Dover (OH)
303 East Broadway, Dover, OH 44622Plant Summary Information
Dover (OH) is ranked #5 out of 7 coal plants in Ohio in terms of total annual net electricity generation.
Dover (OH) is comprised of 4 generators and generated 16.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Dover (OH) |
|---|---|
| Utility Name | City of Dover - (OH) |
| Location | Tuscarawas County, OH |
| Initial Operation Date | January 1954 |
| Last Update | Dec 2024 |
| Annual Generation | 51.7 GWh |
| Annual Consumption | 863.3 k MMBtu |
| Ranked #4,123 out of 12,637 Power Plants Nationwide | |
| Ranked #83 out of 118 Bituminous Coal Power Plants Nationwide | |
| Ranked #71 out of 199 Ohio Power Plants | |
| Ranked #5 out of 7 Ohio Bituminous Coal Power Plants | |
| Fuel Types | Bituminous Coal : 98.7% Natural Gas : 1.3% |
Map of Dover (OH)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dover (OH).
Monthly Net Generation for Dover (OH)
Monthly Plant Fuel Consumption for Dover (OH)
Dover (OH) Details
| Summary Information | |
|---|---|
| Plant Name | Dover (OH) (2914) |
| Plant Address | 303 East Broadway, Dover, OH 44622 |
| Utility | City of Dover - (OH) (5336) |
| Latitude, Longitude | 40.52007, -81.46815 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | January 1954 |
| Annual Generation | 51.7 GWh |
| Fuel Types | Bituminous Coal : 98.7% Natural Gas : 1.3% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Tuscarawas River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Dover - (OH) (5336) OH |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
| Pipeline Notes | DOMINION EAST OHIO |
Generator 3 Details Standby January 1954
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 8 MW |
| Nameplate Power Factor | 0.89 |
| Summer Capacity | 8 MW |
| Winter Capacity | 8 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
| First Operation Date | January 1954 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating June 1966
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 2.4 MW |
| Winter Capacity | 2.4 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1966 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating June 1968
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 19.5 MW |
| Nameplate Power Factor | 0.89 |
| Summer Capacity | 15.2 MW |
| Winter Capacity | 15.2 MW |
| Minimum Load | 7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1968 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Stoker Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 6 Details Operating September 1992
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 19.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 15.3 MW |
| Winter Capacity | 15.3 MW |
| Minimum Load | 8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1992 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Dover (OH) Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #73 | Argus Cogen Plant | Trona, CA | 227.2 GWh |
| #74 | G G Allen | Belmont, NC | 197.9 GWh |
| #75 | General Chemical | Green River, WY | 212.1 GWh |
| #76 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 980.9 GWh |
| #77 | Brame Energy Center | Lena, LA | 2.8 TWh |
| #78 | Merrimack | Bow, NH | 116.0 GWh |
| #79 | Covington Facility | Covington, VA | 745.0 GWh |
| #80 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 468.1 GWh |
| #81 | Pixelle Specialty Solutions LLC - Spring | Spring Grove, PA | 389.6 GWh |
| #82 | Victor J Daniel Jr | Escatawpa, MS | 10.1 TWh |
| #84 | Ashdown | Ashdown, AR | 590.2 GWh |
| #85 | Whitewater Valley | RICHMOND, IN | 35.2 GWh |
| #86 | Archer Daniels Midland Clinton | Clinton, IA | 704.5 GWh |
| #87 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 197.9 GWh |
| #88 | Florence Mill | Florence, SC | 438.9 GWh |
| #89 | Savannah River Mill | Rincon, GA | 133.4 GWh |
| #90 | Univ of NC Chapel Hill Cogen Facility | Chapel Hill, NC | 58.3 GWh |
| #91 | Rumford Cogeneration | Rumford, ME | 405.3 GWh |
| #92 | Deerhaven Generating Station | Gainesville, FL | 623.9 GWh |
| #93 | Fernandina Beach Mill | Fernandina Beach, FL | 579.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dover (OH).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Akron WRF | Akron, OH | 5.5 GWh | 44.1 mi |
| Cardinal | Brillant, OH | 10.5 TWh | 46.9 mi |
| Carroll County Energy | Carrollton, OH | 5.2 TWh | 22.2 mi |
| Cuyahoga Falls 1 | Cuyahoga Falls, OH | 1.4 GWh | 43 mi |
| DG AMP 1048 Wadsworth | Wadsworth, OH | 10.5 GWh | 37.4 mi |
| DG AMP Rittman Rd | Wadsworth, OH | 3.5 GWh | 36.4 mi |
| DG AMP Solar Brewster | Brewster, OH | 2.3 GWh | 14.1 mi |
| DG AMP Solar Orrville 3 | Orrville, OH | 3.3 GWh | 27.8 mi |
| Dover Peaking | Dover, OH | 402.0 MWh | 2.2 mi |
| Dresden Energy Facility | Dresden, OH | 4.2 TWh | 41.7 mi |
| Guernsey Power Station | Byesville, OH | 11.6 TWh | 40.5 mi |
| IGS AKC1 | Akron, OH | 4.5 GWh | 37.1 mi |
| Morton Salt Rittman | Rittman, OH | 13.4 GWh | 35 mi |
| Orrville | Orrville, OH | 22.0 GWh | 27.7 mi |
| Orrville Peaking | Orrville, OH | 209.0 MWh | 28 mi |
| Seville | Seville, OH | 314.0 MWh | 41.2 mi |
| South Field Energy | Wellsville, OH | 7.3 TWh | 42.2 mi |
| Summit Street Power Plant | Kent, OH | 30.9 GWh | 43.6 mi |
| Wadsworth HBS RTO BTM | Wadsworth, OH | 608.0 MWh | 38.5 mi |
| Wadsworth IPS RTO BTM | Wadsworth, OH | 606.0 MWh | 41.4 mi |