 613.9 GWh |
| #261 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
| #263 | Bloom Wind | Minneola, KS | 610.0 GWh |
| #264 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
| #265 | Foxtail Wind, LLC | Forbes, ND | 606.6 GWh |
| #266 | White Rock East Wind Project | Anadarko, OK | 605.9 GWh |
| #267 | Oliver Wind IV | Hannover, ND | 604.8 GWh |
| #268 | Dakota Range III Wind Project | Summit, SD | 604.2 GWh |
| #269 | Merricourt Wind Energy Center | Kulm, ND | 602.7 GWh |
| #270 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
| #271 | Mesteno | Rio Grande City, TX | 602.4 GWh |
| #272 | Jumbo Hill Wind Project | Andrews, TX | 595.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Springs II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 74.5 mi |
| Anticline Wind | Casper, WY | 274.8 GWh | 51 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 55.8 mi |
| Boswell Wind | Rock River, WY | 873.9 GWh | 77 mi |
| Campbell Hill Windpower | Glenrock, WY | 263.4 GWh | 32.2 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 43.7 mi |
| Cedar Springs I | Douglas, WY | 692.7 GWh | 6.4 mi |
| Cedar Springs III | Douglas, WY | 483.8 GWh | 13.3 mi |
| Cedar Springs Wind IV | Douglas, WY | 683.4 GWh | 19.7 mi |
| Dave Johnston | Glen Rock, WY | 4.6 TWh | 22.7 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 75.7 mi |
| Glendo | Glendo, WY | 87.7 GWh | 40.4 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 24 mi |
| Guernsey | Guernsey, WY | 18.0 GWh | 56.1 mi |
| Hartzog | Wright, WY | 178.0 MWh | 60 mi |
| Laramie River Station | Wheatland, WY | 8.5 TWh | 64.3 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 30.4 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 25.4 mi |
| TB Flats | Medicine Bow, WY | 1.3 TWh | 70.3 mi |
| Top of the World Windpower Project | Glenrock, WY | 461.0 GWh | 21.5 mi |