Bethel Wind Farm LLC
657 CR 617, Dimmitt, TX 79027Plant Summary Information
Bethel Wind Farm LLC is ranked #36 out of 1,337 wind farms nationwide in terms of total annual net electricity generation.
Bethel Wind Farm LLC generated 389.4 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Bethel Wind Farm LLC |
---|---|
Utility Name | Southern Power Co |
Location | Castro County, TX |
Initial Operation Date | January 2017 |
Last Update | Feb 2024 |
Annual Generation | 1.2 TWh |
Annual Consumption | 4.1 M MMBtu |
Ranked #677 out of 11,455 Power Plants Nationwide | |
Ranked #36 out of 1,337 Wind Power Plants Nationwide | |
Ranked #100 out of 726 Texas Power Plants | |
Ranked #16 out of 217 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Invenergy Services LLC (2015 to 2016) Southern Power Co (2017 to 2022) |
Map of Bethel Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bethel Wind Farm LLC.
Monthly Net Generation for Bethel Wind Farm LLC
Bethel Wind Farm LLC Details
Summary Information | |
---|---|
Plant Name | Bethel Wind Farm LLC (60414) |
Plant Address | 657 CR 617 Dimmitt, TX 79027 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 34.57531, -102.4747 |
Generation Dates on File | Jan 2017 to Feb 2024 |
Initial Operation Date | January 2017 |
Annual Generation | 1.2 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southwestern Public Service Co (17718) TX |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating January 2017
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 276 MW |
Summer Capacity | 276 MW |
Winter Capacity | 276 MW |
Minimum Load | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 120 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 120 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 19.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Bethel Wind Farm LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Bethel Wind Farm LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#26 | Ranchero Wind Farm LLC | Iraan, TX | 1.3 TWh |
#27 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.3 TWh |
#28 | Red Cloud Wind LLC | Corona, NM | 1.3 TWh |
#29 | Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.3 TWh |
#30 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
#31 | Foard City Wind | Crowell, TX | 1.2 TWh |
#32 | Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh |
#33 | Neosho Ridge Wind Energy Center | Near Galesburg, KS | 1.2 TWh |
#34 | El Cabo Wind | Encino, NM | 1.2 TWh |
#35 | Mesquite Star | Roscoe, TX | 1.2 TWh |
#37 | Tahoka Wind | Tahoka, TX | 1.2 TWh |
#38 | Sage Draw Wind | Wilson, TX | 1.2 TWh |
#39 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh |
#40 | Arbor Hill Wind Farm | Greenfield, IA | 1.2 TWh |
#41 | Radfords Run Wind Farm | Maroa, IL | 1.2 TWh |
#42 | 25 Mile Creek | Gage, OK | 1.2 TWh |
#43 | Hubbard Wind | Mt Calm, TX | 1.2 TWh |
#44 | Soldier Creek Wind | Corning, KS | 1.2 TWh |
#45 | Upland Prairie | Spencer, IA | 1.2 TWh |
#46 | Santa Rita East | Barnhart, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bethel Wind Farm LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Astra Wind Farm | Happy, TX | 607.0 GWh | 27.5 mi |
Blue Cloud Wind Energy LLC | Sudan, TX | 609.8 GWh | 38.7 mi |
Broadview Energy JN, LLC | Texico, NM | 734.3 GWh | 37.6 mi |
Broadview Energy KW, LLC | Texico, NM | 583.3 GWh | 40.7 mi |
Broadview Energy Prime 2 LLC | Grady, NM | 39.0 GWh | 48.4 mi |
Broadview Energy Prime LLC | Grady, NM | 39.8 GWh | 49.8 mi |
Canadian Breaks, LLC | Vega, TX | 877.3 GWh | 44.1 mi |
Golden Spread Panhandle Wnd Rch | Wilderado, TX | 215.2 GWh | 48.5 mi |
Grady Wind Energy Center, LLC | Clovis, NM | 912.0 GWh | 36.8 mi |
Mariah del Norte | Friona, TX | 1.0 TWh | 8.7 mi |
Plant X | Earth, TX | 519.8 GWh | 28.5 mi |
SoCore Clovis 1 | Clovis, NM | 5.8 GWh | 45.6 mi |
Spinning Spur Wind II | Adrian, TX | 641.7 GWh | 49.9 mi |
Spinning Spur Wind LLC | Vegas, TX | 667.0 GWh | 48.3 mi |
Texico Wind Ranch LP | Texico, NM | 92.7 MWh | 36.9 mi |
Tolk | Muleshoe, TX | 2.8 TWh | 27.4 mi |
TX Hereford Wind | Hereford, TX | 766.0 GWh | 20.8 mi |
TX Jumbo Road Wind | Hereford, TX | 1.0 TWh | 16.1 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 8.5 GWh | 47.6 mi |
Wildorado Wind LLC | Vega, TX | 756.1 GWh | 50.5 mi |