Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| River Hills | MidAmerican Energy Co | Des Moines, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Apr 1966 | Dec 2024 | Natural Gas |
| Anderson Erickson | Anderson Erickson Dairy | Des Moines, IA | Midcontinent Independent System Operator, Inc. (MISO) | 19.0 MWh | Mar 2000 | Dec 2024 | Distillate Fuel Oil |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 699.6 GWh | May 2022 | Feb 2026 | Solar |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 666.9 GWh | Oct 2013 | Dec 2024 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 555.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 230.8 GWh | Nov 2020 | Feb 2026 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 366.7 GWh | Nov 2020 | Feb 2026 | Solar |
| Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 369.0 GWh | Nov 2021 | Feb 2026 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 182.8 GWh | Nov 2020 | Feb 2026 | Solar |
| Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 275.8 GWh | Nov 2020 | Feb 2026 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 269.3 GWh | Oct 2021 | Feb 2026 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 560.3 GWh | Nov 2021 | Feb 2026 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 779.1 GWh | Feb 2024 | Feb 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 565.2 GWh | Feb 2024 | Feb 2026 | Solar |
| Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 586.3 GWh | Aug 2023 | Feb 2026 | Solar |
| Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 588.8 GWh | Aug 2023 | Feb 2026 | Solar |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 135.4 GWh | Apr 2013 | Feb 2026 | Natural Gas |
| Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2013 | Nov 2024 | Solar |
| Deshler | City of Deshler - (NE) | Deshler, NE | Southwest Power Pool (SWPP) | 2.0 MWh | Dec 1949 | Dec 2024 | Distillate Fuel Oil |
| SR DeSoto II | SR DeSoto II, LLC | DeSoto, GA | Southern Company Services, Inc. - Trans (SOCO) | 153.8 GWh | Nov 2023 | Feb 2026 | Solar |
| SR DeSoto III | SR DeSoto III, LLC | DeSoto, GA | Southern Company Services, Inc. - Trans (SOCO) | 134.9 GWh | Nov 2023 | Feb 2026 | Solar |
| SR DeSoto I, LLC | SR DeSoto I, LLC | DeSoto, GA | Southern Company Services, Inc. - Trans (SOCO) | 303.5 GWh | Nov 2022 | Feb 2026 | Solar |
| Wildflower Solar, LLC (MS) | Duke Energy Renewables Services | DeSoto, MS | Midcontinent Independent System Operator, Inc. (MISO) | 201.4 GWh | Apr 2024 | Feb 2026 | Solar |
| WAL3432 | Walmart Stores Texas, LLC | Desoto, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 138.0 MWh | Aug 2021 | Dec 2024 | Natural Gas |
| Detour | Cloverland Electric Co-op | Detour, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Sep 1973 | Dec 2024 | Distillate Fuel Oil |
| Detroit Lakes | City of Detroit Lakes - (MN) | Detroit Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Jun 1968 | Dec 2024 | Distillate Fuel Oil |
| Delray | DTE Electric Company | Detroit, MI | Midcontinent Independent System Operator, Inc. (MISO) | 91.1 GWh | Jan 2000 | Nov 2024 | Natural Gas |
| O'Shea Solar Farm | DTE Electric Company | Detroit, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jun 2017 | Dec 2024 | Solar |
| MDFA Devens-Saratoga | Terraform Arcadia | Devens, MA | ISO New England (ISNE) | 3.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Cottonwood Energy Company LP | NRG Cottonwood Tenant LLC | Deweyville, TX | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 TWh | Jun 2003 | Feb 2026 | Natural Gas |
| Pleasant Valley (MN) | Great River Energy | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 85.9 GWh | Apr 2001 | Dec 2024 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Wapsipinicon Wind Project | EDF Renewable Asset Holdings, Inc. | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 259.7 GWh | Jan 2009 | Dec 2024 | Wind |
| Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 380.3 GWh | Nov 2008 | Dec 2024 | Wind |
| Pleasant Valley Wind Farm | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 770.3 GWh | Jul 2015 | Dec 2024 | Wind |
| GSE NM1 | Altus Power America Management, LLC | Dexter, NM | Southwest Power Pool (SWPP) | 4.7 GWh | Apr 2011 | Dec 2024 | Solar |
| Dexter Plant | Central Rivers Power US, LLC | Dexter, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Dec 1930 | Dec 2024 | Water |
| Dickerson Power | Dickerson Power, LLC | Dickerson, MD | PJM Interconnection, LLC (PJM) | 258.5 GWh | May 1959 | Feb 2026 | Natural Gas : 86.0% Distillate Fuel Oil : 14.0% |
| Montgomery County Resource Recovery | Covanta Montgomery, Inc. | Dickerson, MD | PJM Interconnection, LLC (PJM) | 234.7 GWh | Apr 1995 | Feb 2026 | Non-biogenic Municipal Solid Waste : 54.4% Biogenic Municipal Solid Waste : 44.5% Natural Gas : 1.1% |
| Brady Wind Energy Center | Brady Wind, LLC | Dickinson, ND | Southwest Power Pool (SWPP) | 632.3 GWh | Oct 2016 | Dec 2024 | Wind |
| Brady II Wind Energy Center | Brady Wind II, LLC | Dickinson, ND | Southwest Power Pool (SWPP) | 617.6 GWh | Nov 2016 | Feb 2026 | Wind |
| DG Dighton LLC CSG | DG Dighton, LLC | Dighton, MA | ISO New England (ISNE) | 4.6 GWh | Jun 2017 | Dec 2024 | Solar |
| Elm Street | ISM Solar Dighton 3, LLC | Dighton, MA | ISO New England (ISNE) | 5.1 GWh | Nov 2020 | Dec 2024 | Solar |
| MA-Dighton-A | MA CS Dighton, LLC | Dighton, MA | ISO New England (ISNE) | 2.4 GWh | May 2024 | Dec 2024 | Solar |
| ISM Solar Dighton 2, LLC CSG | 38 Degrees North, LLC | Dighton, MA | ISO New England (ISNE) | 3.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Dighton Power Plant | Dighton Power, LLC | Dighton, MA | ISO New England (ISNE) | 531.1 GWh | Apr 1999 | Dec 2024 | Natural Gas |
| Dike City Power Plant | City of Dike | Dike, IA | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | May 2005 | Dec 2024 | Distillate Fuel Oil |
| Hopkins Energy LLC | Hopkins Energy LLC | Dike, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 574.1 GWh | May 2024 | Feb 2026 | Solar |
| Dillard Complex | Roseburg Forest Products Co | Dillard, OR | PacifiCorp West (PACW) | 114.0 GWh | Dec 1954 | Dec 2023 | Wood/Wood Waste Solids : 99.2% Natural Gas : 0.8% |
| Steele Flats Wind Project LLC | Steele Flats Wind Project LLC | Diller, NE | Southwest Power Pool (SWPP) | 364.0 GWh | Sep 2013 | Feb 2026 | Wind |
| Dillingham | Nushagak Electric Coop, Inc | Dillingham, AK | 17.9 GWh | Apr 1988 | Dec 2024 | Distillate Fuel Oil | |
| Apex Solar | Apex Solar LLC | Dillon, MT | NorthWestern Corporation (NWMT) | 163.9 GWh | Jul 2023 | Feb 2026 | Solar |
| Whitetail Solar | SolRiver Capital LLC | Dillon, SC | Duke Energy Progress East (CPLE) | 22.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Bethel Wind Farm LLC | Southern Power Co | Dimmitt, TX | Southwest Power Pool (SWPP) | 1.1 TWh | Dec 2016 | Feb 2026 | Wind |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2011 | Dec 2024 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2022 | Dec 2024 | Solar |
| HCE Reams Solar, LLC | Standard Solar | Dinwiddie, VA | PJM Interconnection, LLC (PJM) | 2.9 GWh | Jul 2024 | Dec 2024 | Solar |
| Fort Powhatan Solar | Dominion Renewable Energy | Disputanta, VA | PJM Interconnection, LLC (PJM) | 305.3 GWh | Dec 2021 | Feb 2026 | Solar |
| Holly Spring Meadows | Standard Solar | District Heights, MD | PJM Interconnection, LLC (PJM) | 1.9 GWh | Jun 2023 | Dec 2024 | Solar |
| Townsend Road(CSG) | KSI II Consolidated, LLC | Dix, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 902.0 MWh | Nov 2012 | Feb 2026 | Wind |
| Dixon Hydroelectric Dam | Eagle Creek Renewable Energy, LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 11.3 GWh | May 1925 | Dec 2024 | Water |
| Lee Energy Facility | Lee County Generating Station | Dixon, IL | PJM Interconnection, LLC (PJM) | 116.8 GWh | Apr 2001 | Dec 2024 | Natural Gas |
| Rattlesnake Creek Wind Project | Rattlesnake Creek Wind Project, LLC | Dixon, NE | Southwest Power Pool (SWPP) | 877.1 GWh | Nov 2018 | Feb 2026 | Wind |
| Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Oct 2025 | Water |
| Deadwood Creek | Hydro Sierra Energy, LLC | Dobbins, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 1993 | May 2024 | Water |
| Hayes Solar, LLC | Hayes Solar, LLC | Dobson, NC | Duke Energy Carolinas (DUK) | 6.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Dodge Renewables 1 | Dodge Renewables 1, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2022 | Dec 2024 | Solar |
| G McNeilus Wind Farm Dodge Center | Justin McNeilus | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 94.0 GWh | Aug 2002 | Dec 2024 | Wind |
| Dodge Center Solar | Enel Green Power NA, Inc. | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 12.9 GWh | Nov 2016 | Dec 2024 | Solar |
| Novel Schmoll Farms Solar CSG | REA Investments, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Oct 2020 | Dec 2024 | Solar |
| Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2019 | Dec 2024 | Solar |
| Iron Star Wind Project | Engie North America | Dodge City, KS | Southwest Power Pool (SWPP) | 1.2 TWh | Nov 2021 | Feb 2026 | Wind |
| Fort Dodge | Sunflower Electric Power Corp | Dodge City, KS | Southwest Power Pool (SWPP) | 45.6 GWh | May 1969 | Feb 2026 | Natural Gas |
| Beaver Dam Solar | Wisconsin Power & Light Co | Dodge, WI | Midcontinent Independent System Operator, Inc. (MISO) | 100.2 GWh | Nov 2023 | Feb 2026 | Solar |
| Dolgeville Hydro | EONY Generation Limited | Dolgeville, NY | New York Independent System Operator (NYIS) | 11.6 GWh | Jun 1985 | Dec 2024 | Water |
| Seminole (GA) | Terraform Arcadia | Donalsonville, GA | Southern Company Services, Inc. - Trans (SOCO) | 1.2 GWh | Sep 2014 | Dec 2024 | Solar |
| Dorchester Solar Site | Massachusetts Electric Co | Dorchester, MA | ISO New England (ISNE) | 1.5 GWh | Dec 2011 | Dec 2024 | Solar |
| UMass Boston | MSS Energy Holdings, LLC (d.b.a. Calibrant Energy) | Dorchester, MA | ISO New England (ISNE) | 1.1 GWh | Dec 1971 | Dec 2024 | Solar |
| Claude Vandyke | Wolverine Power Supply Coop | Dorr, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Dec 1966 | Dec 2024 | Natural Gas |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Apr 2015 | Dec 2024 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2018 | Dec 2024 | Solar |
| Douglas | Arizona Public Service Co | Douglas, AZ | Arizona Public Service Company (AZPS) | 93.0 MWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| ASD Wallum MA Solar LLC(CSG) | ASD Wallum MA Solar LLC | Douglas, MA | ISO New England (ISNE) | 9.4 GWh | Dec 2021 | Dec 2024 | Solar |
| Bellingham PV | Terraform Arcadia | Douglas, MA | ISO New England (ISNE) | 4.3 GWh | Sep 2013 | Dec 2024 | Solar |
| Douglas Solar | Consolidated Edison Development Inc. | Douglas, MA | ISO New England (ISNE) | 2.5 GWh | Nov 2012 | Dec 2024 | Solar |
| Cedar Springs Wind IV | Cedar Springs Wind IV, LLC | Douglas, WY | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.3 TWh | - | Feb 2026 | Wind |
| Cedar Springs III | Cedar Springs Wind III, LLC | Douglas, WY | PacifiCorp East (PACE) | 500.9 GWh | Nov 2020 | Feb 2026 | Wind |
| Cedar Springs II | PacifiCorp | Douglas, WY | PacifiCorp East (PACE) | 700.9 GWh | Nov 2020 | Feb 2026 | Wind |
| Cedar Springs I | Cedar Springs Wind, LLC | Douglas, WY | PacifiCorp East (PACE) | 731.7 GWh | Nov 2020 | Feb 2026 | Wind |
| Turnipseed Solar, LLC | Southeastern Solar Farm Fund, LLC | Douglasville, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Aug 2019 | Dec 2024 | Solar |
| Energy Center Dover | Cartier Energy, LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 103.7 GWh | Apr 1985 | Feb 2026 | Natural Gas : 97.3% Distillate Fuel Oil : 2.7% |
| Van Sant Station | NAES Corporation - (DE) | Dover, DE | PJM Interconnection, LLC (PJM) | 1.3 GWh | Apr 1991 | Dec 2024 | Natural Gas |
| Garrison Energy Center LLC | Garrison Energy Center LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 911.4 GWh | May 2015 | Feb 2026 | Natural Gas : 98.5% Distillate Fuel Oil : 1.5% |
| Dover Sun Park | Arevon Energy, Inc. | Dover, DE | PJM Interconnection, LLC (PJM) | 12.1 GWh | Jun 2011 | Feb 2026 | Solar |
| Dover Solar and Battery Storage | Tampa Electric Co | Dover, FL | Tampa Electric Company (TEC) | 49.2 GWh | Nov 2023 | Feb 2026 | Solar |
| Dover (MA) | BWC Buckmaster Pond LLC | Dover, MA | ISO New England (ISNE) | 1.7 GWh | Jul 2017 | Dec 2024 | Solar |
| Cricket Valley Energy | Cricket Valley Energy Center LLC | Dover, NY | New York Independent System Operator (NYIS) | 5.4 TWh | Mar 2020 | Feb 2026 | Natural Gas |
| Wyse Fork Solar Farm, LLC | Wyse Fork Solar Farm, LLC | Dover, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Nov 2021 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |